Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.30
Bid: 24.25
Ask: 24.40
Change: 0.65 (2.75%)
Spread: 0.15 (0.619%)
Open: 23.85
High: 24.55
Low: 23.85
Prev. Close: 23.65
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update for the 6 months ended 31 Dec 2020

22 Jan 2021 07:00

Pan African Resources Plc - Operational Update for the 6 months ended 31 Dec 2020

Pan African Resources Plc - Operational Update for the 6 months ended 31 Dec 2020

PR Newswire

London, January 21

Pan African Resources PLC

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

Share code on AIM: PAF

Share code on JSE: PAN

ISIN: GB0004300496

ADR ticker code: PAFRY

(Pan African or the Company or the Group)

OPERATIONAL UPDATE FOR THE SIX MONTHS ENDED 31 DECEMBER 2020

Pan African is pleased to provide shareholders with an operational update for the six months ended 31 December 2020 (Current Reporting Period).

Key Operational Results for the Current Reporting Period

Industry leading safety performance maintained with improvements in reportable rates across all Group operations Group gold production increased by 5.9% to 98,386oz (2019: 92,941oz) Gold production from Barberton Mines for the period was 52,354oz, while Elikhulu and Evander Mines produced 26,863oz and 19,169oz respectively Operations have continued to implement and maintain stringent policies and protocols to mitigate the effects of the ongoing COVID-19 pandemic on employees and production ESG projects, including the 10MW renewable energy solar photovoltaic plant at Evander Mines and large-scale agriculture projects in Barberton Mines, are on track for commissioning in Q3 2021 Group net debt decreased by 47.3% to US$65.2 million (2019: US$123.7million) Pan African is on track to deliver its full year production guidance of approximately 190,000oz

Pan African CEO Cobus Loots commented:

 “Pan African’s financial results and increase in gold production for the first six months of the year demonstrates a commendable operational and safety performance, amidst the challenges of the ongoing COVID-19 pandemic.

Barberton Mine’s gold production of 52,354oz for the Current Reporting Period deserves recognition and demonstrates the excellent progress that this flagship asset and its operating team have made in reserve development and infrastructure optimisation.

Group net debt decreased by 47.3% to US$65.2 million relative to the six months ended 31 December 2019 (Corresponding Reporting Period), notwithstanding a record final Rand dividend distribution for the June 2020 financial year, paid in December 2020.

We expect operations at the Evander Mines’ 8 Shaft pillar to deliver a much-improved performance during the remainder of the 2021 financial year, as the pillar mining activities gather momentum.

We have now commenced with early preparation work and limited capital expenditure for the execution phase of the Egoli project. We expect to finalise the debt funding package within the first quarter of the 2021 calendar year. This organic growth project will contribute considerably to our future gold production.

The construction of the solar photovoltaic plant at Evander Mines will commence during the first quarter of the 2021 calendar year, with first power expected to be generated during the third quarter of the 2021 calendar year. This plant will be one of the first of its kind in the South African mining sector and demonstrates our commitment to ESG initiatives. In conjunction with several other projects, it also underpins the Group’s profitability and sustainability.

The Group remains on track to produce 190,000 oz of gold for the financial year ending 30 June 2021, and we are committed to continue creating value for our stakeholders by positioning Pan African as a sustainable, safe, high-margin and long-life gold producer. We look forward to presenting our interim results on 16 February 2021.”

Safety

The Group continued to maintain an industry-leading safety performance with a focus on new safety initiatives and interventions in its pursuit of a zero-harm working environment.

The lost-time injury frequency rate (‘LTIFR’) improved to 1.64 (2019: 1.69) per million man hours The reportable injury frequency rate (‘RIFR’) improved to 0.65 (2019: 0.85) per million man hours Regrettably, the Group experienced one fatality at Barberton Mines (2019: Zero) during July 2020. The details of the fatal accident were discussed in the year end results announcement released on 16 September 2020 Evander Gold Mine achieved an excellent RIFR of 1.01 (2019:3.71) per million man hours Elikhulu experienced no lost-time and reportable injuries during the past 6 months, contributing to the Group's commendable safety performance

Barberton Mines

Barberton Mines’ production increased by 10.6% to 52,354oz (2019: 47,356oz) for the Current Reporting Period. Underground production increased by 15.3% to 42,350oz (2019: 36,737oz) and Barberton Tailings Retreatment Plant (BTRP) production remained stable at 10,004oz (2019: 10,619oz) for the Current Reporting Period.

The increased production from Barberton Mines is principally due to:

Improved mining flexibility and available face length with the establishment of three high grade platforms at the Fairview mine, as well as the extension of the strike length on the 256 and 257 platforms through active delineation drilling and systematic development. Fairview mine has now established concurrent multiple platform availability. Improved recoveries at BTRP following the implementation of an oxygen Carbon-in-leach (CIL) addition project, resulting in the feed sources achieving a higher recovery than previously estimated. The high-grade section at New Consort’s Prince Consort (PC) Shaft 42 Level being successfully extracted, this orebody remains continuous along the planned strike length and up-dip to 41 Level.

Elikhulu tailings retreatment plant (Elikhulu)

Gold production from Elikhulu decreased by 8.3% to 26,863oz (2019: 29,301oz) during the Current Reporting Period, as a result of:

Lower gold recoveries from the re-mining activities on Kinross Dam 1 and 2 during the Current Reporting Period. As per the mine plan, re-mining activities have subsequently moved to Kinross Dam 3, and Kinross Dam 3’s material indicates an improvement in recoveries of approximately 5-10%, albeit at a lower head grade, relative to Dam 1 and 2 recoveries. Plant throughput was constrained by preventative maintenance and improvement work to sections of the lower Elikhulu tailings storage facility compartment and the installation of elevated drains. This work will be complete in February 2021, where after tonnage throughput will again be increased.

Gold production from Elikhulu is expected to increase in the second half of the 2021 financial year.

Evander Mines’ 8 Shaft Pillar project (8 Shaft Pillar) and surface sources

Production from the Evander Mines operations increased by 17.7% to 19,169oz (2019: 16,284oz).

Underground production increased by 9.1% to 12,607oz (2019: 11,553oz). The ramp-up in production of the 8 Shaft Pillar was slower than expected during the Current Reporting Period, as a result of:

Difficulties encountered with the initial installation of underground support pseudo-packs, which have now been resolved following the introduction of dry tailings and additional grout ranges for filler use. Production delays due to fracturing of the shaft lining following the establishment of the pillar mining in the vicinity of the shaft.

Production from the 8 Shaft Pillar is expected to further improve during the second half of the 2021 financial year.

The increased production from surface sources of 6,562oz (2019: 4,731oz) also contributed positively to the Group’s production for the Current Reporting Period.

Evander Mines Egoli Project (Egoli)

Early works and preparation for the execution phase of the Egoli project has commenced. Finalisation of the legal agreements for the implementation of Egoli’s debt funding package is also currently underway. Inception of the project’s construction is expected in the next month, with phase -1 construction and development expected to be completed in 18 months, followed by phase-2 development and equipping in the next 18 months thereafter. First gold is expected to be produced within 20 months from the project’s inception.

Group net debt

The Group’s net debt decreased by 47.3% to US$65.2 million (2019: US$123.7 million). Relative to the 30 June 2020 financial year-end, Group net debt decreased by 14.7% from US$76.4 million to US$65.2 million. The Group’s debt is denominated in South African Rand and, in US Dollar terms, the decline in net debt compared to the 30 June 2020 financial year-end, was impacted by the strengthening of the Rand relative to the US Dollar at a closing rate of US$/ZAR14.70 compared to US$/ZAR17.33 as at 30 June 2020.

The reduction in the net debt was achieved notwithstanding the cash outflow associated with the record net Rand dividend payment to shareholders in December 2020 of US$18.4 million (2019: US$2.9 million).

Interim results for the six months ended 31 December 2020

Pan African will announce its interim results on 16 February 2021.

The information contained in this update is the responsibility of the Pan African board of directors and has not been reviewed or reported on by the Group’s external auditors.

Rosebank

22 January 2021

This announcement contains inside information.

For further information on Pan African and its ESG initiatives, please visit the Company's website at www.panafricanresources.com

Contact information
Corporate Office The Firs Office Building 2nd Floor, Office 204 Cnr. Cradock and Biermann Avenues Rosebank, Johannesburg South Africa Office: + 27 (0)11 243 2900 info@paf.co.zaRegistered Office Suite 31 Second Floor 107 Cheapside London EC2V 6DN United Kingdom Office: + 44 (0)20 7796 8644
Cobus Loots Pan African Resources PLC Chief Executive Officer Office: + 27 (0)11 243 2900 Deon Louw Pan African Resources PLC Financial Director Office: + 27 (0)11 243 2900
Phil Dexter/Jane Kirton St James's Corporate Services Limited Company Secretary Office: + 44 (0)20 7796 8644Ross Allister/David McKeown Peel Hunt LLP Nominated Adviser and Joint Broker Office: +44 (0)20 7418 8900
Ciska Kloppers Questco Corporate Advisory Proprietary Limited JSE Sponsor Office: + 27 (0)11 011 9200Thomas Rider BMO Capital Markets Limited Joint Broker Office: +44 (0)20 7236 1010
Hethen Hira Pan African Resources PLC Head: Investor Relations Tel: + 27 (0)11 243 2900 E-mail: hhira@paf.co.zaWebsite: www.panafricanresources.com
Date   Source Headline
9th May 20247:00 amPRNRevised Production Guidance for the year ending 30 June 2024, Production Guidance for 2025 Financial Year and MTR Project Update
14th Feb 20247:00 amPRNUnaudited Interim financial results for the six months ended 31 december 2023
2nd Feb 20247:00 amPRNTrading Statement
29th Jan 20243:45 pmPRNHolding(s) in Company
22nd Jan 20247:00 amPRNOperational Update for the Half Year ended 31 December 2023 (H1 FY2024)
7th Dec 202310:00 amPRNHolding(s) in Company
24th Nov 20237:00 amPRNResult of AGM & Salient Dividend Dates
22nd Nov 20237:00 amPRNInterim Production Update for half year ending 31 December 2023
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
8th Nov 20232:45 pmPRNDirector/PDMR Shareholding
7th Nov 20231:30 pmPRNDirector/PDMR Shareholding
31st Oct 20237:00 amPRNNotice of AGM & Abridged Annual Financial Statements for the year ended 30 June 2023
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
13th Sep 20237:00 amPRNProvisional summarised audited results for the year ended 30 June 2023
5th Sep 202311:45 amPRNHolding(s) in Company
1st Sep 20237:00 amPRNTrading Statement for the year ended 30 June 2023
7th Aug 20237:00 amPRNOperational Update for the year ended 30 June 2023
1st Aug 20239:10 amPRNUpdate to Commissioning Date of the Mintails Project
1st Aug 20237:24 amPRNMintails Project Funding Closed and Granting of Integrated Environmental Authorisation
1st Jun 20227:00 amPRNAppointment of Berenberg as Joint Broker
12th Apr 20227:00 amPRNTransaction in Own Shares
11th Apr 20227:00 amPRNHolding(s) in Company
7th Apr 20227:00 amPRNTransaction in Own Shares
4th Apr 20227:07 amPRNTransaction in Own Shares
1st Apr 20227:00 amPRNShare Buyback Programme
14th Mar 20227:00 amPRNGold Exploration Programme in Sudan
7th Mar 20229:30 amPRNHolding(s) in Company
7th Mar 20227:00 amPRNHolding(s) in Company
2nd Mar 20227:00 amPRNHolding(s) in Company
16th Feb 20227:00 amPRNUnaudited Interim Results for 6m to 31 Dec 2021
19th Jan 20227:00 amPRNOperational Update - 31 Dec 2021
17th Jan 202212:45 pmPRNHolding(s) in Company
31st Dec 202112:41 pmRNSSecond Price Monitoring Extn
31st Dec 202112:35 pmRNSPrice Monitoring Extension
15th Dec 20217:00 amPRNAcquisition: Blyvoor Gold Surface Tailings
6th Dec 20219:00 amPRNSecondary Listing on A2X Markets
3rd Dec 20217:00 amPRNRetraction of TR-1 Form
1st Dec 20217:00 amPRNHolding(s) in Company
30th Nov 20217:00 amPRNNew Revolving Credit Facility Becomes Effective
26th Nov 20217:00 amPRNResult of AGM and Salient Dividend Dates
29th Oct 20217:01 amEQSPan African Resources (PAF): Everything falling into place
27th Oct 20218:30 amPRNNotice of AGM & No Change Statement
1st Oct 20211:30 pmPRNDirector/PDMR Shareholding
22nd Sep 20211:00 pmPRNDirector/PDMR Shareholding
21st Sep 20217:00 amPRNDirectorate Change
20th Sep 20212:30 pmPRNCOO Seriously Injured
16th Sep 20211:00 pmPRNDirector/PDMR Shareholding
15th Sep 202112:00 pmPRNDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.