Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Barruecopardo Update

23 May 2019 07:00

RNS Number : 9168Z
Ormonde Mining PLC
23 May 2019
 

23 May 2019

 

This announcement contains inside information

 

Ormonde Mining plc

 

("Ormonde" or "the Company")

 

Barruecopardo Update

 

The Board of Ormonde ("the Board") provides an update on the Barruecopardo Tungsten Project in Salamanca, Spain ("Barruecopardo" or "the Project"), where the Company holds a 30% interest.

 

· Process plant commissioning is effectively complete with the plant operating well. Throughput rates up to 190 tonnes per hour ("tph") are now being achieved on fresh ore, sufficient to meet the Project's steady state processing target of 1.1 million tonnes per annum ("Mtpa");

· Processing of low-grade ore feed from the northern starter pit has produced concentrates exceeding 74% WO3 (compared to the industry standard of 65% WO3) and close to targeted specification; operational refinements are now focused on achieving targeted specification in the near term;

· The initial ore feed from the northern starter pit, a small pit representing only the first few months of mine production, has returned lower grade than forecast due to localised complexity within this peripheral remnant zone;

· Plans are therefore being developed to target mining of higher grade ore sources in the near term, including:

o bringing forward mining in the higher grade southern starter pit, where mining has recently commenced; and

o accelerating the waste stripping of the east wall of the historic pit, from surface to around 80 metres depth ("the east wall cutback"), to bring forward access to the main orebody situated below the historic open pit.

 

Michael Donoghue, Ormonde's Chairman and Interim Managing Director, commented:

 

"The commissioning of the new process plant at Barruecopardo has essentially been completed, with the plant throughput achieving rates sufficient to meet the Project's steady state processing target of 1.1 million tonnes per annum. The concentrates produced during commissioning are close to targeted specification, so with feed grade being the critical issue the focus on the Project has now turned to developing mining procedures and revised mining schedules to target higher grade, more representative ore sources earlier in the Year-1 ramp-up schedule. This includes accelerating waste stripping to allow access to the main orebody to be brought forward."

 

Details:

 

Mining

Open pit mining currently planned for the Year-1 ramp-up period includes:

· initial ore production from two starter pits situated on the northern and southern fringes of the main ore-zone, respectively, based on more irregular, remnant mineralised zones peripheral to the main orebody and not mined by the previous operation; and

· mining out waste above the east side of the historic pit, to allow access to the main orebody located at an average depth of around 80 metres.

Open pit mining commenced at the northern starter pit, a small pit representing only the first few months of production, situated in an area where the Project's mineral resource model showed the tungsten mineralised zones to spread out from the main orebody in widely spaced and less continuous zones. This localised complexity has resulted in lower mined grades than forecast in the initial ore feed from this pit.

 

As the main orebody is a broad and more continuous high-grade zone situated below the historic open pit, the mineralisation in the northern starter pit is not representative of the deposit, but is present at surface, making it the most readily available ore for initial mining operations while dewatering and waste stripping of the open pit are carried out.

 

The following plans are currently being developed to target higher grade ore sources in the near term:

1) bringing forward mining in the southern starter pit, where recent drilling has shown higher grades and mining in this area has recently commenced;

2) accelerating the east wall cutback so that mining of the main orebody can be brought forward in the Year-1 ramp-up schedule; and

3) optimising drill-and-blast and grade control procedures to minimise dilution and optimise feed grades from the starter pits.

 

Once these plans are finalised, the effect of their implementation on Year 1 cashflows projections will be incorporated into an updated schedule.

 

 

Process plant

Commissioning of the process plant is effectively complete. Plant throughput rates of up to 190 tph are being achieved, sufficient to meet the post ramp-up production target of 1.1 Mtpa. Plant performance has been steadily improving as experience is gained and the operation moves from manual to automated control.

 

A high concentrate grade of +74% WO3 (tungsten trioxide) has been achieved using low-grade ore feed, compared to the industry standard of 65% WO3. Barruecopardo historically produced a high-grade concentrate, however it is notable that this is currently being achieved from a low-grade ore source in the northern starter pit. As a result of the low feed grade, however, the initial concentrates are reporting slightly outside targeted product specification. It is anticipated that this issue will be resolved in the near term by feeding the plant with material at more representative grades following the mining revisions described above.

 

The Project is now transitioning into the one-year ramp-up phase of production, during which time access to the southern starter pit and the main orebody will allow processing performance to be further optimised.

 

Operation of the process plant has been handed over from Fairport Engineering to Saloro, with Saloro already having control of all other minesite facilities.

 

 

Enquiries:

 

Ormonde Mining plc

Paul Carroll, Chief Financial Officer

Fraser Gardiner, Chief Operating Officer

Tel: +353 (0)1 8014184

 

Davy (Nomad, Euronext Growth Advisor and Joint Broker)

John Frain / Barry Murphy

Tel: +353 (0)1 6796363

 

SP Angel Corporate Finance LLP (Joint Broker)

Ewan Leggat 

Tel: +44 (0)20 3 470 0470

 

Capital M Consultants

Simon Rothschild

Mob: +44 (0)77 03167065

 

Murray Consultants

Mark Brennock

Tel: +353 (0)1 4980300

Mob: +353(0)872335923

 

 

Notes:

 

This announcement includes certain statements that may be deemed "forward-looking statements". Although the Company believes the forward-looking statements are based on reasonable assumptions, such statements should not be in any way construed as guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements.

 

Risk factors are typical of a mining project during development, commissioning and operation, and include (but are not limited to): the availability and / or delivery of equipment and contractor services to complete mine construction on schedule and on budget; plant performance during and after commissioning; rates of metal recovery in the process plant; mined ore tonnages and grade in comparison to estimated ore reserves; cost overruns and the potential for future additional funding requirements; and tungsten concentrate sales prices.

 

Barruecopardo is a fully permitted and funded mining project currently being developed through a US$99.7 million funding package agreed with Oaktree Capital Management (70% interest). Ormonde's participation in the Project is held through its 30 per cent minority interest in Barruecopardo Joint Venture BV, a company which is governed by a Shareholder Agreement which provides for certain rights and obligations for each party.

 

 For more information, visit www.ormondemining.com 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDPGURPAUPBGBP
Date   Source Headline
20th Aug 20091:01 pmRNSAGM Result
20th Jul 20093:09 pmRNSIssue of Equity
13th Jul 20097:00 amRNSLa Zarza Exploration Deal
30th Jun 200910:33 amRNSAnnual Report and Accounts
26th May 20097:00 amRNSPreliminary Results 2008
6th May 20092:01 pmRNSShareholder Notification
21st Apr 20097:00 amRNSTungsten Testwork
12th Jan 20097:00 amRNSDrilling Report
28th Oct 20087:00 amRNSDrilling Report
6th Oct 20087:00 amRNSDrilling Report
23rd Sep 20085:32 pmRNSShareholder Notification
22nd Sep 20087:00 amRNSInterim Results
22nd Jul 20087:00 amRNSIEX Notice
21st Jul 20085:16 pmRNSShareholder Notification
15th Jul 200811:15 amRNSIssue of Equity
17th Jun 20087:00 amRNSDrilling Report
12th Jun 20081:03 pmRNSResult of AGM
12th Jun 20087:00 amRNSOperational Update
13th May 20086:00 amRNSFinal Results
16th Apr 20087:00 amRNSBoard Appointment
1st Apr 20087:00 amRNSDrilling Report
26th Feb 20087:00 amRNSDrilling Update
6th Feb 20087:01 amRNSLa Zarza Feasibility Study
24th Jan 20087:01 amRNSTungsten Resource Update
10th Jan 20087:00 amRNSIEX Notice
4th Jan 20085:16 pmRNSAdditional Listing
6th Dec 20077:00 amRNSDrilling Report
5th Dec 20074:00 pmRNSDirectorate Change
4th Dec 20074:10 pmRNSHolding in Company
30th Nov 200712:30 pmRNSHolding in Company
30th Nov 20077:00 amRNSIEX Notice
28th Nov 20072:29 pmRNSHolding in Company
27th Nov 20077:00 amRNSEquity Fundraising
13th Nov 20077:01 amRNSTungsten Update
8th Nov 20077:01 amRNSDrilling Update
1st Nov 20077:01 amRNSDrilling Report
28th Sep 20074:27 pmRNSBrochure of Particulars
27th Sep 20077:02 amRNSTungsten Drilling Results
24th Sep 20077:01 amRNSInterim Results
17th Aug 20072:26 pmRNSAIM Rule 26
7th Aug 20077:01 amRNSDrilling Report
30th Jul 200710:20 amRNSHolding in Company
26th Jul 20073:25 pmRNSResults of AGM
17th Jul 200710:28 amRNSPlacing
12th Jul 20077:00 amRNSLa Zarza Update
26th Jun 20073:12 pmRNSDocument Availability
6th Jun 20077:00 amRNSIEX Notice
30th May 20075:38 pmRNSAdditional Listing
16th May 20077:01 amRNSPreliminary Results
15th May 20074:16 pmRNSHolding in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.