If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksManagement Resource Solutions Regulatory News (MRS)

  • There is currently no data for MRS

Drilling Update

3 Jul 2008 07:00

RNS Number : 1993Y
Melrose Resources PLC
03 July 2008
 



FOR IMMEDIATE RELEASE

3 July 2008

MELROSE RESOURCES PLC 

Exploration and Appraisal Drilling Update 

Melrose Resources plc (LSE:MRS) ("Melrose" or "the Company"), the oil and gas exploration, development and production company, today announces a successful appraisal well in the USA and provides an update on its exploration and appraisal programme in Egypt. 

USA 

In East Texas, the Holmes No.4 well has been successfully drilled to appraise the Van Reit formation at a location to the southwest of the main producing Holmes field. The well reached a total depth of 10,197 feet and encountered the top reservoir at 9,820 feet where strong gas shows were experienced whilst drilling. Open-hole logs confirmed the presence of a net gas pay interval of 29 feet with an average porosity and water saturation of 21% and 28%, respectively. The reservoir pressure indicates that the discovery area has not been depleted by production from the main field. 

The discovery is estimated to contain probable reserves of 10.2 Bcf and it will be completed and tied back for production within the next two months

Egypt

Ar Rub No.1 

The Ar Rub No.1 exploration well has been drilled to test a deep Sidi Salim exploration play in the northern area of the South East El Mansoura concession. The well reached a total depth of 10,300 feet and open-hole logs suggest that two potential reservoir intervals were encountered within the target formation. The upper interval has an apparent net pay of 53 feet with an average porosity and water saturation of 21% and 35%, respectively, and the lower interval has 10 feet of net pay with a porosity and water saturation of 10% and 43%, respectively.

The potential reservoir intervals comprise a mixture of carbonates and sandstones which have not previously been tested on the concession and the wellbore conditions did not allow conclusive open-hole log data to be obtained. Therefore, the well is being prepared for testing to confirm whether the two zones will produce at commercial flow rates. Melrose's pre-drill unrisked reserves estimate for the prospect of 90 Bcfe is unchanged pending the well test results. 

Qantara No.4 Sidetrack 

The Qantara No.4 well has been sidetracked to determine whether production can be re-established from the shut-in Qantara field. The well reached a total depth of 10,454 feeand encountered a net pay interval of 11 feet with an average porosity and water saturation of 17% and 50%, respectively. The well has been cased prior to production testing.

  East Sindy No.1

 

The East Sindy No.1 exploration well has been drilled to test a shallow Sidi Salim prospect in the northern area of the South East El Mansoura concession. The well reached a total depth of 7,300 feet and, although it intersected a thick net sand interval of 400 feetit had no commercial hydrocarbon shows. The well has therefore been plugged and abandoned.

Future Drilling Plans

Following the completion of operations on the Ar Rub No.1 well, the EDC-54 drilling rig will move to the West Dikirnis field to sidetrack the West Dikirnis No.7 well and recomplete it as a high-capacity, horizontal oil production well. 

The EDC-9 rig will move from the Qantara field to drill the West Zahayra No.2 well in the El Mansoura concession. This well will appraise the up-dip area of the Qawasim discovery made by West Zahayra No.1 and will also test a deeper Sidi Salim exploration target which has unrisked reserves potential of 165 Bcfe with an estimated chance of success of 45%. 

The ECDC-1 rig will be used to drill the Ghizala No.1 well on a recently identified Sidi Salim prospect in the South East Mansoura concession. The prospect lies on trend with Ar Rub and the Tamad oil field which is currently producing 1,100 bopd.  Ghizala has unrisked reserves potential of 2 MMbbls of oil with an estimated chance of success of 26%.

Seismic Acquisition 

The seismic acquisition programme which commenced in March 2008 on the South East El Mansoura concession is progressing well. To date, 712 km of 2-D seismic data and 269 km² of 3-D seismic data have been acquired, with a further 486 km² of 3-D data still to be acquired.

The preliminary interpretation of the seismic data is encouraging and 1good quality leads and prospects have been identified in the Tertiary formations and a further 16 in the older Cretaceous and Jurassic formations. In light of these results, Melrose is considering extending the 3-D seismic survey area to cover more of the concession later this year. 

Commenting on the above, David Thomas, Chief Executive, said: 

"We are very pleased with the results from the Holmes No.4 well, which demonstrate that there is still significant untapped potential in this mature producing area. We are keen to pursue our exploration programme there later this year when we plan to drill two deep gas prospects. The Ar Rub No.1 well in Egypt also appears interesting and we look forward to flow testing the well over the next few weeks."

For further information please visit www.melroseresources.com or contact:

Melrose Resources plc

David Thomas, Chief Executive

Robert Adair, Executive Chairman

Munro Sutherland, Finance Director

0131 221 3360

Buchanan Communications 

Ben Willey

Nick Melson

0207 466 5000

  Glossary:

Bcf - billion cubic feet of gas 

Bcfe - billion cubic feet of gas equivalent 

bpd - barrels of oil or condensate per day

bopd - barrels of oil per day

boepd - barrels of oil equivalent per day 

MMbbls - million barrels of oil or condensate 

MMcfpd - million cubic feet per day

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKBKNABKDAOK
Date   Source Headline
20th May 20083:36 pmRNSArticles of Association
15th May 200812:14 pmRNSAnnual Report and Accounts
13th May 20088:30 amRNSInterim Management Statement
24th Apr 200811:04 amRNSOperations Update
11th Apr 20083:20 pmRNSDirector/PDMR Shareholding
31st Mar 20089:56 amRNSDirector/PDMR Shareholding
31st Mar 20089:35 amRNSTotal Voting Rights
27th Mar 20083:21 pmRNSBlock Listing Return
27th Mar 20083:13 pmRNSMajor Interests in Shares
27th Mar 200810:33 amRNSDirector/PDMR Shareholding
25th Mar 200811:30 amRNSTR-1-Notification of Interest
18th Mar 20087:01 amRNSPreliminary Results
25th Feb 200810:15 amRNSAnalyst Site Visit
19th Feb 200811:30 amRNSNotice of Results
19th Feb 20089:30 amRNS2007 Production Report
31st Jan 20084:40 pmRNSSecond Price Monitoring Extn
31st Jan 20084:35 pmRNSPrice Monitoring Extension
21st Jan 20087:01 amRNSDrilling Update
18th Jan 20084:40 pmRNSSecond Price Monitoring Extn
18th Jan 20084:35 pmRNSPrice Monitoring Extension
17th Jan 200811:19 amRNSEgypt Update
14th Jan 20084:25 pmRNSAnnual Information Update
4th Jan 200811:15 amRNSUnited States Update
7th Dec 200711:19 amRNSDirector's Shareholding
7th Dec 200711:16 amRNSBulgaria Update
4th Dec 20074:35 pmRNSPrice Monitoring Extension
30th Nov 200710:59 amRNSOperations Update
28th Nov 200710:20 amRNSIndependent Non Exec Director
13th Nov 20073:01 pmRNSDirectorate Change
8th Nov 20074:40 pmRNSSecond Price Monitoring Extn
8th Nov 20074:35 pmRNSPrice Monitoring Extension
7th Nov 20079:55 amRNSBulgarian Operations Update
2nd Nov 200711:00 amRNSBond Offering Update
18th Oct 200710:22 amRNSE250m Bond Offering
10th Oct 20077:01 amRNSOperations Update
21st Sep 20077:01 amRNSInterim Report
4th Sep 200711:03 amRNSHolding(s) in Company
3rd Sep 20074:35 pmRNSDirector/PDMR Shareholding
30th Aug 20071:51 pmRNSHolding(s) in Company
29th Aug 20077:00 amRNSInterim results
24th Aug 20072:58 pmRNSChange of Company Secretary
24th Aug 20072:21 pmRNSChange of Company Sectretary
9th Aug 20079:30 amRNSNotice of Results
8th Aug 200711:57 amRNSDirectors' Share Plan
12th Jul 20073:42 pmRNSDirector's Shareholding
12th Jul 20073:42 pmRNSBlock Listing Return
11th Jul 200711:00 amRNSEgypt Drilling Update
28th Jun 20075:04 pmRNSDirectors' Shareholdings
28th Jun 20071:28 pmRNSPerformance Share Plan
21st Jun 200710:31 amRNSDirectors' Shareholdings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.