Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operational Update

15 Aug 2013 07:00

RNS Number : 7358L
Max Petroleum PLC
15 August 2013
 



Max Petroleum Plc

(the "Company")

 

Operations Update

 

Updated Volumetrics for Sagiz West Field

Production Test Results in Sagiz West, Eskene North, and Baichonas West

 

 

15 August 2013

 

 

Max Petroleum Plc, an oil and gas exploration and production company focused on Kazakhstan, is pleased to announce an operations update for the Sagiz West, Eskene North and Baichonas West fields.

 

Sagiz West

 

The combined results of the SAGW-4 well and the latest 3D seismic survey results confirm productive reservoirs in a central fault block with estimated original oil in place ("OOIP") in a range between 35 and 48 million barrels of oil ("mmbo"). The outer flanks of the Sagiz West structure beyond this central fault block are still considered prospective, but are not included in this revised OOIP figure and will need to be tested by future drilling. Recoveries from the central fault block area are expected to be in the range of 20-30% with an expected recovery from this part of the Sagiz West Field of approximately seven to 14 mmbo. Final results of the 3D evaluation and further drilling may increase this estimate in the future. The Company expects to drill up to ten additional wells in Sagiz West through Spring 2014.

 

The SAGW-4 well in the Sagiz West Field is currently testing a Triassic reservoir from depths ranging between 1,251 and 1,257 metres, producing at a stable rate of approximately 70 barrels of oil per day ("bopd") with a 16% water cut. Although porosities in this well are reasonably good, the permeability is not as high as seen in other reservoirs in the field making this zone a good candidate for hydraulic fracturing, a stimulation technique that is used routinely in these types of reservoirs around the world. Other more permeable reservoirs found to date in the field that have produced at higher rates will not require stimulation. The Company anticipates that use of hydraulic fracturing may generate up to a fivefold increase in production at a cost of approximately US$300,000 per well. The production data from this well will be used to help evaluate and design a stimulation programme for this reservoir across the Sagiz West Field.

 

The Company has also tested the lower Triassic section in the well at depths below 1,264 metres, which produced minor amounts of water with a show of oil and the zone was abandoned. Fluid samples taken from the well at depths of 1,225 and 1,240 metres have now been analysed and are reported to contain "dry gas" as opposed to "gas condensate" as was reported in the Company's press release on 13 June 2013.

 

Eskene North

 

The ESKN-1 well in the Eskene North Field has begun testing in a Triassic reservoir from depths between 1,326 and 1,357 metres, where it has produced at rates up to 25 bopd with no water. This low production rate was expected given the low permeability in the reservoir. Data from the production test is being used to design a hydraulic fracture stimulation programme for ESKN-1, which is planned to be carried out in October 2013.

 

The Eskene North structure covers a large area and the volume of oil in place suggested by the oil column seen in ESKN-1 is currently estimated by the Company to be 21 mmbo. The Company is planning to drill a second well in Eskene North in September 2013, subject to regulatory approvals.

 

Baichonas West

 

Initial testing has now been completed at BCHW-2. Results show gas in the Middle Jurassic reservoir which produced natural gas at a rate of 71,100 m³ per day over the interval from vertical depths of 1,106 to 1,116 metres. The well also had significant oil and gas shows in the lower Jurassic and Triassic over a 170 metre interval that were not present in the first well in the field, BCHW-1. Several zones in this section were tested between vertical depths of 1,187 and 1,393 metres, all of which were found to be of low permeability and produced oil and water at non-commercial rates. A third well is planned in September 2013 which will test possible improvement in the quality of Triassic reservoirs as well as delineate the extent of the productive Jurassic accumulation. The Triassic reservoirs will be studied to determine suitability for hydraulic fracture stimulation.

 

 

Enquiries:

 

Max Petroleum Plc

 

 

Michael Young

President and Chief Financial Officer

Tel: +44 (0)207 355 9590

 

Tom Randell

Director of Investor Relations

 

College Hill

 

David Simonson/ Anca Spiridon

Tel: +44 (0)207 457 2020

WH Ireland Ltd

 

Daniel Bate / Katy Mitchell

Tel: +44 (0)161 832 2174

 

Macquarie Capital

Steve Baldwin / Nicholas Harland

 

Tel: +44 (0)203 037 2000

Oriel Securities

Michael Shaw / Ashton Clanfield

Tel: +44 (0)207 710 7600

 

 

 

Richard Hook, Chief Operating Officer of Max Petroleum Plc, is the qualified person that has reviewed and approved the technical information contained in this announcement. Mr. Hook is a member of the Houston Geological Society and holds both Masters and Bachelors of Science degrees in geology.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBZLLFXVFBBBD
Date   Source Headline
31st Mar 201111:53 amRNSTotal Voting Rights
24th Mar 20117:00 amRNSDrilling Update
14th Mar 20117:00 amRNSIssuance of Additional Options
11th Mar 20114:27 pmRNSHolding(s) in Company
11th Mar 20117:00 amRNSExercise of warrants
10th Mar 20117:00 amRNSExercise of Warrants
8th Mar 20114:02 pmRNSHolding(s) in Company
7th Mar 20113:08 pmRNSHolding(s) in Company
4th Mar 20113:00 pmRNSExercise of Warrants
3rd Mar 201112:58 pmRNSHolding(s) in Company
1st Mar 201111:46 amRNSResult of General Meeting and Bondholder Meeting
28th Feb 201110:52 amRNSTotal Voting Rights
17th Feb 20117:00 amRNSDrilling Update
16th Feb 20113:37 pmRNSHolding(s) in Company
16th Feb 20117:00 amRNSDrilling Update
14th Feb 20119:52 amRNSHolding(s) in Company
11th Feb 201110:45 amRNSExercise of Warrants
4th Feb 201111:31 amRNSExercise of warrants
4th Feb 20117:00 amRNSResult of placing
2nd Feb 20117:00 amRNSProposed Cash Placing
31st Jan 20117:00 amRNSOperational Update
6th Jan 20117:00 amRNSOperational Update
17th Dec 20107:00 amRNS2010 Interim Results Announcement
15th Dec 20107:00 amRNSExtension of Blocks A&E Licence Exploration Period
9th Dec 201012:35 pmRNSDrilling Update
2nd Dec 20107:00 amRNSDrilling and Operational Update
30th Nov 20101:43 pmRNSTotal Voting Rights
15th Nov 20103:31 pmRNSExercise of Warrants
29th Oct 201011:40 amRNSTotal Voting Rights
28th Oct 20107:00 amRNSDrilling Update
27th Oct 20103:01 pmRNSExercise of Warrants
19th Oct 201010:00 amRNSDrilling Update
15th Oct 20107:30 amRNSDrilling Update
11th Oct 20105:01 pmRNSHolding(s) in Company
27th Sep 201011:30 amRNSResult of AGM
27th Sep 20107:00 amRNSExecution of Drilling Contract
24th Sep 201010:52 amRNSResults of Bondholder Meeting
24th Sep 20107:00 amRNSSupreme Court Ruling on Tax Claim
20th Sep 20107:00 amRNSOperational Update
15th Sep 20105:05 pmRNSHolding(s) in Company
7th Sep 20107:00 amRNSBond interest deferral and issue of warrants
31st Aug 20107:00 amRNSExtension of Blocks A&E Licence Exploration Period
26th Aug 20107:00 amRNSAnnual Report and Accounts and Notice of AGM
25th Aug 201010:01 amRNSDrilling Update
9th Aug 20107:00 amRNSDrilling Update
19th Jul 20107:00 amRNSAstrakhanskiy Licence Status
15th Jul 20102:33 pmRNSDrilling Update
12th Jul 20107:00 amRNSResource Estimates of Exploration Potential
5th Jul 20109:46 amRNSExtension of Tax Claim Payment
30th Jun 201010:32 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.