Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

29 Jul 2005 07:01

Melrose Resources PLC29 July 2005 FOR IMMEDIATE RELEASE 29 JULY 2005 MELROSE RESOURCES PLC Operations Update - Egypt Melrose Resources plc today announces the results of the latest wells to bedrilled in Egypt. Three have been successfully drilled and tested and all willbe put on production. The South Mansoura No.2 well was drilled to test the extent of the producingSouth Mansoura No.1 structure and also a deeper Pliocene seismic bright spot.The deeper interval was encountered between 6,094 and 6,130 ft and an 8 ftinterval was perforated. The well flowed at 9.6 MMcfpd on a 24/64th choke with aflowing well head pressure of 2,406 psi. The ECDC 1 rig will now move to drillthe El Tamad No.2 appraisal well. The El Tamad discovery well drilled earlier inthe year, in the Sidi Salim formation, flowed at over 2,000 bopd and 1.5 MMcfpdand is the first black oil discovery in the Nile Delta. The South Mansoura No.6 well was drilled to test targets at both the Abu Madiand Pliocene levels. An Abu Madi reservoir interval was encountered between8,000 ft and 8,050 ft but the reservoir quality was relatively poor so thisinterval was not completed. A good Pliocene interval was encountered between3,970 and 4,020 ft and a 35 ft interval was perforated. The well flowed at 5.4MMcfpd on a 24/64th choke with a flowing well head pressure of 1,588 psi. The South Batra No.21 well was drilled to test the main Abu Madi Level II targetand a deeper horizon, thought to be Sidi Salim. The Abu Madi came in on depthfrom 9,461 to 9,505 ft and, while drilling ahead to the deeper target, apressure of approximately 6,500 psi was encountered, along with very high gaslevels. The well was plugged back and the Abu Madi cased to enable the deeperinterval to be re-drilled and tested. This over-pressured interval from 9,880 to9,920 ft was perforated but did not flow and it is thought that sensitive clayminerals may have reacted during drilling to damage the formation. Evaluation ofthis interval will continue. The Abu Madi interval was perforated between 9,462and 9,480 ft and flowed at 14.2 MMcfpd and 124 bcpd on a 24/64th choke with aflowing well head pressure of 3,126 psi. The PD 104 rig will now move to drillthe Kafr el Zahayra prospect which is a potentially very large Pliocenestructure located in the central part of the El Mansoura Concession with mostlikely GIIP of approximately 280 Bcf. Commenting on this, Robert Adair, Chairman, said: "We are very pleased with the latest drilling results from Egypt and lookforward to the results of the El Tamad appraisal well and the Kafr El Zahayraexploration well which will test two new plays. The outcomes of these two wellscould have great significance for the Egyptian operations. The timing of ourBulgarian drilling schedule is now firming up and we expect to spud the GalataEast appraisal well during the third week in August. This will be followed byone exploration well. We are looking forward to a very active second half of theyear with a number of exciting wells scheduled." For further information please contact: Melrose Resources plcRobert Adair , Chairman 0184 553 7037David Curry, Chief Executive 0131 221 3360Munro Sutherland, Finance Director 0131 221 3360Chris Thomas, Corporate Development Director 0207 462 1603 Buchanan Communications Ben Willey 0207 466 5000 or visit www.melroseresources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th Jan 20198:04 amRNSMRS Services Group Contract Win
18th Jan 20198:30 amRNSResult of AGM
17th Jan 20198:30 amRNSHalf Year Trading Update and Full Year Guidance
20th Dec 20181:14 pmRNSNotice of AGM
17th Dec 20187:00 amRNSBachmann Plant Hire Update
7th Dec 20189:31 amRNSFinal Results
21st Nov 20181:41 pmRNSNominated Adviser Status
16th Nov 20188:20 amRNSMRS secures the refurbishment of 6 excavators
18th Oct 20188:35 amRNSHolding(s) in Company
15th Oct 20189:20 amRNSTrading Update
12th Oct 20187:00 amRNSPaul Brenton Interview with Total Market Research
14th Sep 20187:52 amRNSBachmann Plant Hire secures AUD$2m works
31st Aug 20187:00 amRNSBachmann Plant Hire awarded $3m project with BMD
13th Aug 20188:25 amRNSHolding(s) in Company
26th Jul 20184:36 pmRNSHolding(s) in Company
24th Jul 20188:31 amRNSBachmann Plant Hire acquires Excavator
19th Jul 20189:37 amRNSHolding(s) in Company
19th Jul 20188:42 amRNSMRS Services Group acquires CAT D11T Bulldozer
18th Jul 20184:52 pmRNSHolding(s) in Company
16th Jul 20188:24 amRNSMRS Services Group - 3-year contract with Glencore
6th Jul 20183:38 pmRNSAccelerated Bookbuild
4th Jul 201810:20 amRNSHolding(s) in Company
25th Jun 20181:38 pmRNSAccelerated Bookbuild
22nd Jun 20185:06 pmRNSHolding(s) in Company
21st Jun 20181:52 pmRNSThree Year Contract
7th Jun 201811:08 amRNSHolding(s) in Company
1st Jun 201812:09 pmRNSHolding(s) in Company
23rd May 20187:00 amRNSGrant of Warrants and Options
9th May 20188:14 amRNSAcquisition of Engineering Maintenance Facility
20th Apr 201810:24 amRNSHolding(s) in Company
19th Apr 201811:15 amRNSHolding(s) in Company
3rd Apr 20187:00 amRNSDirector Retirement, Grant & Exercise of Warrants
12th Mar 20184:54 pmRNSGrant of Options
7th Mar 20182:43 pmRNSHolding(s) in Company
2nd Mar 201811:16 amRNSHolding(s) in Company
1st Mar 20187:00 amRNSExercise of Warrants
28th Feb 20187:00 amRNSHalf-year Report
21st Feb 20184:40 pmRNSSecond Price Monitoring Extn
21st Feb 20184:35 pmRNSPrice Monitoring Extension
26th Jan 20185:42 pmRNSHolding(s) in Company
26th Jan 201810:30 amRNSResult of AGM
24th Jan 20188:25 amRNSOperational Update
17th Jan 201812:38 pmRNSHolding(s) in Company
17th Jan 201812:37 pmRNSHolding(s) in Company
17th Jan 201812:36 pmRNSHolding(s) in Company
16th Jan 201810:27 amRNSHolding(s) in Company
12th Jan 20184:35 pmRNSPrice Monitoring Extension
8th Jan 20189:26 amRNSHolding(s) in Company
21st Dec 20173:51 pmRNSCEO Appointment, Director Retirement, Warrants
21st Dec 20173:14 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.