Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMTA.L Regulatory News (MTA)

  • There is currently no data for MTA

Operations Update

1 Jun 2011 07:00

RNS Number : 6166H
Matra Petroleum PLC
01 June 2011
 



1 June 2011

 

Matra Petroleum plc

("Matra" or the "Company")

 

Operations Update

 

Matra, an independent oil and gas exploration and production company with operations in Russia, is pleased to announce the following operations update for its Sokolovskoe Field:

 

Well-12

 

Following pressure analysis and well testing which had indicated that Well-12 would benefit substantially from acid treatment, Well-12 was successfully treated with acid and cleaned-up with nitrogen, utilising a coiled-tubing unit. During clean-up and whilst pumping nitrogen the well produced at rates in excess of 1,000 barrels of oil per day ("bopd").

 

During the latter stages of the operation however, the well appears to have developed a leak in the casing at a level above the main reservoir. This has allowed water to enter the well and is affecting well performance.

 

The well is currently producing on natural flow and over the last two days averaged 720 barrels per day but with water cut increasing to around 30%.

 

Well-12 will continue to be produced until a workover rig is available - expected within the next two to three weeks. The length of the workover is unknown until the source of the leak is fully identified. The well will be returned to production on completion of the workover.

 

Well-13

 

Analysis of data from Well-13 indicated that acid treatment would be less effective than for Well-12. Bearing this in mind together with likely operational risks following the previous remedial cementation to shut-off water, acid treatment was not recommended for this well.

 

After cleaning out residual water with the coiled tubing unit and nitrogen, Well-13 is now producing 40-45 bopd on a 4.5mm choke with a wellhead pressure of 75 psi, without any indications of water production. Installation of a downhole pump in Well-13 at a later date is likely to increase production to the 80-90 bopd level.

 

Well-13 currently has leased production equipment on site. This equipment lease ends on June 10th and the well will be shut-in whilst suitable production equipment is manufactured (a two to three month shut-in is anticipated). The well will then be returned to production.

 

Matra's Managing Director, Peter Hind commented:

 

"The acid treatment has been very successful in improving productivity in Well-12, and the well appears to be capable of oil production under natural flow of close to 1,000 barrels of oil per day.

 

An apparent leak in the casing in the well has allowed water into the system and needs to be repaired before confirming this result. A workover rig will be mobilised to the site as soon as the relevant equipment can be sourced.

 

It's pleasing to see that Well-13 is producing oil without any signs of water. Whilst acid treatment may have improved productivity of this well a little, there were significant operational risks associated with this and accordingly, such treatment was not recommended.

 

The fact that both wells were drilled to meet our licence obligations means that they were not ideally configured for production. This has caused various operational difficulties that can be eliminated by design changes for subsequent development wells."

 

Competent Person's Statement:

 

The information in this release that relates to technical matters has been reviewed by Dr Neil Hodgson (BSc, PhD) Matra's Exploration Director, a Petroleum Geologist with 25 years experience and who is a Fellow of the Geological Society and a member of the Petroleum Exploration Society of Great Britain (PESGB).

 

 

For further information, please contact:

 

Matra Petroleum plc www.matrapetroleum.com

Peter Hind, Managing Director Tel: +44 (0) 7990 807855

Neil Hodgson, Exploration Director Tel: +44 (0) 7973 342822

 

Matrix Corporate Capital LLP Tel: +44 (0) 20 3206 7000

Robin Henshall

Nick Stone

 

Pelham Bell Pottinger Tel: +44 (0) 20 7861 3232

Nick Lambert / Henry Lerwill

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDBGDUGGXBGBB
Date   Source Headline
26th Jan 20102:38 pmRNSOperations Update
22nd Jan 20107:00 amRNSChange of Significant Shareholder
4th Jan 201010:26 amRNSAppointment of Matrix as NOMAD and broker
22nd Dec 200912:00 pmRNSDrilling Update
25th Nov 20097:00 amRNSPlacing to raise ?2m
4th Nov 200910:48 amRNSHolding(s) in Company
27th Oct 20093:57 pmRNSDirector/PDMR Shareholding
27th Oct 20097:00 amRNSSokolovskoe - Well A13 spud
26th Oct 20097:00 amRNSHolding(s) in Company
21st Oct 20097:55 amRNSAward of Options
21st Oct 20097:36 amRNSRussia - Operational Update
30th Sep 20097:00 amRNSOperational Update
28th Sep 20097:00 amRNSDirectorate Change
24th Sep 200910:40 amRNSHolding(s) in Company
18th Sep 20097:00 amRNSHolding(s) in Company
24th Aug 20097:00 amRNSInterim Results to 30 June 2009
3rd Aug 20099:56 amRNSRig contracted for Sokolovskoe well
24th Jul 200911:17 amRNSEGM Statement
24th Jul 20098:29 amRNSHolding(s) in Company
17th Jul 20097:00 amRNSHolding(s) in Company
15th Jul 200910:05 amRNSHolding(s) in Company
7th Jul 20092:02 pmRNSDirector participation in Placing
7th Jul 20097:12 amRNSNotice of EGM
7th Jul 20097:00 amRNSPlacing
1st Jul 20097:00 amRNSLicence boundary extension
26th Jun 20094:25 pmRNSResult of AGM
27th May 20097:00 amRNSAGM and Annual Financial Report
11th May 20097:00 amRNSHolding(s) in Company
7th Apr 20099:27 amRNSRussian VAT Refund
23rd Mar 20097:00 amRNSFinal Results
5th Jan 20097:00 amRNSRussia - Revised work schedule
18th Dec 20087:00 amRNSDisposal of Hungary Assets
12th Nov 20087:00 amRNSUpdate
17th Sep 20087:00 amRNSDirector/PDMR Shareholding
21st Aug 20087:00 amRNSInterim Results to 30 June 20
30th Jul 20087:00 amRNSIssue of Equity
14th Jul 20087:00 amRNSPamuk-1 Sidetrack Result
11th Jul 20087:00 amRNSRussia - Court Case Result
9th Jul 200810:28 amRNSRussia - Court Hearing
4th Jul 200810:11 amRNSExercise of Options
4th Jul 20087:00 amRNSRussia - Arbitration Filing
1st Jul 20087:00 amRNSRussia - Operations Update
26th Jun 20087:00 amRNSRussian Court Proceedings
24th Jun 20087:04 amRNSPamuk-1 well update
28th May 20087:00 amRNSAcid Treatment Successful
22nd May 20087:00 amRNSHungary - Pamuk-1 Well Spud
15th May 20087:11 amRNSArkhangelovskoe-11 Result
30th Apr 20087:02 amRNSHungary Update
25th Apr 200811:59 amRNSAGM Statement
2nd Apr 20087:01 amRNSAccounts and AGM Notice

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.