Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Egypt Exploration Update

21 Apr 2006 11:54

Melrose Resources PLC21 April 2006 FOR IMMEDIATE RELEASE 21st April 2006 MELROSE RESOURCES PLC Egyptian exploration update Melrose Resources plc today announces the results of recent exploration drillingin Egypt. The Al Rawda exploration well was the first well drilled in the SE El MansouraConcession. The well was drilled to target a Sidi Salim prospect to thesouthwest of the El Tamad discovery using the ECDC-1 rig. The target intervalwas encountered between 5,866 ft and 5,910 ft and was gas filled. This isbelieved to be the gas cap overlying an oil column down-dip. A 31 ft intervalwas perforated and the well was flowed at 10.9 MMcfpd and 55 bcpd on a 28/64thschoke with a flowing well head pressure of 2,223 psi. The well will be put onproduction, tied in through the existing Sinfas facilities, as a gas producer. The rig was then moved to the South Tunbarah location which lies between ElTamad and Al Rawda on the same Sidi Salim trend. The top target interval wasencountered at 6,100 ft and encountered good hydrocarbon shows but was waterwet. The well was abandoned. The ECDC-1 rig was then moved to the Sinfas wellwhich was originally completed in and produced from a zone at 4,970 ft to 4,982ft. This lower interval was plugged and the best interval in the well from 3,780ft to 3,810 ft was tested through 10 ft of perforations. The well flowed at 6.33MMcfpd of dry gas on a 24/64ths choke with a flowing well head pressure of 1,492psi. The well will be produced through the existing facilities. The Salaka exploration well was spudded on 8th February using the PD-104 rig.This prospect lies on the southern extension of the Miocene channel system onthe west side of the South Batra Field. Good hydrocarbon shows were encounteredin three Miocene reservoir intervals (Abu Madi and Qawasim) between 8,700 ft and9,700 ft. The wireline logs indicated that the upper interval from 8,720 ft to8,880 ft, which had good hydrocarbon shows while drilling, is water wet. It islikely that this interval could be productive in an updip location which has astrong seismic anomaly. The middle interval from 9,140 to 9,214 was tested at9.0 MMcfpd and 105 bcpd on a 24/64ths choke with a flowing wellhead pressure of1,846 psi. The lower interval between 9,437 ft and 9,632 ft was tested at 8.5MMcfpd and 165 bcpd on a 24/64ths choke with a flowing well head pressure of2,404 psi. The structures are being re-mapped and an appraisal location beingworked up in order to test the full reserve potential of the Miocene in theSalaka area. A small Pliocene target was also confirmed through a 26 ft gasinterval with potential of 4 Bcf of reserves. The rig is currently moving to theKhilala No.2 appraisal well location. The EDC-9 rig is currently drilling the NE Mit Dafir exploration well targetinga higher risk Miocene channel prospect on the eastern side of the El MansouraConcession. Commenting on these developments, Robert Adair, Chairman, said: "We continue to maintain a high rate of drilling success in Egypt. The Salakawell result is particularly important as it is in effect a South Batraextension. This supports our view that the South Batra field has considerableupside in the channels we have identified to the north and south of theestablished field area. Further prospects on other extensions to the South Batrachannel system have been upgraded following this success. "The first well to appraise our West Khilala discovery will spud shortly. Ifsuccessful, this well could justify a significant increase in reserves.Following the NE Mit Dafir well, we will drill the first of two planned AbuKhadra wells. Abu Khadra is an exciting Abu Madi Level II prospect, analogous toKhilala. We will also drill the first well to appraise our West Dikirnisdiscovery. "In anticipation of the completion of the processing of the new 3-D seismic,which will be shortly available, covering the eastern side of the El MansouraConcession, a full review of all our data will occur to assess the deeperprospectivity of the licences. While this review is underway, our drillingcampaign will continue with two rigs on the targets already identified whichallows for one of the deep rigs to be loaned to another operator for six months.Full rig utilisation is planned to resume later in the year." For further information please contact: Melrose Resources plc 0184 553 7037Robert Adair, Chairman 0131 221 3360David Curry, Chief Executive 0131 221 3360Munro Sutherland, Finance Director 0207 462 1603Chris Thomas, Corporate Development Director Buchanan Communications 0207 466 5000Tim ThompsonBen Willey or visit www.melroseresources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th Jan 20198:04 amRNSMRS Services Group Contract Win
18th Jan 20198:30 amRNSResult of AGM
17th Jan 20198:30 amRNSHalf Year Trading Update and Full Year Guidance
20th Dec 20181:14 pmRNSNotice of AGM
17th Dec 20187:00 amRNSBachmann Plant Hire Update
7th Dec 20189:31 amRNSFinal Results
21st Nov 20181:41 pmRNSNominated Adviser Status
16th Nov 20188:20 amRNSMRS secures the refurbishment of 6 excavators
18th Oct 20188:35 amRNSHolding(s) in Company
15th Oct 20189:20 amRNSTrading Update
12th Oct 20187:00 amRNSPaul Brenton Interview with Total Market Research
14th Sep 20187:52 amRNSBachmann Plant Hire secures AUD$2m works
31st Aug 20187:00 amRNSBachmann Plant Hire awarded $3m project with BMD
13th Aug 20188:25 amRNSHolding(s) in Company
26th Jul 20184:36 pmRNSHolding(s) in Company
24th Jul 20188:31 amRNSBachmann Plant Hire acquires Excavator
19th Jul 20189:37 amRNSHolding(s) in Company
19th Jul 20188:42 amRNSMRS Services Group acquires CAT D11T Bulldozer
18th Jul 20184:52 pmRNSHolding(s) in Company
16th Jul 20188:24 amRNSMRS Services Group - 3-year contract with Glencore
6th Jul 20183:38 pmRNSAccelerated Bookbuild
4th Jul 201810:20 amRNSHolding(s) in Company
25th Jun 20181:38 pmRNSAccelerated Bookbuild
22nd Jun 20185:06 pmRNSHolding(s) in Company
21st Jun 20181:52 pmRNSThree Year Contract
7th Jun 201811:08 amRNSHolding(s) in Company
1st Jun 201812:09 pmRNSHolding(s) in Company
23rd May 20187:00 amRNSGrant of Warrants and Options
9th May 20188:14 amRNSAcquisition of Engineering Maintenance Facility
20th Apr 201810:24 amRNSHolding(s) in Company
19th Apr 201811:15 amRNSHolding(s) in Company
3rd Apr 20187:00 amRNSDirector Retirement, Grant & Exercise of Warrants
12th Mar 20184:54 pmRNSGrant of Options
7th Mar 20182:43 pmRNSHolding(s) in Company
2nd Mar 201811:16 amRNSHolding(s) in Company
1st Mar 20187:00 amRNSExercise of Warrants
28th Feb 20187:00 amRNSHalf-year Report
21st Feb 20184:40 pmRNSSecond Price Monitoring Extn
21st Feb 20184:35 pmRNSPrice Monitoring Extension
26th Jan 20185:42 pmRNSHolding(s) in Company
26th Jan 201810:30 amRNSResult of AGM
24th Jan 20188:25 amRNSOperational Update
17th Jan 201812:38 pmRNSHolding(s) in Company
17th Jan 201812:37 pmRNSHolding(s) in Company
17th Jan 201812:36 pmRNSHolding(s) in Company
16th Jan 201810:27 amRNSHolding(s) in Company
12th Jan 20184:35 pmRNSPrice Monitoring Extension
8th Jan 20189:26 amRNSHolding(s) in Company
21st Dec 20173:51 pmRNSCEO Appointment, Director Retirement, Warrants
21st Dec 20173:14 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.