Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrosur Mining Regulatory News (OMI)

Share Price Information for Orosur Mining (OMI)

Share Price is delayed by 15 minutes
Get Live Data
17.65    0.00 (0.00%)
Bid:
17.50
Ask:
17.80
Spread: 0.30 (1.714%)
Market Cap: £71.38m
OMI Live PriceLast checked at - London Stock Exchange

Intraday Orosur Mining Share Chart

Positive Drill Results Continue at Anzá

13 Dec 2024 07:00

RNS Number : 9313P
Orosur Mining Inc
13 December 2024
 

 

 

 

Orosur Mining Inc - Positive Drill Results Continue at Anzá

 

· Assays from third hole (PEP014) received.

· Composite intersection of 75.1m @ 5.58g/t Au from surface.

 

London, December 13th, 2024. Orosur Mining Inc. ("Orosur" or the "Company") (TSXV/AIM:OMI), is pleased to announce an update on the progress of exploration activities at the Company's flagship Anzá Project ("Project") in Colombia.

 

ANZÁ Project

The Anzá Project is now 100% owned by the Company following recent completion of a Share Purchase Agreement (SPA), announced 28th November 2024, whereby the Company purchased all of the shares of its previous JV partner, Minera Monte Aguila ("MMA").

 

The Project is located 50km west of Medellin and is easily accessible by all-weather roads and boasts excellent infrastructure including water, power, communications as well as a large exploration camp. 

 

Pepas

The Pepas Prospect is in the northern extent of the Anzá Project (pre-acquisition) over 10km north of the central base at APTA (Figure 1).

 

Figure 1. Anzá Project - prospects

Post completion of the transaction to buy its previous JV partner, MMA, the Company began drilling at the Pepas prospect in mid-November 2024.

 

Drilling commenced with hole PEP012, which was positioned to confirm previous high-grade results in hole PEP001, drilled by MMA in 2022.

 

Holes PEP013, 014 and 015 were then rotated some 51 degrees eastward from PEP012 to begin to test what was considered by the Company's geological teams to be the controlling trend of SE to NW. As well as defining thick zones of high-grade mineralisation, a target for these holes was a clearly defined basement fault that seemed to act as a distinct marker bed to define the trend.

 

 

Figure 2. Plan of holes

 

PEP014 entered mineralised tuffs just below surface, and continued in high grade mineralisation until the basement fault was intersected at 75m. The hole was terminated at 78m.

Figure 3. Section, PEP014

 

Most of the length of PEP014 above the fault, was mineralised with a composite intersection of 75.1m @ 5.58g/t Au being calculated, from surface.

 

Hole Number 

From (m) 

To (m) 

Interval (m) 

Au (g/t) 

PEP014

0

75.1

75.1

5.58

including

12.85

24.35

11.5

8.34

including

30.25

44.2

13.95

13.68

Table 1. Drill Intercepts

 

 

Discussion and ongoing drilling

Holes PEP013 through PEP015 all intersected the basement fault roughly where expected, providing substantial weight to the interpreted trend. Assays from Hole PEP015 are currently with the lab for analysis.

 

Hole PEP016 is currently underway and is directed on the same azimuth, but positioned some distance to the SW, to test the mineralisation, overburden and structure down dip (Figure 2).

Orosur CEO Brad George commented:

"Results from PEP014 continue the story that there is something at Pepas. Work to date has been very geologically focussed in trying to define trends and we now think we have some inkling so we look forward to progressing our drill programme and developing this picture."

 

For further information, visit www.orosur.ca, follow on X @orosurm or please contact:

 

Orosur Mining Inc

Louis Castro, Chairman,

Brad George, CEO

info@orosur.ca

Tel: +1 (778) 373-0100

 

SP Angel Corporate Finance LLP - Nomad & Joint Broker

Jeff Keating / Caroline Rowe

Tel: +44 (0) 20 3470 0470

 

Turner Pope Investments (TPI) Ltd - Joint Broker

Andy Thacker/James PopeTel: +44 (0)20 3657 0050

 

Flagstaff Communications and Investor Communications

Tim ThompsonMark EdwardsFergus Mellon

orosur@flagstaffcomms.com

Tel: +44 (0)207 129 1474

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR') which has been incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 

 

Drill Hole Details - Pepas prospect 2022/2024 Programme*

Hole ID

Easting (m)

Northing (m)

Elevation asl (m)

Dip (°)

Azimuth (°)

PEP-001

403384

705000

1001

-50

150

PEP-002

403384

705000

1001

-60

290

PEP-003

403240

705142

1001

-49.60

95.2

PEP-004

403508

705671

838

-59.8

99.8

PEP-005

403373

704990

1008

-49.8

94.6

PEP-007

403374

704990

1008

-69.9

170

PEP-008

403232

704803

971

-50

60

PEP-009

403032

705057

1055

-50

80

PEP-010

403375

705106

982

-50.31

190.4

PEP-011

403573

704939

1001

-50.3

255

PEP-012**

403415

704890

997

-56

352

PEP-013**

403413

704887

997

-50

43

PEP-014

403400

704910

1007

-50

43

PEP-015

403375

704938

1017

-50

43

PEP-16

403326

704912

999

-50

43

 

Coordinates WGS84, UTM Zone 18

** Preliminary coordinates with handheld GPS. To be later verified by survey

 

About Orosur Mining Inc.

 

Orosur Mining Inc. (TSXV: OMI; AIM: OMI) is a minerals explorer and developer currently operating in Colombia, Argentina and Nigeria.

 

 

About the Anzá Project

Anzá is a gold exploration project, comprising three exploration licences, four exploration licence applications, and several small exploitation permits, totalling 176km2 in the prolific Mid-Cauca belt of Colombia. Post the acquisition of Minera Monte Aguila S.A.S, the area of the Project has increased substantially to approximately 400km2 due to the acquisition of a number of additional applications that were owned by Minera Monte Aguila S.A.S.

 

The Anzá Project is currently wholly owned by Orosur via its subsidiaries, Minera Anzá S.A. and Minera Monte Aquila S.A.S.

 

The project is located 50km west of Medellin and is easily accessible by all-weather roads and boasts excellent infrastructure including water, power, communications and large exploration camp.

 

Qualified Persons Statement

The information in this news release was compiled, reviewed and verified by Mr. Brad George, BSc Hons (Geology and Geophysics), MBA, Member of the Australian Institute of Geoscientists (MAIG), CEO of Orosur Mining Inc. and a qualified person as defined by National Instrument 43-101.

 

Orosur Mining Inc. staff follow standard operating and quality assurance procedures to ensure that sampling techniques and sample results meet international reporting standards.

 

Drill core is split in half over widths that vary between 0.3m and 2m, depending upon the geological domain. One half is kept on site in the Minera Anzá core storage facility, with the other sent for assay.

 

Industry standard QAQC protocols are put in place with approximately 10% of total submitted samples being blanks, repeats or Certified Reference Materials (CRMs).

 

Samples for holes PEP-001 to PEP-011 were sent to the Medellin preparation facility of ALS Colombia Ltd, and then to the ISO 9001 certified ALS Chemex laboratory in Lima, Peru.

 

Samples from PEP-012 onwards are sent to Medellin laboratory of Actlabs for preparation and assay.

 

30 gram nominal weight samples are then subject to fire assay and AAS analysis for gold with gravimetric re-finish for overlimit assays of >5 g/t. ICP-MS Ultra-Trace level multi-element four-acid digest analyses may also undertaken for such elements as silver, copper, lead and zinc, etc.

 

Gold intersections are reported using a lower cut-off of 0.3g/t Au over 3m.

 

Forward Looking Statements

 

All statements, other than statements of historical fact, contained in this news release constitute "forward looking statements" within the meaning of applicable securities laws, including but not limited to the "safe harbour" provisions of the United States Private Securities Litigation Reform Act of 1995 and are based on expectations estimates and projections as of the date of this news release.

 

Forward-looking statements include, without limitation, the continuing focus on the Pepas prospect, the exploration plans in Colombia and the funding of those plans, and other events or conditions that may occur in the future. There can be no assurance that such statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such forward-looking statements. Such statements are subject to significant risks and uncertainties including, but not limited to those described in the Section "Risks Factors" of the Company's MD&A for the year ended May 31, 2024. The Company's continuance as a going concern is dependent upon its ability to obtain adequate financing, to reach profitable levels of operations and to reach a satisfactory closure of the Creditor´s Agreement in Uruguay. These material uncertainties may cast significant doubt upon the Company's ability to realize its assets and discharge its liabilities in the normal course of business and accordingly the appropriateness of the use of accounting principles applicable to a going concern. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events and such forward-looking statements, except to the extent required by applicable law.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBRBDDBBBDGSD
Date   Source Headline
9th Jun 20267:00 amRNSNew mineralised zones discovered at APTA
1st Jun 20267:00 amRNSTotal Voting Rights
19th May 20267:00 amRNSExercise of RSUs
13th May 20267:00 amRNSPepas West Expanding
1st May 20267:00 amRNSGranting of RSUs
30th Apr 20267:00 amRNSTotal Voting Rights
29th Apr 20267:00 amRNSResults for the Third Quarter ended February 28
28th Apr 20267:00 amRNSEl Cedro sampling opens new horizons
14th Apr 20267:00 amRNSNew mineralised zone discovered near Pepas
26th Mar 20267:00 amRNS43-101 technical report for its Anza Project
27th Feb 20267:00 amRNSTotal Voting Rights
26th Feb 20267:00 amRNSExercise of RSUs
10th Feb 20267:00 amRNSMaiden Mineral Resource Estimate at Pepas
30th Jan 20267:00 amRNSTotal Voting Rights
26th Jan 20267:00 amRNSResults for Second Quarter ended November 30, 2025
14th Jan 20267:00 amRNSBlock listing six monthly return
8th Jan 20267:00 amRNSAnzá restarts with strong set of drilling results
31st Dec 20257:00 amRNSTotal Voting Rights
31st Dec 20257:00 amRNSTotal Voting Rights
17th Dec 20252:19 pmRNSAGM Results, Investor Q&A Session
15th Dec 20257:00 amRNSConsultants Exercise Options
12th Dec 20257:00 amRNSPepas MRE drilling near completion
1st Dec 20257:00 amRNSExercise of Warrants and Total Voting Rights
21st Nov 20257:00 amRNSNotification of Investor Q&A Session
4th Nov 20257:00 amRNSExercise of RSUs and options
31st Oct 20257:00 amRNSExercise of Warrants and Total Voting Rights
30th Oct 20257:00 amRNSOperational Update Exploration Footprint Expanding
24th Oct 20257:00 amRNSResults for First Quarter ended August 31, 2025
16th Oct 20253:13 pmRNS-RNew Corporate Investor Presentation
8th Oct 20257:00 amRNSNotification of Investor Webinar
7th Oct 20257:00 amRNSPepas drilling continues to intersect high grades
2nd Oct 20254:48 pmRNSClose of Private Placement for Gross Proceed C$20M
30th Sep 202511:00 amRNSTotal Voting Rights
29th Sep 20257:00 amRNSFull Year 2025 Results
25th Sep 20257:00 amRNSCorporate update, Exercise of options and warrants
18th Sep 20253:22 pmRNSUpsize of Brokered Private Placement up to C$20M
18th Sep 20257:00 amRNSPrivate Placement for Gross Proceeds up to C$17m
9th Sep 20257:00 amRNSHigh grades continue Pepas, El Cedro prospectivity
1st Sep 20257:00 amRNSExercise of Warrants and Total Voting Rights
26th Aug 20257:00 amRNSInfill continues to deliver, 71.85m @ 6.13g/t Au
5th Aug 20257:00 amRNSInfill drilling hits 104m @ 6.61g/t Au at Pepas
1st Aug 20257:00 amRNSSale of stake in Company
17th Jul 20257:20 amRNSOrosur drills 62.3m @ 12.76g/t Au at Pepas
15th Jul 20257:00 amRNSBlock listing six monthly return
14th Jul 20257:00 amRNSPepas moving into MRE drilling programme
28th May 20257:01 amRNSInvestor Webinar
28th May 20257:00 amRNSOrosur Mining Inc – Pepas Advancing
6th May 20257:00 amRNSDirector Purchase of shares
2nd May 20257:00 amRNSGranting of RSUs
30th Apr 20257:00 amRNSExercise of Warrants and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.