Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Drilling Update

3 Jul 2008 07:00

RNS Number : 1993Y
Melrose Resources PLC
03 July 2008
 



FOR IMMEDIATE RELEASE

3 July 2008

MELROSE RESOURCES PLC 

Exploration and Appraisal Drilling Update 

Melrose Resources plc (LSE:MRS) ("Melrose" or "the Company"), the oil and gas exploration, development and production company, today announces a successful appraisal well in the USA and provides an update on its exploration and appraisal programme in Egypt. 

USA 

In East Texas, the Holmes No.4 well has been successfully drilled to appraise the Van Reit formation at a location to the southwest of the main producing Holmes field. The well reached a total depth of 10,197 feet and encountered the top reservoir at 9,820 feet where strong gas shows were experienced whilst drilling. Open-hole logs confirmed the presence of a net gas pay interval of 29 feet with an average porosity and water saturation of 21% and 28%, respectively. The reservoir pressure indicates that the discovery area has not been depleted by production from the main field. 

The discovery is estimated to contain probable reserves of 10.2 Bcf and it will be completed and tied back for production within the next two months

Egypt

Ar Rub No.1 

The Ar Rub No.1 exploration well has been drilled to test a deep Sidi Salim exploration play in the northern area of the South East El Mansoura concession. The well reached a total depth of 10,300 feet and open-hole logs suggest that two potential reservoir intervals were encountered within the target formation. The upper interval has an apparent net pay of 53 feet with an average porosity and water saturation of 21% and 35%, respectively, and the lower interval has 10 feet of net pay with a porosity and water saturation of 10% and 43%, respectively.

The potential reservoir intervals comprise a mixture of carbonates and sandstones which have not previously been tested on the concession and the wellbore conditions did not allow conclusive open-hole log data to be obtained. Therefore, the well is being prepared for testing to confirm whether the two zones will produce at commercial flow rates. Melrose's pre-drill unrisked reserves estimate for the prospect of 90 Bcfe is unchanged pending the well test results. 

Qantara No.4 Sidetrack 

The Qantara No.4 well has been sidetracked to determine whether production can be re-established from the shut-in Qantara field. The well reached a total depth of 10,454 feeand encountered a net pay interval of 11 feet with an average porosity and water saturation of 17% and 50%, respectively. The well has been cased prior to production testing.

  East Sindy No.1

 

The East Sindy No.1 exploration well has been drilled to test a shallow Sidi Salim prospect in the northern area of the South East El Mansoura concession. The well reached a total depth of 7,300 feet and, although it intersected a thick net sand interval of 400 feetit had no commercial hydrocarbon shows. The well has therefore been plugged and abandoned.

Future Drilling Plans

Following the completion of operations on the Ar Rub No.1 well, the EDC-54 drilling rig will move to the West Dikirnis field to sidetrack the West Dikirnis No.7 well and recomplete it as a high-capacity, horizontal oil production well. 

The EDC-9 rig will move from the Qantara field to drill the West Zahayra No.2 well in the El Mansoura concession. This well will appraise the up-dip area of the Qawasim discovery made by West Zahayra No.1 and will also test a deeper Sidi Salim exploration target which has unrisked reserves potential of 165 Bcfe with an estimated chance of success of 45%. 

The ECDC-1 rig will be used to drill the Ghizala No.1 well on a recently identified Sidi Salim prospect in the South East Mansoura concession. The prospect lies on trend with Ar Rub and the Tamad oil field which is currently producing 1,100 bopd.  Ghizala has unrisked reserves potential of 2 MMbbls of oil with an estimated chance of success of 26%.

Seismic Acquisition 

The seismic acquisition programme which commenced in March 2008 on the South East El Mansoura concession is progressing well. To date, 712 km of 2-D seismic data and 269 km² of 3-D seismic data have been acquired, with a further 486 km² of 3-D data still to be acquired.

The preliminary interpretation of the seismic data is encouraging and 1good quality leads and prospects have been identified in the Tertiary formations and a further 16 in the older Cretaceous and Jurassic formations. In light of these results, Melrose is considering extending the 3-D seismic survey area to cover more of the concession later this year. 

Commenting on the above, David Thomas, Chief Executive, said: 

"We are very pleased with the results from the Holmes No.4 well, which demonstrate that there is still significant untapped potential in this mature producing area. We are keen to pursue our exploration programme there later this year when we plan to drill two deep gas prospects. The Ar Rub No.1 well in Egypt also appears interesting and we look forward to flow testing the well over the next few weeks."

For further information please visit www.melroseresources.com or contact:

Melrose Resources plc

David Thomas, Chief Executive

Robert Adair, Executive Chairman

Munro Sutherland, Finance Director

0131 221 3360

Buchanan Communications 

Ben Willey

Nick Melson

0207 466 5000

  Glossary:

Bcf - billion cubic feet of gas 

Bcfe - billion cubic feet of gas equivalent 

bpd - barrels of oil or condensate per day

bopd - barrels of oil per day

boepd - barrels of oil equivalent per day 

MMbbls - million barrels of oil or condensate 

MMcfpd - million cubic feet per day

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKBKNABKDAOK
Date   Source Headline
22nd Aug 201211:14 amRNSForm 8.5 (EPT/RI)
22nd Aug 201210:37 amRNSForm 8.3 - Melrose Resources Plc
22nd Aug 201210:14 amRNSForm 8.3 - Melrose Resources Plc
22nd Aug 20127:00 amRNSInterim Results 2012
21st Aug 201210:10 amRNSForm 8.3 - Melrose Resources Plc
20th Aug 20123:39 pmPRNForm 8.3 - Melrose Resources plc
20th Aug 20123:00 pmRNSForm 8.3 - Melrose Resources Plc
20th Aug 20122:56 pmRNSForm 8.3 - Melrose Resources plc
20th Aug 20121:47 pmRNSForm 8.3 - Melrose Resources plc
20th Aug 201211:08 amRNSForm 8.5 (EPT/RI)
17th Aug 20125:08 pmRNSForm 8.3 - Melrose Resources plc
17th Aug 201212:41 pmRNSForm 8.3 - Melrose Resources Plc
17th Aug 201210:42 amRNSForm 8.3 - Melrose Resources Plc
17th Aug 20127:01 amRNSPETROCELTIC OPENING DISCLOSURE IN MELROSE
17th Aug 20127:01 amRNSPETROCELTIC OPENING DISCLOSURE IN OWN SHARES
17th Aug 20127:01 amRNSPUBLIC OPENING POSITION DISCLOSURE
17th Aug 20127:00 amRNSRECOMMENDED MERGER OF MELROSE AND PETROCELTIC
25th Jul 20127:00 amRNSNotice of Half-Yearly Results
11th Jul 20122:54 pmRNSBlock Listing Return
9th Jul 20127:00 amRNSOperational Update
7th Jun 20122:27 pmRNSResults of Annual General Meeting
29th May 20124:31 pmRNSDirector/PDMR Shareholding
17th May 20127:00 amRNSInterim Management Statement
10th May 20124:40 pmRNSNotice of AGM
12th Apr 20129:06 amRNSDirector/PDMR shareholding
3rd Apr 20122:09 pmRNSDirector/PDMR Shareholding
28th Mar 20127:00 amRNSAnnual Results for the year ended 31 December 2011
22nd Mar 20127:00 amRNSRomanian Offshore Muridava Concession Farm-out
17th Feb 20127:00 amRNS2011 Production and Year End Reserves Report
17th Jan 20125:05 pmRNSNotification of Major Interest in Shares
6th Jan 20127:00 amRNSBulgarian Gas Sales Contracts Update
4th Jan 20123:50 pmRNSHoldings in Company
4th Jan 20129:27 amRNSBlock Listing Return
4th Jan 20129:24 amRNSAnnual Information Update
16th Dec 20117:00 amRNS2012 Production Outlook
6th Dec 20117:00 amRNSDivestment of assets located in South East Texas
18th Nov 20117:00 amRNSInterim Management Statement
4th Nov 20117:00 amRNSOperations Update
14th Sep 20113:00 pmRNSHalf Yearly Report 2011
17th Aug 20117:00 amRNSInterim Results
12th Aug 20117:00 amRNSBulgarian Exploration Update
21st Jul 20117:00 amRNSExploration Update
12th Jul 20117:00 amRNSNotice of Half Year Results
7th Jul 20112:46 pmRNSBlock Listing Return
1st Jul 201110:08 amRNSDirector's Share Purchase
17th Jun 20117:00 amRNSDirectors' Share Purchase
9th Jun 20113:00 pmRNSResults of Annual General Meeting
20th May 20117:00 amRNSInterim Management Statement
11th May 20114:05 pmRNSNotice of AGM
6th May 20117:00 amRNSOperations and Production Forecast Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.