Mosman Oil and Gas Limited (AIM: MSMN) the oil exploration, development and production company, announces an update in respect to its current operations.

 

USA Projects

 

Mosman completed the acquisition of the Strawn Oil Project in Texas ('Strawn') at the beginning of May with its Strategic Alliance partner Blackstone Oil and Gas. This was the first acquisition to conclude as part of Mosman's growth strategy and the Company is continuing to evaluate oil and gas opportunities, of which a select number of potential opportunities remain under review.

 

At Strawn, the process of increasing production and implementing maintenance is underway. Once essential work, including repairs to pumping equipment and roads, are completed, well workovers will then commence. The Company's plan is to steadily build production and thus cash flow, which will initially be re-invested with a view to increasing production.

 

The Company's Technical Director will shortly return to North America to meet with the team and review progress at Strawn in addition to further evaluating other projects.

 

Mosman will provide an update at the appropriate time, should matters progress on any additional projects.

 

AUSTRALIA

Amadeus Basin Permits

 

Mosman owns and operates two granted permits (EP 145 & 156) and one application (EPA 155).

 

There is significant ongoing activity in the region, which appears to be fundamentally driven by the current domestic gas shortage on the East Coast of Australia. Mosman's permits are strategically located as they are surrounded by, or adjacent to several permits held by major energy suppliers. In particular EP 145 is adjacent to the Mereenie project on which the major Operator, Central Petroleum Limited, has received a takeover offer from Macquarie Bank Limited The Northern Territory Government has granted approval to the NT Gas Pipeline that will take gas from NT to the East Coast markets. Santos continues the farmin work on permits adjacent to Mosman permits, and Origin Energy Limited has increased their interests in NT exploration acreage.

 

The fieldwork programme at EP145 was completed some time ago, but unfortunately the key consultant has been seriously ill and the report is still being finalised.

 

In EP 156, the planned and approved airborne survey that was delayed due to weather is now expected to be flown very shortly.

 

For EPA 155, the next step is native title approval, with a site visit scheduled for later this year.

 

NEW ZEALAND

Murchison

 

In 2016 after a long delay Mosman received approval from NZPAM to modify the work program whereby LiDAR replaced a licence condition to acquire magnetic and gravity data. The analysis of the LiDAR survey was very useful. However it confirmed that the planned drilling location in the Blackwater Valley was not suitable due to multiple faults at that location. Further work indicates that the preferred well location may be the testing of a large anticline in the Te Wiriki area in the North West of the permit. Extensive planning of a seismic survey has subsequently taken place to provide an accurate location for the well. Prior to the survey commencing, the normal landowner and other consents have to be obtained, and the equipment mobilised. Mosman is in discussions with NZPAM regarding the timing of this work program, and has specifically requested a Change of Conditions for the permit from NZPAM as the drilling scheduled for early in 2017 will be delayed. This is not unusual in the industry; for example an extension was granted by the NT Government on both the Amadeus Permits in 2016.

 

Mosman continues to actively pursue farm-in investment to fund the drilling. The marketing currently is being conducted through industry consultants and a media agency that works with NZPAM and other companies in NZ.

 

Petroleum Creek

 

The lower oil price and flow test results indicate the wells are not commercial. The wells are being actively monitored and if circumstances do not change then the wells may be plugged and abandoned so that the permit can be relinquished.

 

Competent Person's Statement

 

The information contained in this announcement has been reviewed and approved by Andy Carroll, Technical Director for Mosman, who has over 35 years of relevant experience in the oil industry. Mr. Carroll is a member of the Society of Petroleum Engineers.

 

 

INVESTMENTS

Gem International Resources Inc. (TSX.V GI) (Gem)

 

Mosman owns 8,000,000 shares and eight million two year 15.0 cent (CAD) options acquired at a price of 5.0 (CAD) cents. GEM is currently trading at 5.0 (CAD) cents.

 

Gem is focussed on a diamond project in Angola, and has recently announced:

· The completion of a private placement raising CAD$3,000,000.

· An extension of the existing Angolan option, wherein the potential kimberlite assets are now included with the current alluvial assets.

· An extension of the timetable in respect to the second raising and the Angolan option.

 

GEM's website can be found at: http://gemdiamondmining.com

 

Hemisphere Energy Corporation (TSX.V HME) (Hemisphere)

 

Mosman did own 2,000,000 shares in Hemisphere, acquired at a price of 19.0 (CAD) cents a share. HME is currently trading at 23.5 (CAD) cents.

 

Mosman recently sold down approximately 500,000 shares in Hemisphere, locking in a profit on that portion of the investment.

 

Hemisphere's website can be found at: www.hemisphereenergy.ca 

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Enquiries:

Mosman Oil & Gas Limited

John W Barr, Executive Chairman

Andy Carroll, Technical Director

jwbarr@mosmanoilandgas.com

acarroll@mosmanoilandgas.com

 

NOMAD and Broker

SP Angel Corporate Finance LLP

Stuart Gledhill / Richard Hail

+44 (0) 20 3470 0470

 

Gable Communications Limited

Justine James / John Bick

+44 (0) 20 7193 7463

mosman@gablecommunications.com

 

Updates on the Company's activities are regularly posted on its website

www.mosmanoilandgas.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCOKBDBPBKKCPD
Date   Source Headline
31st Mar 20231:28 pmRNSHolding(s) in Company
30th Mar 20237:30 amRNSHalf-year Report
29th Mar 202312:23 pmRNSHolding(s) in Company
28th Mar 20234:16 pmRNSHolding(s) in Company
28th Mar 20238:57 amRNSCorporate Review
28th Mar 20237:48 amRNSHolding(s) in Company
21st Mar 20232:38 pmRNSHolding(s) in Company
17th Mar 20232:04 pmRNSAdvisor Update
17th Mar 202311:36 amRNSHolding(s) in Company
15th Mar 20234:52 pmRNSHolding(s) in Company
15th Mar 20237:03 amRNS78% Increase in Cinnabar Project Proved Reserves
21st Feb 202311:35 amRNSHolding(s) in Company
20th Feb 20237:00 amRNSSacred Site Clearance Certificate for EP 145
30th Jan 20237:10 amRNSQuarterly Production and Cinnabar-1 Update
16th Jan 20237:00 amRNSCinnabar-1 pipeline completed & regular oil sales
6th Jan 20238:12 amRNSCinnabar-1 Initial Production
6th Jan 20237:01 amRNSHolding(s) in Company
6th Jan 20237:00 amRNSHolding(s) in Company
30th Dec 20228:06 amRNSCinnabar-1 well flows Oil and Gas
22nd Dec 20228:24 amRNSCinnabar-1 well update
14th Dec 20227:25 amRNSCinnabar-1 well production update
2nd Dec 20228:36 amRNSDirector Holdings
29th Nov 20223:50 pmRNSResults of Annual General Meeting
26th Nov 20226:01 pmEQSMosman Oil and Gas sees Cinnabar as a potential 'step-change'
17th Nov 20227:00 amRNSCinnabar-1 well production update
7th Nov 20221:42 pmRNSNotice of AGM
7th Nov 202212:08 pmRNSFinal Results
4th Nov 202210:26 amRNSHolding(s) in Company
4th Nov 20229:35 amRNSHolding(s) in Company
28th Oct 20221:53 pmRNSHolding(s) in Company
27th Oct 202210:42 amRNSCinnabar Development, Well Planning and Placing
26th Oct 20224:31 pmRNSHolding(s) in Company
26th Oct 20224:29 pmRNSHolding(s) in Company
26th Oct 20227:33 amRNSCinnabar Near Term Production Opportunities
24th Oct 20224:40 pmRNSSecond Price Monitoring Extn
24th Oct 20224:35 pmRNSPrice Monitoring Extension
24th Oct 20227:00 amRNSEP145 Prospective Resource Est - Helium & Hydrogen
24th Oct 20227:00 amRNSCinnabar Well Moving to Production
21st Oct 202211:41 amRNSRegistered office
18th Oct 20222:01 pmRNSHolding(s) in Company
17th Oct 202211:12 amRNSCinnabar Well Drille an Moving to Prouction
17th Oct 202211:12 amRNSCinnabar Well Drilled and Moving to Production
17th Oct 20227:00 amRNSQ1 Prouction Upate
17th Oct 20227:00 amRNSQ1 Production Update
10th Oct 20227:00 amRNSCinnabar-1 Drilling update
3rd Oct 20227:00 amRNSSpud of Cinnabar Well
27th Sep 20227:12 amRNSEP(A) 155 update
19th Sep 20227:54 amRNSUpdated Spud of Cinnabar Well
14th Sep 20228:47 amRNSSpud of Cinnabar Well
30th Aug 202210:59 amRNSProgress of Cinnabar Well Drilling

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.