Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operational Update

31 Jan 2011 07:00

RNS Number : 3182A
Max Petroleum PLC
31 January 2011
 



Max Petroleum Plc

(the "Company")

 

Operational Update

 

31 January 2011

 

 

Max Petroleum Plc, an oil and gas exploration and development company focused on Kazakhstan, is pleased to announce an operational update of its activities on the Blocks A&E Licence area.

 

The Company has completed initial testing of the UTS-1 well in the Uytas Field, successfully producing 27 degree API oil at an indicative rate of approximately 40 barrels per day from perforations in a Jurassic reservoir from depths of 373 to 377 metres during a brief clean-up period. The duration of the test was limited due to government regulations and the well will be placed on a 90-day production test after all necessary government approvals are obtained in the next few weeks. Current mapping indicates that the UTS-1 well is approximately 20 metres below the crest of the structural closure creating the reasonable possibility that additional Jurassic reservoirs will be productive elsewhere in the field. The Jurassic reservoirs in the well are of excellent quality, with porosity averaging 29%. A section in the Triassic Formation was also tested and found to be non-productive.

 

As previously announced, initial test results from the Cretaceous reservoir in the UTS-1 discovery well indicated a 55 metre oil column with 31 metres of net oil pay. Perforations at depths ranging from 120 to 128 metres and 155 to 158 metres produced 26 degree API gravity crude oil on pump at indicative rates of approximately 24 barrels of oil per day during a brief clean-up period. Based on a probable oil/water contact at 161 metres as indicated by revised petrophysical analysis and current mapping, the potential oil in place for the Cretaceous reservoir is estimated between 85 and 135 million barrels of oil.

The Company plans to drill three confirmation wells at Uytas over the next several months and has tendered for a shallow rig to drill the wells. These additional wells will give a clearer picture of potential reserves in both the Cretaceous and Jurassic formations. The Company also intends to acquire a high-fold 3D seismic survey over the Uytas structure specifically designed to image the shallow reservoirs in the field as soon as practicable.

 

The Company has also commenced drilling the ALTW-1 exploration well on the West Altykol prospect in Block E, the eighth of 15 post-salt exploration prospects scheduled to be drilled by the Company on Blocks A&E. The total depth of the well will be approximately 1,800 metres, targeting potential reservoirs in the Triassic.

 

Robert B Holland III, Executive Co-Chairmen said:

 

"We are pleased with the results of the Jurassic test and anticipate even better results when we drill further updip on the structure. We believe this test, combined with the large volume of oil in place in the Cretaceous, confirms Uytas as a significant post-salt discovery."

 

Enquiries:

 

Max Petroleum Plc

 

 

Michael Young

President and Chief Financial Officer

Tel: +44 (0)20 7355 9590

 

Peter Moss

Vice President

Corporate Development and Investor Relations

 

Merlin PR

 

Tom Randell / Anca Spiridon

Tel: +44 (0) 7887 884 794

WH Ireland Ltd

 

Daniel Bate

Tel: +44 (0)161 832 2174

 

Macquarie Capital Advisers

Paul Connolly / Ben Oakley

Tel: +44 (0)203 037 2000

 

Richard Hook, Chief Operating Officer of Max Petroleum, is the qualified person that has reviewed and approved the technical information contained in this announcement. Mr. Hook is a member of the Houston Geological Society and holds both Masters and Bachelors of Science degrees in geology.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLBLLXFFFXBBK
Date   Source Headline
25th Sep 20131:35 pmRNSResult of AGM
25th Sep 20137:00 amRNSDrilling Report
24th Sep 20132:57 pmRNSNotification re UK Takeover Code
17th Sep 20137:00 amRNSDrilling Report
16th Sep 20133:52 pmRNSHolding(s) in Company
12th Sep 20136:20 pmRNSHolding(s) in Company
12th Sep 20134:22 pmRNSHolding(s) in Company
12th Sep 201312:40 pmRNSSuccessful well result at Uytas
11th Sep 20137:00 amRNSHolding(s) in Company
10th Sep 20138:50 amRNSHolding(s) in Company
9th Sep 20137:00 amRNSDrilling Report
6th Sep 20134:19 pmRNSHolding(s) in Company
5th Sep 20135:23 pmRNSHolding(s) in Company
3rd Sep 20137:00 amRNSConversion of Bonds
2nd Sep 20139:00 amRNSDrilling Update
30th Aug 20137:00 amRNSFinal conversion of convertible bonds
29th Aug 201310:32 amRNSSpudding of UTS-13 appraisal well in Uytas Field
27th Aug 20137:00 amRNSDrilling Update
22nd Aug 20137:00 amRNSAnnual Report and Accounts and Notice of AGM
15th Aug 20137:00 amRNSOperational Update
14th Aug 20137:00 amRNSUpdate on NUR-1 Pre-salt Well
13th Aug 20132:35 pmRNSSpudding of SAGW-5 appraisal well
8th Aug 20137:00 amRNSDrilling Update
23rd Jul 20137:00 amRNSSuccessful appraisal well at Uytas
18th Jul 20137:00 amRNSHolding(s) in Company
18th Jul 20137:00 amRNSBorkyldakty Field Placed on Full Field Development
16th Jul 20137:00 amRNSDrilling Update
15th Jul 20137:00 amRNSOperational Update
9th Jul 20139:23 amRNSSpudding of ZMA-A21
8th Jul 20137:00 amRNSDrilling Update
4th Jul 20137:00 amRNSSuccessful Development Well in Zhana Makat
25th Jun 20132:29 pmRNSDrilling Update
24th Jun 20137:00 amRNSDrilling Update
21st Jun 20133:26 pmRNSHolding(s) in Company
19th Jun 20139:47 amRNSDrilling Update
18th Jun 20137:00 amRNSDrilling Update
10th Jun 20137:00 amRNSDrilling Update
3rd Jun 20137:00 amRNSDrilling Update
30th May 20137:30 amRNSDrilling Update
24th May 20139:15 amRNSDrilling Update
22nd May 20137:00 amRNSDrilling Update
20th May 20133:25 pmRNSHolding(s) in Company
16th May 20137:00 amRNSDrilling Update
15th May 20137:00 amRNSRegulatory Update
7th May 20137:00 amRNSDrilling Update
1st May 20137:00 amRNSOperational Update
23rd Apr 20136:00 pmRNSHolding(s) in Company
22nd Apr 20137:00 amRNSDrilling Update
18th Apr 20139:11 amRNSHolding(s) in Company
18th Apr 20137:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.