SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTR.L Regulatory News (MTR)

  • There is currently no data for MTR

Botswana Copper-Silver Project Update

2 Mar 2016 08:13

RNS Number : 7463Q
Metal Tiger PLC
02 March 2016
 

Metal Tiger Plc

02 March 2016

Metal Tiger Plc

("Metal Tiger" or the "Company")

 

 

BOTSWANA COPPER-SILVER PROJECT UPDATE

 

Metal Tiger plc (LON:MTR) the London Stock Exchange AIM listed investor in strategic natural resource opportunities is pleased to announce an update in respect of the Company's Joint Venture ("JV") with MOD Resources (ASX:MOD) ("MOD") in the Kalahari Copper Belt.

 

Highlights:

 

· Significant widths of visible, disseminated Cu mineralisation intersected in first five reverse circulation ("RC") drill holes completed at Tshimologo Prospect (Target 'T4'), 25km north of Ghanzi Town.

 

· Tshimologo occurs along the same regional structure that hosts MOD's high grade Mahumo Cu/Ag deposit and Cupric Canyon Capital's >2Mt Cu Zone 5 deposit.

 

· The widest mineralised interval extends approximately 42m down hole, from 65m to 107m depth in hole MO-A-04R, within an interpreted shear zone.

 

· Tshimologo is structurally complex and further drilling is required to estimate true widths of the recent intersections. Cu grades will be reported when assays are received.

 

· Cu occurs in two distinct zones: Mahumo type sediment hosted contact mineralisation and shear related mineralisation associated with quartz veining.

 

· The only outcrop is a 30m to 40m wide area of quartz veining and early prospector pits within the shear zone. Samples of quartz veins have been sent for precious metal assay.

 

· Drilling is expected to resume at Tshimologo once initial assays are received. In the meantime drilling will test two separate targets at T2, 6km east of the Mahumo deposit.

 

· Recent soil sampling has also confirmed a Cu anomaly at T3 in the centre of the Mahumo Structural Corridor, ~70km NE of Tshimologo. Soil sampling is ongoing in several areas.

 

 

Paul Johnson, Chief Executive Officer of Metal Tiger plc commented: "We are extremely pleased to see the progress being made in the drilling programme both in terms of the efficiency of operations by our JV partners and also the extent of visible mineralisation already identified.

 

Given the progress achieved and the extent of mineralisation identified we are looking forward to receipt and interpretation of the assay results and the completion of the remainder of this stage of the drilling programme.

 

Further updates will be provided to market in due course."

 

 

 

 

 

 

Further Information

 

Metal Tiger is pleased to announce the first five RC drill holes (MO-A-01R to MO-A-05R) completed by MOD and Metal Tiger Plc (MTR) at Tshimologo intersected significant down hole widths (between 5m and 42m) of disseminated copper mineralisation. Drilling intersected both oxide copper (malachite and chrysocolla) and deeper sulphide copper (chalcocite and bornite) mineralization. The drilling, logging and sampling is being managed and supervised on the ground by MOD's General Manager Exploration (Africa) Mr Janse van Rensburg (a JORC competent person), with the work carried out in line with exploration best practice.

 

 

Drill Hole ID

Collar

UTM East

Collar

UTM North

Azi

Dip

EOH

M

MO-A-01R

569707

7618720

345

-60

73

MO-A-02R

569731

7618692

345

-60

100

MO-A-03R

570128

7618742

345

-60

100

MO-A-04R

570099

7618675

160

-60

150

MO-A-05R

570133

7618582

340

-60

139

MO-A-06R

569802

7618570

160

-60

120

 

Table 1: Tshimologo RC drill hole collar coordinates and survey parameters

 

 

Tshimologo is the first target to be drilled by MOD and MTR on the recently acquired DMI licences (MOD:70%; MTR:30%) which cover approximately 200km of the prospective structural contact between the Namibian border and the Mahumo copper/silver deposit. Tshimologo, which means 'Beginning"in Setswana and was previously named 'Aphrodite' by DMI. DMI conducted limited, widely spaced drilling at Tshimologo in 2012.

 

The recent holes were drilled on two traverses spaced approximately 400m apart (Figure 1). Three holes were designed to test the prospective hangingwall/footwall sediment contact and three were designed to follow up previous intersections on an interpreted shear zone 200m south of the contact.

 

The occurrence of visible copper mineralization in five of the six recent drill holes suggests the potential may extend well outside the area tested to date and that additional mineralized zones may occur within this structurally complex area. Assays are awaited before drilling resumes to test this potential. Further details of drill holes MO-A-01R to MO-A-06R will be released when assay results are reported.

 

Previous intersections at Tshimologo (announced by Discovery Metals Ltd on 6 February 2013) include:

 

APRC 2790: 19.0m @ 1.0% Cu & 13g/t Ag, including 4m @ 2.6% Cu & 40g/t Ag

APDD3301: 17.5m @ 0.9% Cu & 13g/t Ag, including 7m @ 1.5% Cu & 23g/t Ag

 

 

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MAusIMM, FGS), who is a qualified geologist who meets the criteria of a qualified person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a consultant working for Mining Analyst Consulting Ltd which has been retained by Metal Tiger PLC to provide technical support.

 

 

For further information on the Company, visit: www.metaltigerplc.com:

 

Paul Johnson (Chief Executive Officer)

Tel: +44 (0)7766 465 617

Terry Grammer (Non- Executive Chairman)

Tel: +44 (0)207 099 0738

Sean Wyndham-Quin

Neil Baldwin

Nick Emerson

Andy Thacker

Spark Advisory Partners Limited

(Nominated Adviser)

SI Capital

(Sole Broker)

 

Tel: +44 (0) 2033 683 555

www.sparkadvisorypartners.com

Tel: +44 (0) 1483 413 500

 

Notes to Editors:

 

Metal Tiger plc is listed on the London Stock Exchange AIM Market ("AIM") with the trading code MTR and invests in high potential mineral projects with a precious and strategic metals focus.

 

The Company's target is to deliver a very high return for shareholders by investing in significantly undervalued and/or high potential opportunities in the mineral exploration and development sector timed to coincide, where possible, with a cyclical recovery in the exploration and mining markets. The Company's key strategic objective is to ensure the distribution to shareholders of major returns achieved from disposals.

 

Metal Tiger's Metal Projects division is focused on the development of its key project interests in Botswana, Spain, Thailand and Tanzania. In Botswana Metal Tiger has a growing interest in the large and highly prospective Kalahari copper/silver belt. In Spain Metal Tiger the Company has interests in tungsten and gold interests in the highly mineralised Extremadura region. In Thailand Metal Tiger has expanding interests over licences, applications and critical historical data covering antimony, copper, gold, silver, lead and zinc opportunities.

 

The Company has access to a diverse pipeline of new opportunities focused on the natural resource sector including physical resource projects, new natural resource centred technologies and resource sector related fintech opportunities. Pipeline projects deemed commercially may be undertaken by Metal Tiger or by an ISDX or AIM partner with whom the Company is engaged.

 

Metal Tiger also has an Asset Trading Division that holds various financial instruments for trading purposes including equities, warrants and royalty income. The aim of the division is to generate profits to reinvest into the Company's project based activities.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCAKBDDFBKKKNK
Date   Source Headline
22nd Feb 20187:00 amRNSHolding(s) in Company
21st Feb 20182:48 pmBUSOn market purchase – Thor Mining
12th Feb 20184:13 pmBUSMOD Resources Investment Update
8th Feb 201810:05 amBUSOn Market Purchase in Thor Mining
5th Feb 20189:42 amRNSPublication of Investor Presentation
5th Feb 20189:18 amBUSDirector Dealing
2nd Feb 20182:05 pmRNSSecond Price Monitoring Extn
2nd Feb 20182:00 pmRNSPrice Monitoring Extension
2nd Feb 201812:15 pmBUSKEMCO PLC IPO Update
31st Jan 20188:33 amBUSKingsgate Investment Update
31st Jan 20187:00 amBUST3 Pre-Feasibility Study Results
30th Jan 20186:22 pmRNSHolding(s) in Company
29th Jan 20187:51 amBUSOn Market Purchase Thor Mining
25th Jan 20187:00 amBUSBotswana Copper/Silver Project T3 Update & Major Regional Exploration Programme
23rd Jan 201812:02 pmBUSStrategic Investment & Agreement – Thor Mining
23rd Jan 20189:11 amBUSKingsgate Investment Update - Replacement
23rd Jan 20187:47 amBUSKingsgate Investment Update
15th Jan 20185:19 pmBUSDirector Warrant Conversion
11th Jan 20182:30 pmBUSDirector Share Purchase
9th Jan 201811:00 amBUSKingsgate Consolidated General Meeting - Replacement
9th Jan 20188:34 amBUSKingsgate Consolidated General Meeting
5th Jan 20182:04 pmBUSHolding(s) in Company
5th Jan 20188:33 amBUSBotswana Copper/Silver Project Record High Grade Intersection at T3 Deposit
3rd Jan 20182:41 pmBUSExercise of Warrants
29th Dec 201710:11 amBUSExercise of Warrants
29th Dec 20177:00 amRNSResponse to Shareholder Letter Issued by Kingsgate
22nd Dec 20179:16 amBUSExtension of Warrant Period
21st Dec 20177:59 amRNSHolding(s) in Company
20th Dec 20174:55 pmRNSHolding(s) in Company
20th Dec 20174:28 pmBUSInvestment Update
12th Dec 201710:50 amRNSInformation Memorandum in relation to Kingsgate
8th Dec 20171:50 pmBUSUpdate on Minerals Management Master Plan
7th Dec 201710:57 amRNSReceipt of final GWRI & KEMCO Hydrogeology Study
7th Dec 20177:02 amBUSStatement re Botswana Copper/Silver Project – T3 Deposit: Underground Study Update
5th Dec 20177:05 amRNSKingsgate Shareholder Meeting
28th Nov 20177:26 amBUSBotswana Copper/Silver Project T3 Deposit: Environmental Approvals & Prefeasibility Study Update
27th Nov 20171:36 pmRNSHOLDING(S) IN COMPANY
24th Nov 201712:02 pmBUSExercise of Warrants
22nd Nov 20173:05 pmRNSSubmission of Members Statement to Kingsgate
22nd Nov 201712:38 pmBUSExercise of Warrants
16th Nov 20179:33 amBUSShare Issue
15th Nov 20179:40 amRNSChange at Kingsgate Consolidated Limited
15th Nov 20177:30 amBUSInvestment Update – Request for Shareholder Meeting at Kingsgate Consolidated Limited for Potential Board Changes
14th Nov 20177:19 amBUSBotswana Copper/Silver Project – Growing Potential Outside Existing Planned Pit
13th Nov 20174:24 pmBUSHolding(s) in Company
8th Nov 20177:00 amBUSExercise of Warrants
6th Nov 20179:50 amBUSShare Issue
27th Oct 20178:29 amBUSInvestment Update
25th Oct 20178:32 amRNSTR-1: Notification of major holdings
24th Oct 20177:33 amBUSBotswana Copper/Silver Project – T3 Deposit Drilling Assay Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.