Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kalahari Metals Limited Exploration Update

7 Mar 2019 07:18

7 March 2019

Metal Tiger plc

(“Metal Tiger” or the “Company”)

Kalahari Metals Limited – Exploration Update

Metal Tiger plc (AIM:MTR), the London Stock Exchange AIM listed investor in strategic natural resource opportunities, is pleased to provide an update regarding Kalahari Metals Limited (“KML”) and the results from KML’s recently completed soil sampling programme together with KML’s re-interpretation of historical data, including magnetic, airborne electromagnetic (AEM) and drill data, over KML’s Kitlanya joint venture licence holding.

The results indicate compelling new targets for follow-up in both Kitlanya West (“KIT-W”) and Kitlanya East (“KIT-E”) (together the “Kitlanya Project”), as well as expanding on drill targets identified in KML’s Ngami Copper Project (“NCP”).

The Company is pleased to confirm that the recent work completed on the Kitlanya Project satisfies the first earn-in option for KML to acquire 25% of the Kitlanya Project from Resource Exploration and Development Limited (“RED”), as detailed in the Company’s announcement of 30 November 2018.

Highlights:

Re-interpretation of magnetic data in KIT-E introduces two new target areas as anticlinal structures rather than historically interpreted synclines. This is supported by historical soil sampling and drill data, effectively placing the prospective mineralised contact in a fold hinge setting at relatively shallow depths under thin cover. The northernmost target is situated 5km south of MOD Resources Limited’s (“MOD”) T3 deposit. KML has recently completed 3,410 soil samples over KIT-E, which have returned anomalous lead and zinc domains with low concentration copper anomalies associated with the northernmost fold-hinge target. Results provide support for potential mineralisation in the fold structure. Re-processing and inversion of historical AEM data over KIT-W has potentially identified three folded conductive ‘dome’ structures situated in the correct stratigraphy to host copper-silver mineralisation. These targets are considered excellent candidates for drill testing. Re-analysis of a selection of historical soil samples from NCP, using low concentration partial digest TerraleachTM geochemistry, has identified a distinct zoned copper-lead-zinc anomaly associated with a priority fold-closure target from recent AEM interpretation.

Michael McNeilly, Chief Executive Officer of Metal Tiger plc, commented:

“The results from recently completed soil sampling and re-interpretation of historical data over the Kitlanya Project has provided compelling targets for drill testing.

We are actively reviewing KML’s proposed diamond and reverse circulation drilling targets as they relate to this additional interpretation and hope to be able to drill targets at NCP in the near future as well as define drill targets at Kitlanya West and Kitlanya East. We look forward to keeping shareholders updated in this regard.”

We recommend that readers also refer to the version of this news release on the Metal Tiger website which includes informative images showing the geophysical interpretations.

KIT-E

KIT-E is notable for its thin Kalahari Group cover and proximity to a number of known deposits (including MOD’s T3 deposit) and copper-silver occurrences. Re-interpretation of magnetic data has highlighted five prospective areas for follow-up. Of particular interest are target areas (1) and (3) which have been interpreted as anticlinal structures as opposed to synclines in historical work. These targets could therefore present a priority setting for mineralisation hosted in hinge-zones.

A distinct copper anomaly is associated with the northern target (1) in historical TerraleachTM sample datasets. Historical drilling into this target appears to have intersected and stopped in the D’Kar Formation with distinct evidence for outward younging direction (carbonate/siltstone dominated fold centre grading to sandstone dominated limbs) with pyrite and occasional chalcopyrite noted in the central part of the fold target. These results provide significant support for the magnetic interpretation with the lower D’Kar Formation (or Ngwako Pan Formation) expected in the fold-hinge rather than on the limbs as previously assumed.

A total of 3,410 soil samples were recently collected along traverses over priority areas. Samples were screened to -180µm and analysed using portable XRF. In addition, Airborne Electromagnetic (“AEM”) traverses were flown using New Resolutions Geophysics’s XCiteTM system along selected traverses to test the effectiveness of AEM in the current environment.

Despite relatively low absolute concentrations, soil sample results delineate a zone of anomalous zinc over the northern target (1), in addition to a more discrete zinc and copper anomaly in the central part of target (3). The generally low soil sample metal concentrations are more reflective of targets where the mineralised D’Kar-Ngwako Formation contact is not exposed to the Kalahari palaeotopography with the exploration focus thus in fold hinges with thin D’Kar Formation covering the contact. Drill chips from a recent water borehole indicate the lower D’Kar Formation in central part of the northern target (1) further supporting the magnetic interpretation. AEM orientation traverses clearly map the thin Kalahari Group conductive cover as well as distinct lithological boundaries and conductors supporting the application of the method.

The Metal Tiger Board believes that the current phase of work over KIT-E has added significant value in upgrading target areas for follow-up and that the thin Kalahari Group cover and proximity to MOD’s T3 deposit, provide further support for focussed follow-up exploration on these licences.

KIT-W

The KIT-W project is situated adjacent to KML’s NCP project and has similar potential for both ‘dome’ related and anticline limb mineralisation along D’Kar-Ngwako Pan Formation contacts. Importantly the project is located in proximity to the basin margin with basement subcropping in the northwestern part of the licence. Re-interpretation of government magnetic data favours the existence of Kgwebe basement volcanics in the core of anticlines and along the basement margin. Presence of Kgwebe Formation is often considered important for area prioritisation in the Kalahari Copperbelt.

Historical 400 metre line spaced GeoTEM fixed-wing AEM data was collected over the eastern half of the KIT-W project in the mid-1990s. The data has been re-processed and run through a layered earth routine to highlight structure and targets. Three discrete conductive ‘dome’ targets have been delineated. Importantly, these are situated in interpreted fold closures and hinge zones based on magnetic data. Given the favourable regional setting, proximity to drill tested copper-silver mineralisation on the NCP project and compelling AEM signature, these targets are considered ready for stratigraphic drill testing.

NCP

A total of 1,432 historical soil samples were sent for re-assay, using low-concentration partial digest TerraleachTM analysis, as part of an orientation exercise. The objective of the study was to determine if partial leach techniques could offer an improvement on conventional geochemistry in areas with thicker Kalahari Group cover. Results from the study produced excellent results with discrete copper anomalies associated with drill tested mineralisation and a broader lead-zinc halo in overlying D’Kar Formation. Importantly, sample coverage included one of the priority anticline hinge targets identified in the recently completed AEM data. In this area distinct copper anomalies are apparent with a more dispersed lead-zinc anomaly along fold plunge. The results support conceptual models for this target, thereby providing further motivation for drill testing.

Project Background

KML holds interests in 12 highly prospective exploration licences covering a total area of 8,724km2 in the Kalahari Copper Belt, consisting of two 100% owned exploration licences (consisting of NCP and the Okavango Copper Project), five exploration licences subject to a binding earn-in agreement (“Agreement”) with Triprop Holdings (Pty) Limited and five exploration licences subject to the agreement with Resource Exploration and Development Ltd.

Under an investment agreement announced on 6 June 2018, Metal Tiger currently has a 34% interest in KML and has the right to acquire up to 50% of KML for a further consideration of US$0.5 million, providing Metal Tiger with further exposure to a largely unexplored area, adjacent to significant recent discoveries in the highly prospective Kalahari Copper Belt.

Competent Person's Statement

The technical information contained in this disclosure has been read and approved by Mr Nick O’Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O’Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

For further information on the Company, visit: www.metaltigerplc.com:

Michael McNeilly Metal Tiger - Chief Executive Officer Tel: +44 (0)20 7099 0738
Mark Potter Metal Tiger - Chief Investment Officer
Richard Tulloch

James Dance

Jack Botros

Strand Hanson Limited (Nominated Adviser) Tel +44 (0)20 7409 3494
Nick Emerson SI Capital (Broker) Tel: +44 (0)1483 413 500
Gordon Poole

James Crothers

Monique Perks

Camarco (Financial PR) Tel: +44 (0)20 3757 4980

Notes to Editors:

Metal Tiger plc is listed on the London Stock Exchange AIM Market (“AIM”) with the trading code MTR and invests in high potential mineral projects with a base, precious and strategic metals focus.

The Company’s target is to deliver a high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector. The Company’s key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals. Metal Tiger has two investment divisions: Direct Equities and Direct Projects.

The Direct Equities division invests in undervalued natural resource companies listed on AIM, the ASX and the TSX. Through the trading of equities and warrants, Metal Tiger seeks to generate cash for investment in the Direct Projects division.

Metal Tiger’s Direct Projects division is focused on the development of its key project interests in Botswana, Spain and Thailand. In Botswana, Metal Tiger, through its 10.5% interest in MOD Resources Limited and related JV, has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain, the Company has tungsten and gold interests in the highly mineralised Extremadura region. In Thailand, Metal Tiger has interests in two potentially near-production stage lead/zinc/silver mines as well as licences, applications and critical historical data covering antimony, copper, gold, lead, zinc and silver opportunities.

The Company actively assesses new investment opportunities on an on-going basis and has access to a diverse pipeline of new opportunities in the natural resources and mining sectors. For pipeline opportunities deemed sufficiently attractive, Metal Tiger may invest in the project or entity by buying publicly listed shares, by financing privately and/or by entering into a joint venture.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190306005906/en/

Copyright Business Wire 2019

Date   Source Headline
10th Nov 20169:30 amBUSMemorandum of Understanding - Metal Tiger Australia and Greatland Gold
8th Nov 20162:36 pmBUSIssue of Equity for Services
8th Nov 20169:19 amBUSFormer Director Option Conversion
1st Nov 201610:15 amBUSGeneral Meeting Update and Statement
1st Nov 20169:00 amBUSQuarterly Activities Report
28th Oct 201610:08 amBUSBotswana - Encouraging Extension and Infill Drilling Results
26th Oct 20167:00 amBUSWarrant Exercise
20th Oct 20161:30 pmBUSTR-1: Notification of major interest in shares
19th Oct 20169:47 amBUSWarrant Exercise - Replacement
19th Oct 20169:05 amBUSWarrant Exercise
17th Oct 20167:14 amBUSDirector Share Purchase
13th Oct 20169:27 amBUSPosting of Circular
13th Oct 20169:22 amBUSWarrant Exercise
10th Oct 20168:39 amBUSBotswana - Extension Drilling Underway for Low Cost T3 Discovery
10th Oct 20167:00 amBUSStrategic Update and Board Restructuring
5th Oct 20167:00 amBUSAppointment of Financial Adviser and Broker to Secure Project Level Financing - Thailand
4th Oct 20168:31 amBUSBotswana - T3 Deposit, Excellent Metallurgical Results
30th Sep 20164:28 pmBUSWarrant Exercise - Replacement
30th Sep 20163:48 pmBUSWarrant Exercise
30th Sep 20167:00 amBUS2016 Interim Report
27th Sep 20164:13 pmBUSTR-1: Notification of major interest in shares
26th Sep 20167:07 amBUSBotswana - T3, Substantial Maiden JORC Compliant Mineral Resource
23rd Sep 20168:47 amBUSThailand Permitting Progress Update
22nd Sep 20164:32 pmRNSUpdated Spanish Presentation and Investor Evening
22nd Sep 20169:35 amBUSBotswana T3 Resource Generation Update
22nd Sep 20167:00 amBUSAdditional Investment - Greatland Gold
19th Sep 20163:58 pmBUSBotswana - On Track for T3 Maiden Resource
12th Sep 20167:00 amBUSMemorandum of Understanding Signed with Saudi Group
7th Sep 20162:18 pmRNSHolding(s) in Company
7th Sep 20168:03 amBUSBotswana - Further Positive Results from T3 Resource Drilling
6th Sep 20163:57 pmBUSAdditional Investment in Red Rock Resources
1st Sep 20167:00 amBUSAdditional Strategic Investment - Thor Mining
31st Aug 20169:28 amRNSGold Production Opportunity - update
30th Aug 20168:09 amBUSBotswana T2 West: First RC Drill Assays
26th Aug 20169:30 amRNSCommunications Update
26th Aug 20167:00 amBUSNotice of Interim Results and Capital Reduction
25th Aug 20163:51 pmBUSShares Issued in respect of Thailand Joint Venture Agreement
25th Aug 20168:11 amBUSSpanish Update: New Licence Application Over Gold Target
24th Aug 20167:00 amBUSAdditional Strategic Investment in Red Rock Resources
23rd Aug 201612:26 pmBUSThailand - Commercial Mines Joint Venture Agreement Signed
23rd Aug 20168:16 amBUSBotswana T2 West RC Drilling Intersects Wide Copper Intervals
22nd Aug 20165:18 pmBUSUnaudited Current Asset Update
22nd Aug 20168:35 amBUSBotswana - Resource Drilling Nearing Completion at T3
22nd Aug 20168:35 amBUSWarrant Exercise
19th Aug 20164:45 pmBUSAward of Management Options - Replacement
19th Aug 20163:40 pmBUSAward of Management Options
19th Aug 20162:00 pmBUSAppointment of Chief Technical Officer
18th Aug 201610:00 amRNSTHAILAND UPDATE - MERIT CEREMONY
18th Aug 20168:34 amBUSSpanish Exploration Update: New Gold Anomaly
17th Aug 201610:39 amBUSStrategic Financing Update - £1.1 million raised

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.