Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOracle Power Regulatory News (ORCP)

Share Price Information for Oracle Power (ORCP)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    -0.0025 (-4.17%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £9.04m
ORCP Live PriceLast checked at - London Stock Exchange

Intraday Oracle Power Share Chart

Copper Samples Taken from Blue Rocks Project

27 Jun 2024 07:00

RNS Number : 0500U
Oracle Power PLC
27 June 2024
 

27 June 2024

Oracle Power PLC

("Oracle" or the "Company")

 High-Grade Copper Samples Taken from Blue Rocks Project in Australia

 

Oracle Power PLC (AIM:ORCP), an international project developer, is pleased to update that further to its announcement on 19 June 2024, company consultant geologists have recovered what they consider to be on initial analysis excellent copper samples from site at the Blue Rock Valley Copper and Silver Project (the "Project"). 

 

Figures 1 to 5 show samples of what appear to be very high-grade copper mineralisation, which has led to the name of the project. The Project is located 165km southeast of Onslow, the main port for the region's Iron and LNG exports, which is a multi-user port. The Project site is accessed from the North West Coastal Highway on a well-maintained unsealed road. Refer to Figure 6 below for location.

 

Highlights:

· Company consultant geologists have now completed a site visit to Blue Rock Valley

· Samples have been logged, recorded and taken to Perth for analysis

· Samples will be submitted for assay this week and results will be announced in due course

· On confirmation of the high-grade samples from the laboratory, the Company will:

- Further refine the benefits of ground gravity, electromagnetics or other geophysical programme over the greater project area

- Get quotes for a ground based electromagnetic ("EM") survey over an airborne EM anomaly that was defined as a result of prior work that is undrilled and untested and sits in a syncline of sedimentary rocks that are potentially ideal for base metals (copper, lead, zinc) and silver to be deposited.

- Undertake drilling when viable.

· Further targeting tools will continue to be assessed in order to refine and develop targets

· Gold and uranium are also being targeted as these deposit types occur within the Ashburton Basin

 

Naheed Memon, CEO of Oracle, commented:

"I am very pleased to announce that we have completed a site visit to Blue Rocks, where company geologists took copper samples and photos of mineralisation and the project area. I look forward to the assay results from the laboratory, that will assist in the next steps forward. We will also continue to assess the Project for gold and uranium."

 

About Blue Rock Valley Copper and Silver Project:

 

The Project Tenement:

The Project tenement (the "Tenement") covers 32 Blocks (approximately 102km2) (see Figure 6 below) and is composed of one granted exploration licence, E08/3604. Oracle Power announced on the 11 June 2024 that it had exercised its option to acquire 100% of the tenement. The Tenement was granted on 2 October 2023 and expires on 26 October 2028, but is renewable. The first term is therefore five years with a possible initial extension of five years and further extensions of two years thereafter, with 40% of the licence area to be surrendered at the end of year six.

 

-END-

 

For further information on Oracle Power PLC, visit the Company's website www.oraclepower.co.uk or contact:

 

Oracle Power PLC

Naheed Memon - CEO +44 (0) 20 7236 1177

 

Strand Hanson Limited (Nominated Adviser & Joint Broker)

Rory Murphy, Matthew Chandler, Rob Patrick +44 (0) 20 7409 3494

 

St Brides Partners Limited (Financial PR)

Susie Geliher +44 (0) 20 7236 1177

 

 

Figure 1: Photo of Rich Copper Oxide Sample from Historical Run of Mine pile next to Historical Shaft at Blue Rock Valley.

 

Figure 2: Photo of Rich Copper Oxide Sample from Historical Run of Mine pile next to Historical Shaft at Blue Rock Valley.

Figure 3: Photo of Rich Copper Oxide within Historical Trench near main shaft at Blue Rock Valley.

 

 

Figure 4: Photo of one of the covered up historical shafts at Blue Rock Valley.

Figure 5: Photo of Blue Rock Valley which runs up to the right-hand side of the photo.

Figure 6: Blue Rock Valley project location and access

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFFMLTMTTTBFI
Date   Source Headline
8th Jun 20177:00 amRNSMarket Update
24th May 20171:35 pmRNSNotice of Annual General Meeting
10th May 201711:21 amRNSResults for the Year Ended 31 December 2016
9th Jan 20177:00 amRNSChina Pakistan Economic Corridor
5th Jan 20171:00 pmRNSHolding(s) in Company
21st Dec 20169:38 amRNSChange in registered office address
4th Oct 20167:00 amRNSBoard Changes
15th Sep 20169:39 amRNSHoldings in Company
14th Sep 20167:00 amRNSUNAUDITED INTERIM RESULTS FOR 6 MONTHS TO 30 JUNE
17th Jun 20167:00 amRNSDetermination of Feasibility Stage Coal Price
7th Jun 20166:08 pmRNSHolding(s) in Company
3rd Jun 20163:34 pmRNSStatement regarding Share Price Movement
22nd Apr 20162:58 pmRNSAppointment of Interim Chairman
20th Apr 20166:08 pmRNSResult of AGM
24th Mar 20169:26 amRNSHoldings in Company
21st Mar 20167:00 amRNSExtension of IRR arrangement
18th Mar 20167:00 amRNSResults for the Year Ended 31 December 2015
5th Nov 20157:00 amRNSLetter of No Objection on 600 MW Power Plant
16th Oct 20154:40 pmRNSSecond Price Monitoring Extn
16th Oct 20154:35 pmRNSPrice Monitoring Extension
12th Oct 20157:00 amRNSSigning of Consortium Agreement
24th Sep 20157:00 amRNSUnaudited Interim Results
11th Aug 20151:11 pmRNSAdmission of Coal Price Petition
4th Jun 20157:00 amRNSHolding(s) in Company
4th Jun 20157:00 amRNSHolding(s) in Company
20th May 20152:49 pmRNSResult of AGM
14th Apr 20157:00 amRNSFinal Results
17th Mar 20157:00 amRNSEXTENSION TO SEPCO EPC FRAMEWORK AGREEMENT
11th Mar 20157:00 amRNSChina-Pakistan Economic Corridor
25th Feb 20156:27 pmRNSCorrection: Result of General Meeting
25th Feb 201511:27 amRNSResult of General Meeting
23rd Feb 20157:00 amRNSMINING LEASE RESTORATION
9th Feb 20157:00 amRNSEquity Placing and Operational Update
6th Jan 20157:00 amRNSProgress Towards Reinstatement of Mining Lease
23rd Dec 20149:03 amRNSDiscussions with SEPCO continue
22nd Dec 20147:00 amRNSAppointment of Joint Broker
11th Dec 20147:00 amRNSMining Lease
25th Sep 20147:00 amRNSEPC Framework Agreement with SEPCO
23rd Sep 20147:00 amRNSInterim Results
16th Sep 20147:00 amRNSEquity Placing
21st May 20144:29 pmRNSResult of AGM
16th Apr 20147:00 amRNSResults for the Year ended 31 December 2013
17th Jan 201412:43 pmRNSMilestone development of Block VI, Thar Project
21st Nov 20137:00 amRNSOracle signs MOU with Chinese power group SEPCO
25th Oct 20137:00 amRNSCash Box Placing
30th Sep 20131:36 pmRNSUnaudited Interim Results
24th Sep 20137:00 amRNSJoint Development Agreement Signed
19th Aug 20133:47 pmRNSAdjournment of General Meeting
30th Jul 20137:00 amRNSNotice of General Meeting
23rd May 20137:00 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.