Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

Share Price is delayed by 15 minutes
Get Live Data
162.50    15.50 (10.54%)
Bid:
160.00
Ask:
165.00
Spread: 5.00 (3.125%)
Market Cap: £14.14m
PALM Live PriceLast checked at - London Stock Exchange

Intraday Panther Metals Share Chart

Dotted Lake Update

22 Feb 2021 07:00

RNS Number : 8146P
Panther Metals PLC
22 February 2021
Β 

NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION

FOR IMMEDIATE RELEASE

Β 

PANTHER METALS PLC

("Panther" or the "Company")

(Incorporated in the Isle of Man with company numberΒ 009753V)

22nd February 2021

Canada: Dotted Lake Property - Geophysics Survey Update

Panther Metals PLC (LSE:PALM) the company focused on mineral exploration in Canada and Australia, is pleased to announce the receipt of the processed high-resolution Airborne Electromagnetic ("AEM") and Magnetics geophysics survey data and associated maps and report over the Dotted Lake Property on the north limb of the Schreiber-Hemlo greenstone belt in Ontario, Canada.

Highlights

Β· Processed data, mapping and report received for the Dotted Lake Property high-resolution airborne electromagnetic ("AEM") and magnetics ("Mag") geophysics survey (announced 13 October 2020).

Β 

Β· Canadian airborne geophysics survey company Prospectair Geosurveys ("Prospectair") flew the 818 line-km survey utilising helicopter-borne sensors over a series of seven flights conducted between 9th -11th December 2020. Prospectair also successfully flew geophysics over Panther's Big Bear Project in June 2020.

Β 

Β· A total of 138 geophysical anomalies have been identified by the survey, these are now being evaluated and prioritised for follow-up investigation.

Β 

Β· Dotted Lake Property is located 93km east of Panther's Big Bear Gold Project, 18km north of the Barrick Hemlo Mine and 34km north-east of the Marathon Palladium Project where a proposed open pit mine for palladium, platinum, gold and copper is currently undergoing permitting and planning by Generation Mining,

Darren Hazelwood, CEO, commented:

"We are delighted to announce the receipt of the processed airborne geophysics survey data, maps and report for the Dotted Lake Property in Canada. The survey was flown by Prospectair, the same company who flew AEM and Mag over the Big Bear Gold Project survey in June of 2020.

The processed data and report recommendations for the Dotted Lake survey are now being evaluated and will be used to help direct further work in addition to the drilling that is already planned for the property".

Survey Technical Details

The Dotted Lake Property area was flown with traverse lines at 50m spacing and control lines spaced every 500m. The survey lines were oriented 162degN with control lines oriented perpendicular to traverse lines. The nominal flying height aimed by the pilot was 85m, but the active topography resulted in the average helicopter height above ground of 86m, with the mag sensor and receiver coil at 61m, and the transmitter loop at 36m above the

ground. The average survey flying speed (calculated equivalent ground speed) was 31.1m/s.

Airborne Magnetometers: Geometrics G-822A

Both the ground and heliborne systems use a non-oriented (strap-down) optically-pumped Cesium split-beam sensor. These magnetometers have a sensitivity of 0.005 nT and a range of 15,000 to 100,000 nT with a sensor noise of less than 0.02 nT. The heliborne sensor is mounted in a bird made of non-magnetic material located 25 m below the helicopter when flying. Total magnetic field measurements are recorded at 10 Hz in the aircraft. The ground system is recording magnetic data at 1 sample every second with a GSM-19 Overhauser base-station magnetometer.

Real-Time Differential GPS: Omnistar DGPS

PROSPECTAIR uses an OmniStar differential GPS navigation system to provide real-time guidance for the pilot and to position data to an absolute accuracy of better than 5 m. The Omnistar receiver provides real-time differential GPS for the Agis on-board navigation system. The differential data set is relayed to the helicopter via the Omnistar network of geosynchronous satellites for the survey location. The receiver optimises the corrections for the current location.

Airborne Navigation and Data Acquisition System: Pico-Envirotec AGIS-XP system

The Airborne Geophysical Information System (AGIS-XP) is an advanced, software driven instrument specifically designed for mobile aerial or ground geophysical survey work. The AGIS instrumentation package includes an advanced Satellite navigation (GPS), real-time flight path information that is displayed over a map image (BMP format) of the area, and reliable data acquisition software. Thanks to simple interfacing, the radar and barometric altimeters, the RSI spectrometer, the Geometrics magnetometer and the ProspecTEM time-domain electromagnetic system data are easily integrated into the data acquisition system and digitally recorded. Automatic synchronisation to the GPS position and time provides very close correlation between data and geographical position. The AGIS is equipped with a software suite allowing easy maintenance, upgrades, data QC, and project and survey area layout planning.

Time-Domain Electromagnetic System: ProspecTEM

Prospectair Geosurveys significantly modified and improved the Emosquito II that was built by THEM Geophysics of Gatineau (QuΓ©bec) to develop ProspecTEM. It is a powerful light-weight system adapted for small size helicopters and easy manoeuvrability enabling the system to be flown as close to the ground as safely possible and ensuring maximum data resolution. Advanced signal processing technique and a full processing package was developed in house to optimise the ProspecTEM data.

The ProspecTEM system employs a transient or time-domain electromagnetic transmitter that drives an alternating current through an insulated electrical coil system. The towing bridle is constructed from a Kevlar rope and multi-paired shielded cables. It is attached to the helicopter by a weak link assembly. An onboard harness with outboard connectors mounted on a plate allows for quick disconnection or connection of the exterior elements. The system uses a 4 KW generator and a large condenser to transmit alternating 2.75-ms half sine pulses with intervening off-times of 13.916 ms electric pulse, 60 pulses per second.

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer: +44(0) 1462 429 743 and +44(0) 7971 957 685

Mitchell Smith, Chief Operating Officer: +1(604) 209 6678

Brokers:

SI Capital Limited

Nick Emerson +44(0) 1438 416 500

Peterhouse Capital Limited

Guy Miller and Duncan Vasey +44(0) 20 7469 0930

Β 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word β€œReach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
NRADDGDDGUDDGBB
Date   Source Headline
21st Nov 20238:08 amRNSManitou Lakes Drilling Programme Commences
20th Nov 20237:00 amRNSAppointment of Joint Broker and Manitou funding
15th Nov 20237:00 amRNSPanther Australia - Coglia Update
1st Nov 20237:00 amRNSDirectorate Change
30th Oct 20231:09 pmRNSGold Intercepts Show Potential at 40 Mile Camp
23rd Oct 20237:01 amRNSFulcrum Metals: Tully Gold Project
16th Oct 20238:41 amRNSHolding(s) in Company
3rd Oct 202311:05 amRNSFulcrum Metals Charlot-Neely Lake Uranium Project
27th Sep 20237:27 amRNSManitou Lakes: Additional Mining Claims Staked
25th Sep 20237:47 amRNSHalf-year Report
19th Sep 20233:31 pmRNSAppointment of Joint Broker
18th Sep 20237:00 amRNSFulcrum Metals: Drill Planning Update
13th Sep 20237:00 amRNSFulcrum Metals: Schreiber-Hemlo Project Update
11th Sep 20239:36 amRNSHolding(s) in Company
7th Sep 20237:01 amRNSFulcrum Metals: Strong Uranium Targets Identified
7th Sep 20237:00 amRNSInvestor Event
5th Sep 202310:01 amRNSPanther Australia - Nickel Sulphide Project Update
31st Aug 20237:00 amRNSIssue of Debt
7th Aug 20239:59 amRNSFulcrum Metals - Acquisition and Fundraise
1st Aug 202310:21 amRNSAll Drilling Complete in Western Australia
27th Jul 20237:00 amRNSBig Bear - Increase in Targets Defined
27th Jun 20237:00 amRNSDotted Lake Drill Permit
8th Jun 20233:19 pmRNSResult of AGM
18th May 202311:44 amRNSNotice of AGM
16th May 20238:24 amRNSChange of Registered Office
12th May 20237:00 amRNSAdditional Claims Staked at Obonga
11th May 20237:05 amRNSFulcrum Metals - Exploration Update
11th May 20237:00 amRNSPanther Australia - Coglia Drilling Commences
3rd May 20237:00 amRNSManitou Exploration Permit Issued
28th Apr 20237:53 amRNSPanther Australia Rights Issue Closes
27th Apr 20237:00 amRNSFinal Results
17th Apr 20237:00 amRNSFulcrum Metals: Winston Lake Project Expansion
5th Apr 202311:28 amRNSProposed Sale: Blue Mountain Project, Queensland
27th Mar 20232:01 pmRNSPanther Australia PNT Fund Raise
23rd Mar 20237:00 amRNSFulcrum Metals plc - Project Structural Study
22nd Mar 20237:55 amRNSPanther Australia: New Au and Ni targets
20th Mar 20237:00 amRNSTax Refund Received
3rd Mar 20237:00 amRNSNew Corporate Presentation
2nd Mar 20238:20 amRNSFulcrum Metals: Schreiber-Hemlo Gold Assays
1st Mar 20237:00 amRNSTotal Voting Rights
10th Feb 20237:05 amRNSFulcrum Metals PLC Placing, Proposed AIM Admission
8th Feb 20235:50 pmRNSHolding(s) in Company
8th Feb 20232:00 pmRNSHolding(s) in Company
8th Feb 20231:23 pmRNSHolding(s) in Company
8th Feb 202312:09 pmRNSHolding(s) in Company
7th Feb 20237:00 amRNSHolding(s) in Company
2nd Feb 20237:05 amRNSObonga:VMS Camp Discovery; High Grades Intersected
2nd Feb 20237:00 amRNSObonga: Flake Graphite Discovery
30th Jan 20237:00 amRNSPanther Australia: Positive Metallurgical Results
8th Dec 20228:51 amRNSPanther Australia - update re Burtville East

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.