Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operational Update

6 Jan 2011 07:00

RNS Number : 9916Y
Max Petroleum PLC
06 January 2011
 



Max Petroleum Plc

(the "Company")

 

Operational Update

 

6 January 2011

 

Max Petroleum Plc, an oil and gas exploration and development company focused on Kazakhstan, is pleased to announce an operational update of its activities in the Blocks A&E Licence area.

 

Confirmation of Uytas Oil Discovery

Initial test results from the Cretaceous reservoir in the UTS-1 discovery well indicate a 55 metre oil column with 31 metres of net oil pay. Perforations at depths ranging from 120 to 128 metres and 155 to 158 metres produced 26 degree API gravity crude oil on pump at indicative rates of approximately 24 barrels of oil per day during a brief clean-up period. The duration of the test was limited due to government regulations and the well will be placed on a 90-day long term production test after all necessary government approvals are obtained in the next few weeks.

Based on a probable oil/water contact at 161 metres as indicated by revised petrophysical analysis and current mapping, the potential oil in place for the Cretaceous reservoir is estimated to be between 85 and 135 million barrels of oil. While other Cretaceous fields in the Pre-Caspian Basin from similar depths report recovery factors between 20% to 30% of original oil in place, long-term testing and pressure analysis of the discovery well, combined with confirmation drilling and a new seismic survey specifically focused on these shallow reservoirs will be needed to more accurately define recoverable oil reserves. Enhanced recovery techniques, such as water flooding, may also be needed to improve recovery from such shallow depths with low reservoir pressure.

 

Additional intervals in the Triassic and Jurassic are currently being tested. A full update will be made as soon as the testing is complete, which is expected in the next several weeks. The Company plans to drill three confirmation wells in the first quarter of 2011 and has tendered for a ZJ-20 shallow rig to drill the wells. The Company also intends to acquire a high-fold 3D seismic survey over the Uytas structure specifically designed to image the shallow reservoirs in the field as soon as practicable.

 

TPP Extension for the Zhana Makat Field

 

Government approval has been received to extend the trial production project ("TPP") for the Zhana Makat Field for six months to 1 July, 2011. The TPP extension allows the Company to drill two additional Triassic wells in the field, which the Company intends to drill in the first quarter of 2011. The Company has filed an application to convert Zhana Makat to full field development status, which will allow the Company to develop and produce the field for up to 25 years under the terms of the Blocks A&E Licence.

 

Drilling

 

 

The ZJ-30 drilling rig is expected to spud the ALTW-1 exploration well on the West Altykol prospect and the ZJ-40 rig is expected to spud the ASK-1 well on the Asanketken prospect before 1 February 2011, after additional drilling equipment required to drill the wells is received on location. West Altykol is a Triassic prospect with a 4-way closure and Asanketken is a high potential, salt flank Triassic prospect.

 

 

Enquiries:

 

Max Petroleum Plc

 

 

Michael Young

President and Chief Financial Officer

Tel: +44 (0)20 7355 9590

 

Peter Moss

Vice President

Corporate Development and Investor Relations

 

Merlin PR

 

Tom Randell / Anca Spiridon

Tel: +44 (0)207 726 8400

WH Ireland Ltd

 

Daniel Bate

Tel: +44 (0)161 832 2174

 

Macquarie Capital Advisers

Paul Connolly / Ben Oakley

Tel: +44 (0)203 037 2000

 

Richard Hook, Chief Operating Officer of Max Petroleum, is the qualified person that has reviewed and approved the technical information contained in this announcement. Mr. Hook is a member of the Houston Geological Society and holds both Masters and Bachelors of Science degrees in geology.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBELLBFFFLBBQ
Date   Source Headline
24th Jul 20147:00 amRNSForm 8.5 (EPT/RI)
22nd Jul 20144:54 pmRNSStrategic Review and Formal Sale Process
17th Jul 20147:00 amRNSChange of Registered Office
7th Jul 201411:01 amRNSHolding(s) in Company
1st Jul 20147:00 amRNSCommissioning of Pipeline and Terminal
12th Jun 20147:00 amRNSReserves and Production Update
10th Jun 20147:00 amRNSDrilling Update
6th Jun 20147:00 amRNSAppointment of Nominated Adviser
27th May 20147:01 amRNSIssuance of Share Options
27th May 20147:00 amRNSDrilling Update
19th May 20147:00 amRNSCorporate Update
8th May 20147:00 amRNSDrilling Update
23rd Apr 20147:00 amRNSSuccessful appraisal well at East Kyzylzhar I
2nd Apr 20147:01 amRNSSuccessful appraisal well at Sagiz West
2nd Apr 20147:00 amRNSCorporate Update
24th Mar 20143:26 pmRNSHolding(s) in Company
11th Mar 20147:00 amRNSSuccessful appraisal well at Sagiz West
3rd Mar 20145:48 pmRNSHoldings in Company
14th Feb 20147:00 amRNSSuccessful appraisal well at Sagiz West
4th Feb 20144:35 pmRNSPrice Monitoring Extension
31st Jan 20147:00 amRNSCorporate Update
21st Jan 20145:23 pmRNSHolding(s) in Company
20th Jan 20147:00 amRNSDrilling Update
17th Jan 201411:35 amRNSHolding(s) in Company
15th Jan 20145:14 pmRNSHolding(s) in Company
14th Jan 20143:16 pmRNSHolding(s) in Company
9th Jan 20144:14 pmRNSHolding(s) in Company
7th Jan 20145:46 pmRNSHolding(s) in Company
6th Jan 20147:39 amRNSHolding(s) in Company
2nd Jan 20144:58 pmRNSHolding(s) in Company
30th Dec 20137:00 amRNSSuccessful appraisal well at Sagiz West
30th Dec 20137:00 amRNS2013 INTERIM RESULTS ANNOUNCEMENT
20th Dec 20137:00 amRNSDate of Interim Results Announcement
19th Dec 20134:35 pmRNSPrice Monitoring Extension
6th Dec 20137:00 amRNSSuccessful appraisal well at Sagiz West
5th Dec 20137:00 amRNSAppointment of Joint Corporate Broker
4th Dec 20134:34 pmRNSHolding(s) in Company
3rd Dec 20135:04 pmRNSHolding(s) in Company
29th Nov 20133:54 pmRNSHolding(s) in Company
19th Nov 20137:00 amRNSHolding(s) in Company
19th Nov 20137:00 amRNSAppraisal well results at Uytas
12th Nov 20135:42 pmRNSHolding(s) in Company
6th Nov 20137:00 amRNSOperational update
16th Oct 20137:00 amRNSDrilling Update
8th Oct 20137:00 amRNSOperational Update
4th Oct 20135:39 pmRNSHolding(s) in Company
4th Oct 20137:00 amRNSDrilling Report
1st Oct 20137:00 amRNSSuccessful well result at Sagiz West
30th Sep 20131:33 pmRNSTotal Voting Rights
25th Sep 20134:03 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.