Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operations Update

20 Apr 2006 09:00

Max Petroleum PLC20 April 2006 MAX PETROLEUM PLC (AIM:MXP) OPERATIONS UPDATE Max Petroleum Plc ("Max Petroleum" or "the Company"), an oil and gas explorationand development company with an initial focus on Kazakhstan, today announces theconclusions of a review of a drilling proposal prepared for Max Petroleum byMcDaniel & Associates, an independent reservoir evaluation consultancy, and thesigning of a rig contract in Kazakhstan. McDaniel & Associates Review McDaniel & Associates reviewed a drilling proposal prepared by Max Petroleum'stechnical staff for East Alibek, one of Max Petroleum's four assets in WesternKazakhstan. The objective of this review was to confirm that the proposedlocation of an exploration well on the East Alibek Licence was in an optimumlocation based on the available data and to comment on the reasonableness of therange of crude oil volumes estimated by Max Petroleum to be potentiallyrecoverable from the Licence. The mean oil in place is estimated by Max Petroleum to be 17.5 million barrels(MMbbls) risked and 67.4 MMbbls unrisked. The Max Petroleum report follows theacquisition of 11 new 2D seismic lines over a portion of the East Alibek Licenceand preparation of a new structural interpretation of the Carboniferous KT-1 andKT-2 zones in the Licence. In addition, a detailed log interpretation of theexisting G-4 exploration well was prepared. The full range of volumes estimatedby the Company can be found in the Appendix below. A summary of the conclusions of the McDaniel & Associates review are as follows: 1. There is sufficient data available to justify the drilling of anexploration well at this time and the proposed location appears to be in theoptimum location of the field. 2. McDaniel & Associates conducted a Monte Carlo analysis of thepotentially recoverable crude oil volumes and estimated a risked meanrecoverable volume of 11.2 MMbbls, well within the range of recoverable volumes. 3. The potentially recoverable crude oil volumes have a high degree ofuncertainty which is very typical of most exploration wells. Rig Contract Signed The Company has signed a rig contract for three firm wells with Nabors DrillingInternational Ltd, using Rig 40, a 2000 hp rig equipped with a 1200 hp top drivecapable of drilling to depths in excess of 5500 metres. The rig is expected tocommence operations on the East Alibek licence area during the fourth quarter of2006, following the completion of its current firm contractual obligations.Subsequent to the drilling of the East Alibek-1 well, the Company expects tomove the rig to a location in Blocks A&E, targeting the first prospective deepstructure in that acreage during the Spring of 2007. The Company then expectsto move the rig on to the first deep well in the Astrakhanskiy Block. Enquiries: Max Petroleum PLC Steve Kappelle T: +44 (0)20 7355 9590 Chief Executive Officer Pelham Public Relations Charles Vivian T: +44 (0)20 7743 6672 E : Charles.vivian@pelhampr.com Alisdair Haythornthwaite T : +44 (0) 20 7743 6676 E: Alisdair.haythornthwaite@pelhampr.com APPENDIX The Max Petroleum report estimated the following range of potentiallyrecoverable crude oil volumes based on a Monte Carlo probabilistic analysis asfollows: Source Unrisked Unrisked Unrisked Unrisked Risked Mean P90 P50 P10 MeanKT-1 Zone Original Oil In Place, 5.0 78.4 283.3MMbbls Recoverable Oil, MMbbls 0.8 14.1 48.4 20.2 5.2 KT-2 Zone Original Oil In Place, 11.2 169.7 477.5MMbbls Recoverable Oil, MMbbls 2.3 35.7 108.3 47.2 12.2 Total KT-1 and KT-2 Zones Original Oil In Place, 16.2 248.1 760.8MMbbls Recoverable Oil, MMbbls 3.1 49.8 156.7 67.4 17.5 The geological chance of success was estimated by Max Petroleum to be 26percent. Information in this announcement relating to the potentially recoverable crudevolumes is based on data compiled by McDaniel & Associates, who are independentconsultants to the Company. McDaniel & Associates have sufficient experiencewhich is relevant to the activity they have undertaken that has been conductedaccording to SPE standards and consent to the inclusion of the data in the formand context in which it appears in this announcement. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
25th Sep 20131:35 pmRNSResult of AGM
25th Sep 20137:00 amRNSDrilling Report
24th Sep 20132:57 pmRNSNotification re UK Takeover Code
17th Sep 20137:00 amRNSDrilling Report
16th Sep 20133:52 pmRNSHolding(s) in Company
12th Sep 20136:20 pmRNSHolding(s) in Company
12th Sep 20134:22 pmRNSHolding(s) in Company
12th Sep 201312:40 pmRNSSuccessful well result at Uytas
11th Sep 20137:00 amRNSHolding(s) in Company
10th Sep 20138:50 amRNSHolding(s) in Company
9th Sep 20137:00 amRNSDrilling Report
6th Sep 20134:19 pmRNSHolding(s) in Company
5th Sep 20135:23 pmRNSHolding(s) in Company
3rd Sep 20137:00 amRNSConversion of Bonds
2nd Sep 20139:00 amRNSDrilling Update
30th Aug 20137:00 amRNSFinal conversion of convertible bonds
29th Aug 201310:32 amRNSSpudding of UTS-13 appraisal well in Uytas Field
27th Aug 20137:00 amRNSDrilling Update
22nd Aug 20137:00 amRNSAnnual Report and Accounts and Notice of AGM
15th Aug 20137:00 amRNSOperational Update
14th Aug 20137:00 amRNSUpdate on NUR-1 Pre-salt Well
13th Aug 20132:35 pmRNSSpudding of SAGW-5 appraisal well
8th Aug 20137:00 amRNSDrilling Update
23rd Jul 20137:00 amRNSSuccessful appraisal well at Uytas
18th Jul 20137:00 amRNSHolding(s) in Company
18th Jul 20137:00 amRNSBorkyldakty Field Placed on Full Field Development
16th Jul 20137:00 amRNSDrilling Update
15th Jul 20137:00 amRNSOperational Update
9th Jul 20139:23 amRNSSpudding of ZMA-A21
8th Jul 20137:00 amRNSDrilling Update
4th Jul 20137:00 amRNSSuccessful Development Well in Zhana Makat
25th Jun 20132:29 pmRNSDrilling Update
24th Jun 20137:00 amRNSDrilling Update
21st Jun 20133:26 pmRNSHolding(s) in Company
19th Jun 20139:47 amRNSDrilling Update
18th Jun 20137:00 amRNSDrilling Update
10th Jun 20137:00 amRNSDrilling Update
3rd Jun 20137:00 amRNSDrilling Update
30th May 20137:30 amRNSDrilling Update
24th May 20139:15 amRNSDrilling Update
22nd May 20137:00 amRNSDrilling Update
20th May 20133:25 pmRNSHolding(s) in Company
16th May 20137:00 amRNSDrilling Update
15th May 20137:00 amRNSRegulatory Update
7th May 20137:00 amRNSDrilling Update
1st May 20137:00 amRNSOperational Update
23rd Apr 20136:00 pmRNSHolding(s) in Company
22nd Apr 20137:00 amRNSDrilling Update
18th Apr 20139:11 amRNSHolding(s) in Company
18th Apr 20137:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.