Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Shallow Drilling Programme

22 Jun 2006 16:33

Max Petroleum PLC22 June 2006 This announcement replaces the earlier announcement (RNS No 0369F) released at15.35 today where the title should have read "Shallow Drilling Programme". Max Petroleum ("Max Petroleum" or "the Company") Operational Update - Shallow Drilling Programme Max Petroleum (AIM:MXP) is pleased to announce that the shallow well drillingprogramme in the Block E licence area, western Kazakhstan, is expected tocommence in July. The Company expects to achieve initial production in August2006. Shallow Drilling Programme As announced on 22 May 2006, the first four shallow drilling targets have beenidentified in Block E at depths of 300 to 900 metres. The cost of these shallowwells is estimated to be US$700,000 per well, with the cost of surfaceproduction facilities being an estimated US$350,000 per well. Completionequipment for these and additional shallow wells are on schedule for delivery bythe end of June. Temporary production facilities and accommodation are underconstruction and will be available to be on site by July. Several other shallow drilling locations have been identified and are currentlybeing prioritised with a total of 10 wells to be drilled in the shallow zonesduring 2006. The location of the wells will also be dependent on the size ofeach shallow structure, based on initial drilling results, since multiple wellsmay need to be drilled in the same shallow structures before moving on tosubsequent targets. As Max Petroleum drills these shallow targets, accumulated data regarding wellflow rates, sizes of reservoirs found and updated seismic studies will bereleased to the market on a regular basis after review by Max Petroleum'sCompetent Person. Based on progress in Max Petroleum's Shallow Drilling Programme in 2006 theCompany has the sole option to extend the contract for the shallow drilling riginto 2007. Should the programme proceed as expected, Max Petroleum aims todrill a further 25 shallow wells in 2007. New Prospects and Seismic Programme Update The 2006 seismic programme is currently in progress and includes a 2D and 3Dsurvey in Block E. The main elements of this programme are as follows: β€’ The 2D lines are expected to be completed in June 2006 and will beused to assist in identifying further leads in new areas within Block E. β€’ The 250 square kilometre 3D survey is located over an unexploredcluster of possible shallow to intermediate traps in Block E and is expected tobe completed in July 2006. β€’ It is likely that the 3D seismic programme will be extended andexpanded due to encouraging initial results. To date, the seismic processinghas shown a number of potentially interesting leads in the salt flanks that werenot drilled in Soviet times. β€’ Further evaluation of these intermediate leads (typically 1,000 to3,000 metres) is currently in progress and the Company will provide a furtherupdate on this new area of exploration as soon as the appropriate review hasbeen carried out by McDaniel & Associates. Personnel Update The Company continues to be encouraged by its ability to attract high qualitystaff in an extremely competitive labour market. By the end of July, MaxPetroleum will employ over 70 personnel in Kazakhstan, of which 12 areexpatriate staff. These numbers will continue to grow as Max Petroleum movesinto its production phase. Both Karakum Drilling LLP and Nabors Drilling,operators of the shallow and the deep drilling rigs respectively, will provide afull complement of their own staff for drilling operations, which in turn willbe supervised by Max Petroleum's senior staff. 22 June 2006 Enquiries: Max Petroleum Plc Steve Kappelle T: +44 (0)20 7355 9590 Chief Executive Officer Pelham Public Relations Charles Vivian T: +44 (0)20 7743 6672 E : Charles.vivian@pelhampr.com Alisdair Haythornthwaite T : +44 (0) 20 7743 6676 E: Alisdair.haythornthwaite@pelhampr.com W.H. Ireland Limited Paul Dudley T: +44 (0)20 7220 1666 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
7th Dec 20115:10 pmRNSNotification of Interest
5th Dec 20117:00 amRNSDrilling Update
24th Nov 20117:00 amRNSDrilling Update
21st Nov 20117:00 amRNSProduction Update
14th Nov 20117:00 amRNSInterim Results
4th Nov 20117:00 amRNSDrilling Update
2nd Nov 20117:00 amRNSDrilling Update
21st Oct 20118:08 amRNSOperational Update
11th Oct 20117:00 amRNSDrilling Update
10th Oct 20118:26 amRNSDrilling Update
6th Oct 201110:00 amRNSSupreme Court of Kazakhstan Tax Case Ruling
5th Oct 20112:30 pmRNSDrilling Update
30th Sep 201112:30 pmRNSTotal Voting Rights
30th Sep 201112:28 pmRNSHoldings in Company
29th Sep 201111:37 amRNSResults of Annual General Meeting
29th Sep 20117:00 amRNSProduction Test Results
23rd Sep 20119:12 amRNSExercise of warrants
22nd Sep 201110:32 amRNSDrilling Update
21st Sep 20117:00 amRNSHolding(s) in Company
20th Sep 20117:00 amRNSDrilling Update
19th Sep 20117:00 amRNSExercise of Options
15th Sep 20117:00 amRNSDeep Rig Mobilisation
12th Sep 20117:00 amRNSNew discovery
12th Sep 20117:00 amRNSDrilling Update
5th Sep 20117:00 amRNSDrilling Update
30th Aug 20117:00 amRNSDrilling Update
24th Aug 20117:01 amRNS2011 Annual Report & Accounts and Notice of AGM
24th Aug 20117:00 amRNSOperational Update
15th Aug 20117:00 amRNSDrilling Update
8th Aug 20117:00 amRNSSuccessful Uytas Confirmation Well
8th Aug 20117:00 amRNSNew Oil Discovery
20th Jul 20117:09 amRNSProduction Update
18th Jul 20117:00 amRNSOperational Update
18th Jul 20117:00 amRNSSenior Vice President of Engineering Appointment
12th Jul 20118:52 amRNSOperational Update
11th Jul 20117:00 amRNSProduction Test Results
4th Jul 20117:00 amRNSOperational Update
13th Jun 20117:00 amRNSDrilling Update
6th Jun 20117:00 amRNSOperational Update
23rd May 20117:00 amRNSDrilling Update
16th May 20117:00 amRNSDrilling Update
12th May 20117:00 amRNSDrilling Update
28th Apr 201111:27 amRNSTotal Voting Rights
28th Apr 20117:00 amRNSCourt of Cassation Tax Case Ruling
26th Apr 20117:48 amRNSExecution of Drilling Contract
26th Apr 20117:00 amRNSDrilling Update
12th Apr 20117:00 amRNSExercise of Options
11th Apr 20117:00 amRNSChanges to Advisory Committee
8th Apr 20117:00 amRNSExercise of Warrants
1st Apr 20117:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.