Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

US Operations Update

4 Jun 2008 11:30

RNS Number : 9442V
Melrose Resources PLC
04 June 2008
 



FOR IMMEDIATE RELEASE

4 June 2008

MELROSE RESOURCES PLC

US Operations Update

Melrose Resources plc (LSE: MRS) ("Melrose" or "the Company"today gives the following update on its operations in the USA

Permian Basin Infill Drilling and Waterflood Programme

In late 2007, the Company announced its intention to implement a major infill drilling and waterflood development programme in its three principal fields in the Permian Basin, the Jalmat, Turner Gregory and Artesia fields. The objective of the programme is to access 9.0 MMbbls and 7 Bcf of proved undeveloped oil and gas reserves and to increase the Company's production in the Permian Basin from 750 bopd to in excess of 3,000 bopd over the next two yearsThe project will involve drilling approximately 120 new wells and converting around 50 wells to water injection and the capital investment is expected to be approximately $55 million. 

Development drilling activity commenced in the Jalmat field in Lea CountyNew Mexico in late February 2008. Ten wells have been drilled to date and the eleventh well will spud shortly. Drilling operations are going smoothly and the time spent on location for each well is averaging 7 days. Six of the new wells have already been completedfour as permanent producers and two as temporary producers. The latter two wells will eventually be converted to water injection but will be flowed in the short to medium term to take advantage of the better than expected reservoir pressure and quality which they encounteredThe four other new wells will be completed as injectors shortly.

In the Turner Gregory field in Mitchell County, Texaslarger pump units have been fitted on ten wells and surface facilities have been upgraded to accommodate the planned water injection programme. A second drilling rig is being contracted to commence the infill drilling operations in this field in the third quarter 2008. 

In the Artesia field in Eddy County, New Mexico, work is progressing on the installation of water injection facilities. A new tank battery has been completed in the southern area of the field and the building pad for new injection water pumping station is being prepared. Development plans for this field are now being finalised with a view to accelerating the work programme and commencing drilling operations with a third rig in the fourth quarter of the year. 

The combined field production rate is currently averaging just over 1,000 bopd, representing aincrease of approximately 35% over the pre-investment programme production rate. 

In parallel with the development activity, detailed reservoir evaluation work is continuing on all three fieldwith a view to better quantifying their probable reserves which Melrose has not previously booked. These additional reserves may be material since the assumed waterflood recoveries appear conservative by comparison with local field analogues. In addition, there is potential to increase reserves further through follow-on infill drilling campaign to decrease the well spacing from the 20 acre patterns being targeted by the current investment programme to 10 acre spacing. The economics of this are particularly attractive at current oil prices. In the longer term, possible tertiary recovery projects involving CO2 injection will be studied for the fields. 

East Texas Exploration 

On the Company's properties in East Texas, the Holmes No.4 appraisal well in Harris County will spud later this week. The well, which will test an extension of the Holmes fieldhas unrisked incremental reserves of 9 Bcf with a chance of success of 44%. In the event that the well is a success, a number of similar appraisal well locations may subsequently be drilled as follow-on targets.

Also in Harris Countytwo further deep gas exploration prospects are being brought forward for drilling in the third and fourth quarters of 2008, respectivelyEach of these wells will target unrisked reserves of over 25 Bcf, with a chance of success of over 50%, and has significant upside potential. 

Commenting on this, David ThomasChief Executive, said:

"We are pleased that Permian Basin development programme is yielding such positive early results and we are confident that this project will add material value for Melrose over the next two years. The ongoing technical evaluation of our East Texas acreage has also generated a number of attractive prospects and we look forward to testing the deep exploration potential in this area during the second half of the year."

For further information please contact:

Melrose Resources plc

David Thomas, Chief Executive

Robert Adair, Executive Chairman

Munro Sutherland, Finance Director

0131 221 3360

Buchanan Communications 

Ben Willey

0207 466 5000

Ben Romney

or visit www.melroseresources.com

Glossary

Bcf - billion cubic feet of gas 

bopd - barrels of oil per day

MMbbls - million barrels of oil 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGGGGVGDGGRZM
Date   Source Headline
20th May 20083:36 pmRNSArticles of Association
15th May 200812:14 pmRNSAnnual Report and Accounts
13th May 20088:30 amRNSInterim Management Statement
24th Apr 200811:04 amRNSOperations Update
11th Apr 20083:20 pmRNSDirector/PDMR Shareholding
31st Mar 20089:56 amRNSDirector/PDMR Shareholding
31st Mar 20089:35 amRNSTotal Voting Rights
27th Mar 20083:21 pmRNSBlock Listing Return
27th Mar 20083:13 pmRNSMajor Interests in Shares
27th Mar 200810:33 amRNSDirector/PDMR Shareholding
25th Mar 200811:30 amRNSTR-1-Notification of Interest
18th Mar 20087:01 amRNSPreliminary Results
25th Feb 200810:15 amRNSAnalyst Site Visit
19th Feb 200811:30 amRNSNotice of Results
19th Feb 20089:30 amRNS2007 Production Report
31st Jan 20084:40 pmRNSSecond Price Monitoring Extn
31st Jan 20084:35 pmRNSPrice Monitoring Extension
21st Jan 20087:01 amRNSDrilling Update
18th Jan 20084:40 pmRNSSecond Price Monitoring Extn
18th Jan 20084:35 pmRNSPrice Monitoring Extension
17th Jan 200811:19 amRNSEgypt Update
14th Jan 20084:25 pmRNSAnnual Information Update
4th Jan 200811:15 amRNSUnited States Update
7th Dec 200711:19 amRNSDirector's Shareholding
7th Dec 200711:16 amRNSBulgaria Update
4th Dec 20074:35 pmRNSPrice Monitoring Extension
30th Nov 200710:59 amRNSOperations Update
28th Nov 200710:20 amRNSIndependent Non Exec Director
13th Nov 20073:01 pmRNSDirectorate Change
8th Nov 20074:40 pmRNSSecond Price Monitoring Extn
8th Nov 20074:35 pmRNSPrice Monitoring Extension
7th Nov 20079:55 amRNSBulgarian Operations Update
2nd Nov 200711:00 amRNSBond Offering Update
18th Oct 200710:22 amRNSE250m Bond Offering
10th Oct 20077:01 amRNSOperations Update
21st Sep 20077:01 amRNSInterim Report
4th Sep 200711:03 amRNSHolding(s) in Company
3rd Sep 20074:35 pmRNSDirector/PDMR Shareholding
30th Aug 20071:51 pmRNSHolding(s) in Company
29th Aug 20077:00 amRNSInterim results
24th Aug 20072:58 pmRNSChange of Company Secretary
24th Aug 20072:21 pmRNSChange of Company Sectretary
9th Aug 20079:30 amRNSNotice of Results
8th Aug 200711:57 amRNSDirectors' Share Plan
12th Jul 20073:42 pmRNSDirector's Shareholding
12th Jul 20073:42 pmRNSBlock Listing Return
11th Jul 200711:00 amRNSEgypt Drilling Update
28th Jun 20075:04 pmRNSDirectors' Shareholdings
28th Jun 20071:28 pmRNSPerformance Share Plan
21st Jun 200710:31 amRNSDirectors' Shareholdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.