Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMosman Oil & Gas Regulatory News (MSMN)

  • There is currently no data for MSMN

Operations update

17 Feb 2021 08:03

RNS Number : 4015P
Mosman Oil and Gas Limited
17 February 2021
 

 17 February 2021

Mosman Oil and Gas Limited

("Mosman" or the "Company")

 

 Operations update

 

Mosman Oil and Gas Limited (AIM: MSMN) the oil exploration, development and production company, announces an update on operations in the US.

 

Stanley

The Operator has recently recompleted Stanley-1 in a zone that has been productive in Stanley-2, and initial flow rates (3 day average) are 47 bopd gross. The Company will provide a further update in due course once production rates have stabilised at Stanley-1.

 

Stanley-2, 3 and 4 continue to produce oil, with a total project production (including Stanley 1) of circa 260 bopd (3 day average) gross. Mosman has 16-18% working interest in these wells. Water production is managed by on-site water injection that has not been affected by recent unusual cold weather conditions.

 

Falcon

Minor equipment upgrades have been installed at the Falcon-1 well. The well has been temporarily shut-in since 15 February due to the weather conditions, to avoid water vapour freezing in the gas lines. Oil production and produced water is stored in tanks and has to be trucked off site. The Operator expects to have the well back on production once freezing conditions end, which are forecast to improve and warm up on Saturday. Mosman has 50% working interest in this well. Further updates will be provided in due course.

 

Other Production

The majority of current production comes from the Stanley and Falcon projects. Mosman has not been advised of any effect of the weather on other facilities such as Greater Stanley and Arkoma.

 

Drilling opportunities

Mosman confirms its intention to participate in the drilling of multiple wells in the 2021 year.

 

The candidates for drilling include wells at the Stanley project (where four wells have already been drilled with a 100% drilling success rate) and other wells in East Texas, including wells at Greater Stanley, Cinnabar and Galaxie. Of these projects, Mosman only has control of the timing of operations where it is the Operator, at the Cinnabar lease.

 

The Cinnabar lease acquisition is considered a potential cornerstone of the Challenger Project to re-develop the proven oil producing area. Mosman has 97% working interest (reducing to 85% upon drilling of the first well) in the Cinnabar lease and is the Operator. The initial review of existing data has led Mosman to commit to a full field redevelopment study that will be based on technical work which includes the following:

 

· Acquiring additional seismic data

· Reprocessing the seismic data

· Revised geological model

· Acquiring additional leases

· Identifying optimal drilling locations

· Designing wells

· Drilling planning

 

The successful drilling of Falcon-1 means there are several prospects to be drilled in the Falcon and Galaxie lease area (Champion Project). The Falcon-1 well production data will be used to estimate the size of that gas field, and to update the geological model, before a decision is made where to drill the next well in the Champion Project. Mosman has 50% interest in the Falcon lease and 60% working interest in the Galaxie lease.

 

There are several potential wells in the Greater Stanley area that require further work before being ready to drill. The work includes leasing, gaining well spacing approval and technical work to determine optimal target locations. The zone that is producing at Stanley-1 and 2 is thought to extend in to the Duff lease, and is a candidate for recompletion of the Duff-2 well. Mosman has 20% working interest in the Duff lease.

 

John W Barr, Chairman, said: "Mosman appreciates the work and effort that is involved in getting a project completed and maintaining solid production. Presently, the Covid pandemic, heavy rain and this severe cold weather are examples of reasons why things sometimes take longer than anticipated.

 

"For the moment, the safety of people, and the operations is imperative. Hopefully, normality will return shortly, along with communications that have been difficult due to rolling power blackouts."

 

 

Qualified Person's Statement

The information contained in this announcement has been reviewed and approved by Andy Carroll, Technical Director for Mosman, who has over 35 years of relevant experience in the oil industry. Mr. Carroll is a member of the Society of Petroleum Engineers.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

Enquiries:

 

Mosman Oil & Gas Limited

John W Barr, Executive Chairman

Andy Carroll, Technical Director

jwbarr@mosmanoilandgas.com

acarroll@mosmanoilandgas.com

 

NOMAD and Joint Broker

SP Angel Corporate Finance LLP

Stuart Gledhill / Richard Hail / Adam Cowl

+44 (0) 20 3470 0470

 

Alma PR

Justine James

+44 (0) 20 3405 0205

+44 (0) 7525 324431

mosman@almapr.co.uk

 

Joint Broker

Monecor (London) Ltd trading as ETX Capital

Thomas Smith

+44 (0) 20 7392 1432

Updates on the Company's activities are regularly posted on its website: www.mosmanoilandgas.com

 

Technical Glossary

BBLs or bbls 

Barrels

BOPD or bopd

barrels of oil per day

BOEPD or boepd

barrels of oil equivalent per day calculated on the approximate 1:6 basis of the calorific value of the hydrocarbons, (not based on the price)

MMCFPD or mmcfd

MMBTU

Million cubic feet per day

 

Million British Thermal Units

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSFESAWEFSESE
Date   Source Headline
5th Aug 20197:00 amRNSSpudding of Stanley-3
31st Jul 20198:02 amRNSSix Month Production Update
24th Jul 201911:59 amRNSAustralian Exploration Update
15th Jul 20197:00 amRNSStanley-2 Initial Production
1st Jul 20197:00 amRNSSale of Strawn Production Facilities and Leases
27th Jun 201912:38 pmRNSStanley Project Update
25th Jun 20197:00 amRNSOperations Update
14th May 20197:00 amRNSChampion drilling, fundraising and Stanley update
8th May 20197:05 amRNSCorporate Presentation
8th May 20197:00 amRNSFarm-out of Champion Project
24th Apr 20199:00 amRNSProduction Update
18th Apr 20198:38 amRNSStanley Production Update
11th Apr 201910:03 amRNSStanley Project Update
1st Apr 20197:00 amRNSStanley-2 Drilling Update
28th Mar 201911:10 amRNSHalf-year Report
25th Mar 20199:16 amRNSStanley Project Update
19th Mar 20197:00 amRNSStanley-2 Drilling Update
14th Mar 201911:55 amRNSTechnical Presentation at AGES conference in NT
13th Mar 20198:43 amRNSRecompletion of Stanley-1
12th Mar 20194:40 pmRNSSecond Price Monitoring Extn
12th Mar 20194:35 pmRNSPrice Monitoring Extension
4th Mar 20199:53 amRNSStanley Update
12th Feb 201911:33 amRNSUpdate on Gem International Resources Inc
7th Feb 201910:51 amRNSIncreased Interest in Texas Production Lease
6th Feb 20197:00 amRNSProduction Update
7th Jan 20192:30 pmRNSStanley-2 well update
20th Dec 20189:49 amRNSResult of AGM
11th Dec 201812:41 pmRNSSpudding Stanley-2 and Increased Working Interest
5th Dec 20182:24 pmRNSDirectors' Subscription
30th Nov 20187:00 amRNSStanley-2 Drilling Update
28th Nov 201812:54 pmRNSNotice of AGM
28th Nov 201812:50 pmRNSFinal Results
13th Nov 20188:57 amRNSStanley-1 Well Test Results
9th Nov 20188:38 amRNSPlanned drilling, operational update & fundraising
29th Oct 201811:53 amRNSTexas Projects Update
18th Oct 20188:03 amRNSWeather causes delays in Texas
18th Oct 20187:58 amRNSStanley-1 Production and Stanley-2 Update
4th Oct 20187:52 amRNSStanley First Sales and Planning of Stanley-2
28th Sep 20181:16 pmRNSArkoma Project Update
24th Sep 20187:00 amRNSAcquisitions and Baja Strategic Alliance Update
18th Sep 201812:58 pmRNSArkoma Project Update
17th Sep 20188:09 amRNSHydrocarbon Production and Sales at Stanley-1
4th Sep 20187:00 amRNSIncreased Production & new Corporate Presentation
2nd Aug 20188:11 amRNSJoint Broker Appointment
1st Aug 20187:00 amRNSSuccessful drilling at Stanley completed
30th Jul 20187:07 amRNSProduction almost doubles at Welch Project
25th Jul 20187:00 amRNSArkoma: 27% WI with option to increase to 33.3%
20th Jul 20187:32 amRNSStanley Drilling Project Update
17th Jul 201810:01 amRNSJuly 2018 Operations Update
2nd Jul 20187:00 amRNSArkoma Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.