Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Drilling Update

3 Jul 2008 07:00

RNS Number : 1993Y
Melrose Resources PLC
03 July 2008
 



FOR IMMEDIATE RELEASE

3 July 2008

MELROSE RESOURCES PLC 

Exploration and Appraisal Drilling Update 

Melrose Resources plc (LSE:MRS) ("Melrose" or "the Company"), the oil and gas exploration, development and production company, today announces a successful appraisal well in the USA and provides an update on its exploration and appraisal programme in Egypt. 

USA 

In East Texas, the Holmes No.4 well has been successfully drilled to appraise the Van Reit formation at a location to the southwest of the main producing Holmes field. The well reached a total depth of 10,197 feet and encountered the top reservoir at 9,820 feet where strong gas shows were experienced whilst drilling. Open-hole logs confirmed the presence of a net gas pay interval of 29 feet with an average porosity and water saturation of 21% and 28%, respectively. The reservoir pressure indicates that the discovery area has not been depleted by production from the main field. 

The discovery is estimated to contain probable reserves of 10.2 Bcf and it will be completed and tied back for production within the next two months

Egypt

Ar Rub No.1 

The Ar Rub No.1 exploration well has been drilled to test a deep Sidi Salim exploration play in the northern area of the South East El Mansoura concession. The well reached a total depth of 10,300 feet and open-hole logs suggest that two potential reservoir intervals were encountered within the target formation. The upper interval has an apparent net pay of 53 feet with an average porosity and water saturation of 21% and 35%, respectively, and the lower interval has 10 feet of net pay with a porosity and water saturation of 10% and 43%, respectively.

The potential reservoir intervals comprise a mixture of carbonates and sandstones which have not previously been tested on the concession and the wellbore conditions did not allow conclusive open-hole log data to be obtained. Therefore, the well is being prepared for testing to confirm whether the two zones will produce at commercial flow rates. Melrose's pre-drill unrisked reserves estimate for the prospect of 90 Bcfe is unchanged pending the well test results. 

Qantara No.4 Sidetrack 

The Qantara No.4 well has been sidetracked to determine whether production can be re-established from the shut-in Qantara field. The well reached a total depth of 10,454 feeand encountered a net pay interval of 11 feet with an average porosity and water saturation of 17% and 50%, respectively. The well has been cased prior to production testing.

  East Sindy No.1

 

The East Sindy No.1 exploration well has been drilled to test a shallow Sidi Salim prospect in the northern area of the South East El Mansoura concession. The well reached a total depth of 7,300 feet and, although it intersected a thick net sand interval of 400 feetit had no commercial hydrocarbon shows. The well has therefore been plugged and abandoned.

Future Drilling Plans

Following the completion of operations on the Ar Rub No.1 well, the EDC-54 drilling rig will move to the West Dikirnis field to sidetrack the West Dikirnis No.7 well and recomplete it as a high-capacity, horizontal oil production well. 

The EDC-9 rig will move from the Qantara field to drill the West Zahayra No.2 well in the El Mansoura concession. This well will appraise the up-dip area of the Qawasim discovery made by West Zahayra No.1 and will also test a deeper Sidi Salim exploration target which has unrisked reserves potential of 165 Bcfe with an estimated chance of success of 45%. 

The ECDC-1 rig will be used to drill the Ghizala No.1 well on a recently identified Sidi Salim prospect in the South East Mansoura concession. The prospect lies on trend with Ar Rub and the Tamad oil field which is currently producing 1,100 bopd.  Ghizala has unrisked reserves potential of 2 MMbbls of oil with an estimated chance of success of 26%.

Seismic Acquisition 

The seismic acquisition programme which commenced in March 2008 on the South East El Mansoura concession is progressing well. To date, 712 km of 2-D seismic data and 269 km² of 3-D seismic data have been acquired, with a further 486 km² of 3-D data still to be acquired.

The preliminary interpretation of the seismic data is encouraging and 1good quality leads and prospects have been identified in the Tertiary formations and a further 16 in the older Cretaceous and Jurassic formations. In light of these results, Melrose is considering extending the 3-D seismic survey area to cover more of the concession later this year. 

Commenting on the above, David Thomas, Chief Executive, said: 

"We are very pleased with the results from the Holmes No.4 well, which demonstrate that there is still significant untapped potential in this mature producing area. We are keen to pursue our exploration programme there later this year when we plan to drill two deep gas prospects. The Ar Rub No.1 well in Egypt also appears interesting and we look forward to flow testing the well over the next few weeks."

For further information please visit www.melroseresources.com or contact:

Melrose Resources plc

David Thomas, Chief Executive

Robert Adair, Executive Chairman

Munro Sutherland, Finance Director

0131 221 3360

Buchanan Communications 

Ben Willey

Nick Melson

0207 466 5000

  Glossary:

Bcf - billion cubic feet of gas 

Bcfe - billion cubic feet of gas equivalent 

bpd - barrels of oil or condensate per day

bopd - barrels of oil per day

boepd - barrels of oil equivalent per day 

MMbbls - million barrels of oil or condensate 

MMcfpd - million cubic feet per day

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKBKNABKDAOK
Date   Source Headline
29th Jan 20198:04 amRNSMRS Services Group Contract Win
18th Jan 20198:30 amRNSResult of AGM
17th Jan 20198:30 amRNSHalf Year Trading Update and Full Year Guidance
20th Dec 20181:14 pmRNSNotice of AGM
17th Dec 20187:00 amRNSBachmann Plant Hire Update
7th Dec 20189:31 amRNSFinal Results
21st Nov 20181:41 pmRNSNominated Adviser Status
16th Nov 20188:20 amRNSMRS secures the refurbishment of 6 excavators
18th Oct 20188:35 amRNSHolding(s) in Company
15th Oct 20189:20 amRNSTrading Update
12th Oct 20187:00 amRNSPaul Brenton Interview with Total Market Research
14th Sep 20187:52 amRNSBachmann Plant Hire secures AUD$2m works
31st Aug 20187:00 amRNSBachmann Plant Hire awarded $3m project with BMD
13th Aug 20188:25 amRNSHolding(s) in Company
26th Jul 20184:36 pmRNSHolding(s) in Company
24th Jul 20188:31 amRNSBachmann Plant Hire acquires Excavator
19th Jul 20189:37 amRNSHolding(s) in Company
19th Jul 20188:42 amRNSMRS Services Group acquires CAT D11T Bulldozer
18th Jul 20184:52 pmRNSHolding(s) in Company
16th Jul 20188:24 amRNSMRS Services Group - 3-year contract with Glencore
6th Jul 20183:38 pmRNSAccelerated Bookbuild
4th Jul 201810:20 amRNSHolding(s) in Company
25th Jun 20181:38 pmRNSAccelerated Bookbuild
22nd Jun 20185:06 pmRNSHolding(s) in Company
21st Jun 20181:52 pmRNSThree Year Contract
7th Jun 201811:08 amRNSHolding(s) in Company
1st Jun 201812:09 pmRNSHolding(s) in Company
23rd May 20187:00 amRNSGrant of Warrants and Options
9th May 20188:14 amRNSAcquisition of Engineering Maintenance Facility
20th Apr 201810:24 amRNSHolding(s) in Company
19th Apr 201811:15 amRNSHolding(s) in Company
3rd Apr 20187:00 amRNSDirector Retirement, Grant & Exercise of Warrants
12th Mar 20184:54 pmRNSGrant of Options
7th Mar 20182:43 pmRNSHolding(s) in Company
2nd Mar 201811:16 amRNSHolding(s) in Company
1st Mar 20187:00 amRNSExercise of Warrants
28th Feb 20187:00 amRNSHalf-year Report
21st Feb 20184:40 pmRNSSecond Price Monitoring Extn
21st Feb 20184:35 pmRNSPrice Monitoring Extension
26th Jan 20185:42 pmRNSHolding(s) in Company
26th Jan 201810:30 amRNSResult of AGM
24th Jan 20188:25 amRNSOperational Update
17th Jan 201812:38 pmRNSHolding(s) in Company
17th Jan 201812:37 pmRNSHolding(s) in Company
17th Jan 201812:36 pmRNSHolding(s) in Company
16th Jan 201810:27 amRNSHolding(s) in Company
12th Jan 20184:35 pmRNSPrice Monitoring Extension
8th Jan 20189:26 amRNSHolding(s) in Company
21st Dec 20173:51 pmRNSCEO Appointment, Director Retirement, Warrants
21st Dec 20173:14 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.