Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOracle Power Regulatory News (ORCP)

Share Price Information for Oracle Power (ORCP)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    -0.0025 (-4.17%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £9.04m
ORCP Live PriceLast checked at - London Stock Exchange

Intraday Oracle Power Share Chart

Q2 2024 Update & Shareholder Q&A

7 Aug 2024 12:14

RNS Number : 5870Z
Oracle Power PLC
07 August 2024
 

7 August 2024

Oracle Power PLC

("Oracle" or the "Company")

 

Q2 2024 Update & Shareholder Q&A

 

Oracle Power PLC (AIM: ORCP), an international project developer, is pleased to provide the following update in respect of its activities during Q2 2024 as it progresses the development of its project portfolio.

 

Northern Zone Intrusive Hosted Gold Project ("Northern Zone"), Australia

· Drilling commenced in May with two contracted rigs undertaking reverse circulation (RC) and air core (AC) drilling programmes.

· Programme designed to test for supergene gold and conduct step-out drilling to support the estimation of a maiden JORC compliant gold resource.

· Completed drilling programme:

- RC drilling comprised six holes for a total of 1,363m, with 1,100 samples collected;

- AC drilling comprised 27 holes for a total of 1,772m, with 662 samples collected.

· AC drilling programme more than doubled the prospective gold system's footprint by tagging basement geology, expanding the mineralised porphyry. The exploration target for the project is estimated at 2.5Moz to 4.8Moz of gold (as announced by Riversgold Limited on 9 May 2023).

· RC drilling programme confirmed high-grade gold intercepts, highlighting significant mineralisation at various depths.

· Drilling resumed post period end in late July 2024, following receipt of the assay results of the RC and AC drilling programmes, targeting the shallower portion of the mineralised system that had previously yielded significant intercepts, and an identified fault believed to be a controlling feature of mineralisation. Approximately 1,500m of drilling is planned on a nominal 25m grid, estimated to take around two weeks to complete.

 

Blue Rock Valley Copper and Silver Project ("Blue Rock"), Australia

· Secured option and subsequently completed the acquisition of a 100% interest in Blue Rock, where assays from historical drilling and rock chip sampling suggest the presence of high-grade copper and silver mineralisation as well as the potential for uranium.

· Company's consultant geologists initiated on-site assessments to explore the potential for copper, lead, zinc, and silver deposits. Initial tasks include evaluating the benefits of a geochemical sampling programme, considering a ground gravity geophysical programme, and field-verifying an Electromagnetic (EM) anomaly in a syncline of sedimentary rocks.

· Geologists recovered high-grade copper samples during a recent site visit post period end. Assay results from rock chip and grab samples confirmed historical evidence of copper mineralisation, with grades ranging from 8.56% to 25.70% copper.

· Company is now focusing on refining exploration techniques, including ground gravity and EM surveys - quotes for a ground-based EM survey over an airborne EM anomaly are being obtained, with plans to undertake drilling when viable.

· Further targeting tools will be assessed to refine and develop exploration targets. Exploration will also target potential gold and uranium deposits within the Ashburton Basin.

 

Green Hydrogen and Renewable Power Project, Pakistan

· Completed Environmental & Social Impact Assessment (ESIA) for proposed 1.3 GW renewable power plant and submitted it to the Sindh Environmental Protection Agency (SEPA) for review.

· Awarded a "no objection certificate" (NOC) from SEPA based on the Initial Environmental Examination (IEE) report, which is a part of the Environmental and Social Impact Assessment report, giving permission for the construction of the proposed 1.3 GW renewable energy power plant.

· Granted an extension in the validity period of the Letter of Intent by the Directorate of Alternative Energy of the Government of Sindh for the development of the proposed 1.3 GW renewable energy power plant in Jhimpir, Sindh to 23 January 2025 to provide for further accelerated development.

· The preliminary report for the Grid Interconnection Study, funded and completed by State Grid China, has been received post period end. This report is currently under review by the National Transmission and Dispatch Company (NTDC) and Power Planners International (PPI). Discussions are underway to refine and enhance the requirements for the grid connection scheme. The final report is anticipated soon.

 

Corporate

· Raised gross proceeds of £300,000 by way of an equity subscription to support further development of the Company's projects in Australia, advancing the green hydrogen project through the joint venture with His Highness Sheikh Ahmed Dalmook Al Maktoum, and for general working capital purposes.

· Post period end, appointed Emma Priestley to the Board as a Non-Executive Director. Ms. Priestley has over 20 years' experience in the mining and financial services sectors, during which she has overseen several corporate restructurings and mining operations in various jurisdictions including West Africa and Asia.

 

Naheed Memon, CEO of Oracle, commented: "This quarter has been very busy as we have significantly advanced the development of the green hydrogen project. We also increased our footprint in WA through the acquisition of a highly prospective copper project and in parallel our farm-in partner at Northern Zone continued to advance exploration towards possible JORC gold resource estimation. We look forward to reporting on further progress during the third quarter of 2024."

 

A shareholder Q&A session will be published on the Company's website on 14 August 2024. To submit questions, please email oracle@stbridespartners.co.uk with "Q2 2024 Shareholder Q&A" in the subject line; the deadline for submission of questions is 12pm on 12 August 2024.

 

*ENDS*

For further information visit www.oraclepower.co.uk or contact:

 

Oracle Power PLC

Naheed Memon - CEO

+44 (0) 203 580 4314

Strand Hanson Limited

Nominated Adviser & Joint Broker

Rory Murphy, Matthew Chandler, Rob Patrick

+44 (0) 20 7409 3494

St Brides Partners Limited

Financial PR

Susie Geliher, Isabel de Salis

oracle@stbridespartners.co.uk

 

 

 

 

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUPUPGRUPCGGM
Date   Source Headline
8th Jun 20177:00 amRNSMarket Update
24th May 20171:35 pmRNSNotice of Annual General Meeting
10th May 201711:21 amRNSResults for the Year Ended 31 December 2016
9th Jan 20177:00 amRNSChina Pakistan Economic Corridor
5th Jan 20171:00 pmRNSHolding(s) in Company
21st Dec 20169:38 amRNSChange in registered office address
4th Oct 20167:00 amRNSBoard Changes
15th Sep 20169:39 amRNSHoldings in Company
14th Sep 20167:00 amRNSUNAUDITED INTERIM RESULTS FOR 6 MONTHS TO 30 JUNE
17th Jun 20167:00 amRNSDetermination of Feasibility Stage Coal Price
7th Jun 20166:08 pmRNSHolding(s) in Company
3rd Jun 20163:34 pmRNSStatement regarding Share Price Movement
22nd Apr 20162:58 pmRNSAppointment of Interim Chairman
20th Apr 20166:08 pmRNSResult of AGM
24th Mar 20169:26 amRNSHoldings in Company
21st Mar 20167:00 amRNSExtension of IRR arrangement
18th Mar 20167:00 amRNSResults for the Year Ended 31 December 2015
5th Nov 20157:00 amRNSLetter of No Objection on 600 MW Power Plant
16th Oct 20154:40 pmRNSSecond Price Monitoring Extn
16th Oct 20154:35 pmRNSPrice Monitoring Extension
12th Oct 20157:00 amRNSSigning of Consortium Agreement
24th Sep 20157:00 amRNSUnaudited Interim Results
11th Aug 20151:11 pmRNSAdmission of Coal Price Petition
4th Jun 20157:00 amRNSHolding(s) in Company
4th Jun 20157:00 amRNSHolding(s) in Company
20th May 20152:49 pmRNSResult of AGM
14th Apr 20157:00 amRNSFinal Results
17th Mar 20157:00 amRNSEXTENSION TO SEPCO EPC FRAMEWORK AGREEMENT
11th Mar 20157:00 amRNSChina-Pakistan Economic Corridor
25th Feb 20156:27 pmRNSCorrection: Result of General Meeting
25th Feb 201511:27 amRNSResult of General Meeting
23rd Feb 20157:00 amRNSMINING LEASE RESTORATION
9th Feb 20157:00 amRNSEquity Placing and Operational Update
6th Jan 20157:00 amRNSProgress Towards Reinstatement of Mining Lease
23rd Dec 20149:03 amRNSDiscussions with SEPCO continue
22nd Dec 20147:00 amRNSAppointment of Joint Broker
11th Dec 20147:00 amRNSMining Lease
25th Sep 20147:00 amRNSEPC Framework Agreement with SEPCO
23rd Sep 20147:00 amRNSInterim Results
16th Sep 20147:00 amRNSEquity Placing
21st May 20144:29 pmRNSResult of AGM
16th Apr 20147:00 amRNSResults for the Year ended 31 December 2013
17th Jan 201412:43 pmRNSMilestone development of Block VI, Thar Project
21st Nov 20137:00 amRNSOracle signs MOU with Chinese power group SEPCO
25th Oct 20137:00 amRNSCash Box Placing
30th Sep 20131:36 pmRNSUnaudited Interim Results
24th Sep 20137:00 amRNSJoint Development Agreement Signed
19th Aug 20133:47 pmRNSAdjournment of General Meeting
30th Jul 20137:00 amRNSNotice of General Meeting
23rd May 20137:00 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.