Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Operations Update

29 Jul 2005 07:01

Melrose Resources PLC29 July 2005 FOR IMMEDIATE RELEASE 29 JULY 2005 MELROSE RESOURCES PLC Operations Update - Egypt Melrose Resources plc today announces the results of the latest wells to bedrilled in Egypt. Three have been successfully drilled and tested and all willbe put on production. The South Mansoura No.2 well was drilled to test the extent of the producingSouth Mansoura No.1 structure and also a deeper Pliocene seismic bright spot.The deeper interval was encountered between 6,094 and 6,130 ft and an 8 ftinterval was perforated. The well flowed at 9.6 MMcfpd on a 24/64th choke with aflowing well head pressure of 2,406 psi. The ECDC 1 rig will now move to drillthe El Tamad No.2 appraisal well. The El Tamad discovery well drilled earlier inthe year, in the Sidi Salim formation, flowed at over 2,000 bopd and 1.5 MMcfpdand is the first black oil discovery in the Nile Delta. The South Mansoura No.6 well was drilled to test targets at both the Abu Madiand Pliocene levels. An Abu Madi reservoir interval was encountered between8,000 ft and 8,050 ft but the reservoir quality was relatively poor so thisinterval was not completed. A good Pliocene interval was encountered between3,970 and 4,020 ft and a 35 ft interval was perforated. The well flowed at 5.4MMcfpd on a 24/64th choke with a flowing well head pressure of 1,588 psi. The South Batra No.21 well was drilled to test the main Abu Madi Level II targetand a deeper horizon, thought to be Sidi Salim. The Abu Madi came in on depthfrom 9,461 to 9,505 ft and, while drilling ahead to the deeper target, apressure of approximately 6,500 psi was encountered, along with very high gaslevels. The well was plugged back and the Abu Madi cased to enable the deeperinterval to be re-drilled and tested. This over-pressured interval from 9,880 to9,920 ft was perforated but did not flow and it is thought that sensitive clayminerals may have reacted during drilling to damage the formation. Evaluation ofthis interval will continue. The Abu Madi interval was perforated between 9,462and 9,480 ft and flowed at 14.2 MMcfpd and 124 bcpd on a 24/64th choke with aflowing well head pressure of 3,126 psi. The PD 104 rig will now move to drillthe Kafr el Zahayra prospect which is a potentially very large Pliocenestructure located in the central part of the El Mansoura Concession with mostlikely GIIP of approximately 280 Bcf. Commenting on this, Robert Adair, Chairman, said: "We are very pleased with the latest drilling results from Egypt and lookforward to the results of the El Tamad appraisal well and the Kafr El Zahayraexploration well which will test two new plays. The outcomes of these two wellscould have great significance for the Egyptian operations. The timing of ourBulgarian drilling schedule is now firming up and we expect to spud the GalataEast appraisal well during the third week in August. This will be followed byone exploration well. We are looking forward to a very active second half of theyear with a number of exciting wells scheduled." For further information please contact: Melrose Resources plcRobert Adair , Chairman 0184 553 7037David Curry, Chief Executive 0131 221 3360Munro Sutherland, Finance Director 0131 221 3360Chris Thomas, Corporate Development Director 0207 462 1603 Buchanan Communications Ben Willey 0207 466 5000 or visit www.melroseresources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
19th Jun 20073:09 pmRNSDirectors' Shareholding
18th Jun 20079:33 amRNSDrilling Update in Bulgaria
13th Jun 20072:30 pmRNSAGM Statement
4th Jun 20077:00 amRNSChief Executive Update
22nd May 20079:56 amRNSBulgarian Drilling Update
9th May 20077:02 amRNSChief Executive Update
3rd May 20079:07 amRNSDrilling Update
2nd May 200710:58 amRNSAppointment of New Chief Exec
30th Apr 20077:01 amRNSTotal Voting Rights
18th Apr 20071:03 pmRNSHolding(s) in Company
18th Apr 20071:01 pmRNSHolding(s) in Company
16th Apr 20071:34 pmRNSDirectors' Shareholdings
4th Apr 20072:54 pmRNSDividend Timetable
3rd Apr 20072:56 pmRNSChange of Company Secretary
3rd Apr 20077:02 amRNSPreliminary Results
3rd Apr 20077:00 amRNSDrilling Update
30th Mar 20077:01 amRNSTotal Voting Rights
21st Mar 200711:41 amRNSNotice of Results
12th Mar 20073:27 pmRNSDirectors's Shareholding
9th Mar 20072:38 pmRNSCompletion of Placing
5th Mar 200710:59 amRNSPlacing of Shares
2nd Mar 20075:41 pmRNSTotal Voting Rights
27th Feb 20077:04 amRNSOperating Update
16th Feb 20073:04 pmRNSTrading Update
14th Feb 20071:24 pmRNSDirector/PDMR Shareholding
25th Jan 20077:01 amRNSRe: Drilling Programme
24th Jan 20071:46 pmRNSChange of Adviser
22nd Dec 200612:34 pmRNSHolding(s) in Company
19th Dec 20062:10 pmRNSTotal Voting Rights
19th Dec 20062:05 pmRNSBlocklisting Interim Review
11th Dec 20067:01 amRNSEgypt Update
23rd Nov 20068:16 amRNSDirector Declaration
23rd Nov 20067:01 amRNSAppointment non-exec director
19th Oct 200610:02 amRNSDirector's Shareholding
19th Oct 20069:29 amRNSGrant of Share Options
29th Sep 20069:52 amRNSPDMR shareholding
28th Sep 20064:37 pmRNSPrice Monitoring Extension
26th Sep 200611:24 amRNSBoard Changes
7th Sep 20067:03 amRNSInterim Results
30th Aug 20063:00 pmRNSNotification of Results
2nd Aug 200610:51 amRNSDirectorate Change
31st Jul 20067:02 amRNSOperational Update
25th Jul 20062:06 pmRNSBlocklisting Interim Review
17th Jul 20069:57 amRNSHolding(s) in Company
14th Jul 20067:00 amRNSSubstantial Shareholder
13th Jul 20062:26 pmRNSDirectors shareholdings
30th Jun 20067:02 amRNSCompletion of Acquisition
26th Jun 20062:47 pmRNSResult of EGM
15th Jun 20064:11 pmRNSResult of AGM
14th Jun 20064:49 pmRNSDirectors' Shareholdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.