Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMetminco Regulatory News (MNC)

  • There is currently no data for MNC

Resource Update

26 Apr 2012 07:00

RNS Number : 0902C
Metminco Limited
26 April 2012
Β 

ο»Ώ

ASX Release

Β 

Los Calatos Resource increased by 170% to 9.4 million tonnes contained copper

Β 

To view the entire press release including images please download the following PDF document.

Β 

http://www.rns-pdf.londonstockexchange.com/rns/0902C_-2012-4-25.pdf

Β 

Β·; SRK Consulting (Chile) S.A. complete interim resource estimate for Los Calatos

Β·; Cu-Mo resource tonnage increases by 150% from 0.926 to 2.32 billion tonnes

Β·; Copper grade improves from 0.37% to 0.40%

Β·; Eight-fold increase in Indicated Mineral Resource category to 885 million tonnes

Β·; Mineralisation remains open at depth

Β·; Phase 4 infill drilling program (100,000m) to be completed by the end of 2012

Β 

Β 

Β 

Key results - interim resource estimate

Β 

Indicated Mineral Resource of 885 million tonnes at 0.42% Cu and 0.027% Mo (3.7 million tonnes and 0.24 million tonnes metal respectively).

Β 

Inferred Mineral Resource of 1,432 million tonnes at 0.40% Cu and 0.018% Mo (5.7 million tonnes and 0.26 million tonnes metal respectively).

Β 

Total contained Cu and Mo metal is 9.4 million tonnes and 0.50 million tonnes respectively.

Β 

Further infill drilling to upgrade resource is currently in progress.

Β 

Significant drill hole results (Phase 4a)

Β 

BHID

Mineralised Intercept

Depth Interval

CD-57

115m at 0.44% Cu & 634ppm Mo

and

1,015m at 0.51% Cu & 233ppm Mo

711 to 826m

Β 

879 to 1,894m

CD-61

309m at 0.97% Cu & 1,052ppm Mo

878 to 1,187m

Β 

Note: CD-61 not included in the resource model due to timing

Β 

Β 

Β 

Introduction

With the completion of the Company's Phase 4a drilling program at the Los Calatos Project, Metminco Limited ("Metminco" or the "Company") commissioned SRK Consulting, Chile S.A. ("SRK") to model, and calculate, an interim mineral resource estimate for its 100% owned copper - molybdenum project in southern Peru.

The new resource model incorporates the drilling results from 113 drill holes totalling 90,403Β metres, of which 31,550 metres were used in estimating the mineral resource associated with the Los Calatos mineralised envelope.

Review of resource estimate

The mineral resource statement for the Los Calatos copper-molybdenum deposit has been reported at a 0.2% Cu cut-off grade, and categorised into Indicated and Inferred Mineral Resources in accordance with the JORC standards for Reporting Mineral Resources and Mineral Reserves (see Table 1 below).

Β 

Table 1: Mineral Resource Statement for the Los Calatos Copper-Molybdenum Project, Arequipa, Peru, SRK Consulting (Chile) S.A., April 19, 2012.

Β 

Resource Classification

Tonnage

(Kilotonnes)

Cu

(%)

Mo

(%)

Measured

-

-

-

Indicated

884,608

0.42

0.027

Total Measured and Indicated

884,608

0.42

0.027

Total Inferred

1,431,556

0.40

0.018

Β 

Note:

i) Mineral Resource reported at a 0.2% Cu cut-off

Β 

Further, and based on Table 1 above, the contained metal by resource category is summarised in Table 2 below.

Β 

Table 2: Summary of metal content by resource category (based on the 0.2% Cu cut-off from Table 3, Appendix 1).

Β 

Resource Classification

Tonnage

(Kilotonnes)

Cu

(Mt)

Mo

(Kt)

Contained Metal

(%)

Indicated

884,608

3.7

239

48%

Inferred

1,431,556

5.7

258

52%

Total Indicated and Inferred

2,316,164

9.4

497

100%

Β 

Note:

i) Rounding-off of figures may result in minor computational discrepancies, where this happens, it is not deemed significant

Appendix 1 provides more detailed information on the grade-tonnage profile for the Mineral Resource, sensitivities to various cut-off grades, a graphic of the Block Model and a summary of the parameters used to derive the estimate. Also contained in Appendix 1 is a comparison between key aspects of the July 2010 and April 2012 Mineral Resource statements.

Β 

Drilling results post resource update

Table 2, included under Appendix 1, summarises the drilling results for the Los Calatos Phase 4a program. All of these drill holes have been included in the latest resource estimate, apart from drill hole CD-61, which returned the following significant results:

CD-61

933 metres at 0.51% Cu and 407 ppm Mo

767 to 1,700m

including

309 metres at 0.97% Cu and 1,052 ppm Mo

878 to 1,187m

Β 

Proposed work program

The Phase 4b drilling program, which includes an additional 70,000 metres of infill drilling, has commenced. The program, which is focused primarily on upgrading the current resource categories, is to be completed by the calendar year-end. Eight drilling rigs are presently operating in the field.

A further Mineral Resource estimate, reported in accordance with the JORC Code (2004), will be undertaken at the end of the year, on completion of the Phase 4b drilling program. This resource update will be followed by the commissioning of a pre-feasibility study in early 2013.

An internal mining study has been initiated aimed at identifying the main requirements of the pre-feasibility study. This will address aspects such as the planned seawater pipeline to the coast (and associated loading facility), access to the regional power grid, quantification of the metallurgical testwork required to evaluate the use of sea water for flotation purposes (and refine recoveries), and the assessment of different mining options.

Β 

Company Background

Metminco is a dual ASX and AIM listed company with a portfolio of copper, molybdenum and gold projects in Peru and Chile.

The Los Calatos project, located in southern Peru, has a Mineral Resource of 2,316 million tonnes, comprising an Indicated Resource of 885 million tonnes at 0.42% Cu and 270 ppm Mo, and an Inferred Resource of 1,431 million tonnes at 0.40% Cu and 180 ppm Mo (at a 0.2% copper cut-off).

The Chilean assets include the Mollacas copper leach project with a Mineral Resource of 17Β million tonnes consisting of an Indicated Resource of 7.2 million tonnes at 0.56% copper, and an Inferred Resource of 9.8 million tonnes at 0.52% copper (at a 0.2% copper cut-off); and the Vallecillo gold zinc project with a Mineral Resource of 10.1 million tonnes consisting of an Indicated Resource of 7.9 million tonnes at 1.14g/t Au; 11.4g/t Ag; 1.32% Zn; 0.29% Pb and an Inferred Resource of 2.2 million tonnes at 0.78g/tΒ Au; 8.2g/t Ag; 0.58% Zn; 0.26% Pb (at a cut-off grade of 0.3g/t Au).

The Company also has a number of early stage exploration projects where initial exploration activities have identified anomalous copper, molybdenum and gold values.

Β 

William Howe

Managing Director

Β 

Competent Person's Statement

Β 

Metminco

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Colin Sinclair, BSc, MSc, who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of the Company as Executive General Manager.

Colin Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralisation, type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results'. Mr Sinclair, as Competent Person for this announcement, has consented to the inclusion of the information in the form and context in which it appears herein.

Β 

SRK Consulting (Chile) S.A.

Metminco supplied SRK with a geological model and the drill data. Copper and molybdenum grades were estimated into a block model using ordinary kriging with GEMCOM software.

The information provided in this ASX Release as it relates to Exploration Results and Mineral Resources of the Los Calatos copper-molybdenum deposit is based on information compiled by George G. Even, Principal Geologist of SRK Consulting in Santiago, Chile. Mr Even, a Qualified Person for JORC compliant statements, reviewed the technical information presented in this document. Mr Ernesto Jaramillo, Principal Resource Geologist with SRK Santiago, performed the resource estimation. Mr Even has sufficient experience that is relevant to the style of mineralisation and type of mineral deposit under consideration, and to the activity which was undertaken, to make the statements found in this report in the form and context in which they appear.

Mr Even and Mr Jaramillo have consented to be named in this announcement, and have approved of the inclusion of the information attributed to them in the form and context in which it appears herein.

Β 

Β 

APPENDIX 1

Summary of Results

Table 3: Sensitivity of the Los Calatos Mineral Resource to the copper cut-off grade.

Β 

Cut-off

Indicated

Inferred

Total

Tonnage (Kton)

Cu (%)

Mo (%)

Tonnage (Kton)

Cu (%)

Mo (%)

Tonnage (Kton)

Cu (%)

Mo (%)

1.00

15,151

1.26

0.061

9,206

1.18

0.021

24,358

1.23

0.046

0.95

19,801

1.19

0.059

12,501

1.13

0.021

32,302

1.17

0.044

0.90

26,150

1.13

0.056

18,438

1.06

0.021

44,588

1.10

0.042

0.85

34,032

1.07

0.054

25,673

1.01

0.020

59,705

1.04

0.039

0.80

42,803

1.02

0.052

38,549

0.95

0.020

81,352

0.98

0.037

0.75

56,530

0.96

0.049

50,174

0.91

0.021

106,704

0.93

0.036

0.70

74,652

0.90

0.048

69,516

0.86

0.023

144,168

0.88

0.036

0.65

97,983

0.85

0.047

96,580

0.80

0.024

194,563

0.83

0.036

0.60

126,598

0.80

0.045

140,931

0.75

0.027

267,529

0.77

0.036

0.55

166,542

0.74

0.044

211,008

0.69

0.029

377,549

0.71

0.035

0.50

217,615

0.69

0.042

292,356

0.64

0.028

509,971

0.66

0.034

0.45

283,215

0.64

0.041

412,024

0.59

0.027

695,240

0.61

0.033

0.40

365,033

0.59

0.039

551,301

0.55

0.025

916,334

0.57

0.031

0.35

469,176

0.54

0.036

744,183

0.51

0.024

1,213,359

0.52

0.028

0.30

594,614

0.50

0.033

967,584

0.46

0.022

1,562,198

0.48

0.026

0.25

731,995

0.46

0.030

1,220,954

0.43

0.019

1,952,949

0.44

0.023

0.20

884,608

0.42

0.027

1,431,556

0.40

0.018

2,316,164

0.40

0.021

0.15

1,020,734

0.38

0.025

1,642,684

0.37

0.016

2,663,418

0.37

0.019

0.10

1,100,729

0.37

0.023

1,782,029

0.35

0.015

2,882,758

0.36

0.018

0.05

1,111,809

0.36

0.023

1,886,417

0.33

0.014

2,998,225

0.34

0.017

0.00

1,116,276

0.36

0.023

1,890,465

0.33

0.014

3,006,741

0.34

0.017

Β 

Β 

Β 

Figure 1: Total (Indicated & Inferred) Resource Grade - Tonnage Curve for Cu %.

(Please follow the PDF link at the top of the page)

Β 

Figure 2: Los Calatos Block Model - Copper Grades (25m x 15m x 20m blocks).

Β 

(Please follow the PDF link at the top of the page)

Β 

Figure 3: Los Calatos Block Model Plan - Grade (%) * thickness (m) contours with Phase 4a drill holes.

(Please follow the PDF link at the top of the page)

Β 

Figure 4: Northeast - southwest section though drill hole CD-61 showing high grade intercept

(Please follow the PDF link at the top of the page)

Β 

Figure 5: Mineralised Envelope - Los Calatos Porphyry System.

(Please follow the PDF link at the top of the page)

Β 

Figure 6: Comparison - July 2010 and April 2012 Mineral Resource estimates.

(Please follow the PDF link at the top of the page)

Β 

Table 4: Los Calatos - Phase 4a Drilling Results.

Β 

Β 

CD-50

286415

8130424

2978

39

-63

993.3

183

855

672

0.28

217

CD-51

286941

8130464

2916

205

-60

918

383

587

204

0.32

295

CD-52

287111

8130240

2936

238

-69

674.5

318

415

97

0.42

9

CD-53

286312

8130086

3047

31

-64.5

1976.4

670

1089

419

0.42

223

includes

905

1039

134

0.69

293

1163

1323

160

0.15

21

1371

1634

263

0.39

161

1682

1780

98

0.16

80

CD-54

286502

8130076

3020

23

-70

1577.35

482

836

354

0.25

165

853

921

68

0.23

292

933

957

24

0.30

142

974

1013

39

0.36

129

1213

1279

66

0.26

7

1351

1390

39

0.12

11

1506

1572

66

0.21

78

CD-55

287415

8130772

2924

207

-59

1588.25

762

816

54

0.47

51

830

998

168

0.36

18

1125

1154

29

0.13

101

1240

1435

195

0.26

55

CD-56

287331

8130859

2951

216

-64.5

2003.9

980

1270

290

0.80

184

includes

990

1102

112

1.14

244

1289

1385

96

0.47

151

1401

1734

333

0.43

494

includes

1672

1732

60

0.75

627

1772

2004

232

0.55

146

includes

1809

1843

34

1.02

151

CD-57

286733

8131226

3041

201

-72

1894.8

711

826

115

0.44

634

850

870

20

0.37

440

879

1894

1015

0.51

233

includes

1197

1282

85

1.05

221

CD-58

286423

8131111

2983

206.5

-64

1263.2

870

1263

393

0.26

155

Β 

Β 

Β 

Β 

Table 5: Los Calatos - Phase 4a Drilling Results (cont'd)

Β 

CD-59

286429

8130214

2997

31.5

-61

1277.9

413

601

188

0.20

116

700

1002

302

0.17

145

1014

1194

180

0.22

99

CD-60

287001

8130475

2921

221.5

-65.5

997.35

70

103

33

0.17

4

542

819

277

0.24

146

912

955

43

0.13

12

CD-61

286842

8131190

3062

204.5

-63

1753.35

767

1700

933

0.51

407

includes

878

1187

309

0.97

1,052

CD-62

287298

8130550

2913

212.5

-60.5

1195.05

Β 

Note: Results for CD-62 still awaited.

Β 

Β 

Β 

Β 

Table 6: Modelling parameters - Interim Resource estimate.

Β 

a) Drill holes

Phase

Hole Type

Number of Holes

Drilled Metres

Number of Samples

Drill Holes

1

DDH

13

6,385

6,156

CD-1 to CD-13

2

DDH

11

10,004

9,458

CD-14 to CD-23

3

DDH

26

33,326

27,110

CD-24 to CD-48

4

DDH

24

32,366

13,926

CD-49 to CD-71

Barrick

RC

26

4,189

2,095

Phelps Dodge

DDH

13

4,133

1,897

Total

113

90,403

60,642

Β 

b) Section Spacing and Composites

Drill section interpretation spacing

50m

Interpreted mineralised domain volume

1,280,257,500 m3

Sample composite length

5m

Number of composites used

6,315

Β 

c) Descriptive statistics - mineral assays

(Please follow the PDF link at the top of the page)

Β 

d) Geostatistical analysis - Variography

(Please follow the PDF link at the top of the page)

Β 

Assay

Nugget Effect

1VS Model

1 VS Sill

1 VS Range

2 VS Model

2VS Sill

2 VS Range

Cu 5m Composites

0.035

SPH

0.039

42

EXP

0.08800

200

Mo 5m Composites

0.0002

SPH

0.0005

28.3

SPH

0.00104

149.1

Β 

Β 

e) Block Model Parameters

Block Model

Min

Max

Size

Northing (local co-ordinates)

10,250

11,750

15

Easting (local co-ordinates)

9,000

11,750

25

Elevation (m)

1,000

3,500

20

Β 

f) Estimation Methodology - Ordinary Kriging

Description

Run 1

Run 2

Cu

Mo

Cu

Mo

Min samples to estimate a block

3

3

3

3

Max samples to estimate a block

15

15

30

30

Discretization (x,y,z)

5x3x4

5x3x4

5x3x4

5x3x4

High grade transition value (%)

2

0.3

2

0.3

High grade range

East (m)

100

100

300

300

North (m)

35

35

100

100

Elevation (m)

100

100

300

300

Search Radii (m)

East (m)

200

200

600

600

North (m)

70

70

200

200

Elevation (m)

200

200

600

600

High grade outlier capping (%)

6

0.3

6

0.3

Maximum samples per drill hole

10

10

10

10

Β 

g) Resource Category Parameters

Β 

Indicated Mineral Resource

Β·; Portion of block must be contained within the interpreted solid

Β·; Block must be in Kriging Pass 1

Β·; Block must be estimated on at least 2 drill holes

Β·; Anisotropic average distance of samples used to estimate the block must be less or equal to 150 metres

Inferred Mineral Resource

Β·; Portion of block must be contained within the interpreted solid

Β·; Portion of block must not be Indicated

Β·; Anisotropic average distance of samples used to estimate the block must be less than or equal to 400 metres

Β 

Β 

Β 

Β 

Β 

Metminco Limited

ABN 43 119 759 349

Β 

Corporate Details

ASX Code: MNC.AX

AIM Code: MNC.L

Β 

Issued capital

1.749.5m Ord. shares

69.2m Options

Β 

Directors

Chairman

Antonio Ortuzar

Managing Director

William Howe

Non-Executive Directors

Β Francisco Vergara

Bill Etheridge

Phillip Wing

Tim Read

Β 

Β 

Company Secretary & CFO

Philip Killen

Β 

Contact Details

Level 6

122 Walker Street

North Sydney

NSW

2060

Australia

Tel: +61 (0) 2 9460 1856

Fax: +61 (0) 2 9460 1857

Β 

Email

steve.tainton@metminco.com.au

Β 

Website

www.metminco.com.au

Β 

Brokers

Canaccord BGF (Australia)

Warwick Grigor / Marcus Freeman

+61 3 8688 9100

Β 

Canaccord Genuity (UK)

Robert Finlay / Andrew Chubb

+44 (0) 20 7523 8000

Β 

Liberum (UK)

Michael Rawlinson / Clayton Bush

+44 (0) 20 3100 2227

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCUVOBRUSASUAR
Date   Source Headline
31st Mar 20157:01 amRNSAppendix 3Y
31st Mar 20157:00 amRNSNotification of director dealings
30th Mar 20157:16 amRNSCleansing Notice
30th Mar 20157:04 amRNSIssue and Allotment of Ordinary Shares
30th Mar 20157:03 amRNSAppendix 3B
26th Mar 20157:00 amRNSLos Calatos Project Update
25th Mar 20157:00 amRNSResults of EGM
11th Mar 20157:42 amRNSAnnual report for year ended 31 December 2014
20th Feb 20157:45 amRNSNotice of EGM
20th Feb 20157:28 amRNSCleansing notice
20th Feb 20157:25 amRNSAppendix 3B
20th Feb 20157:22 amRNSIssue and allotment of shares
18th Feb 20159:49 amRNSPlacement and Rights Issue
2nd Feb 20157:01 amRNSAPPENDIX 5B
2nd Feb 20157:00 amRNSQUARTERLY ACTIVITIES REPORT
16th Dec 20148:41 amRNSAppendix 3B
16th Dec 20148:40 amRNSNOTIFICATION OF EXPIRY OF OPTIONS
15th Dec 20147:01 amRNSTransfer of Director's Shareholding
9th Dec 20147:26 amRNSTRANSFER OF DIRECTOR'S SHAREHOLDING
17th Nov 20147:00 amRNSAppendix 3Y
17th Nov 20147:00 amRNSIncrease in Directors Shareholding
11th Nov 20147:00 amRNSIssue and Allotment of Ordinary Shares
3rd Nov 20147:00 amRNSAppendix 5B
3rd Nov 20147:00 amRNSQuarterly Activities Report
27th Oct 20147:00 amRNSReservation Of Surface Title
22nd Oct 20147:00 amRNSCHANGE OF ADVISOR
30th Sep 20148:37 amRNSIssue and Allotment of Ordinary Shares
8th Sep 20147:00 amRNSHalf Year Report Ended 30 June 2014
29th Aug 20145:41 pmRNSIssue and Allotment of Ordinary Shares
7th Aug 20147:00 amRNSMollacas Servidumbre Update
1st Aug 20147:02 amRNSAIM Application
1st Aug 20147:00 amRNSCleansing Notice
1st Aug 20147:00 amRNSIssue and Allotment of Ordinary Shares
1st Aug 20147:00 amRNSQUARTERLY ACTIVITIES REPORT & APPENDIX 5B
1st Aug 20147:00 amRNSAppendix 5B
1st Aug 20147:00 amRNSAppendix 3B
7th Jul 20147:32 amRNSAustralian Securities Exchange - Share Price Query
1st Jul 20147:00 amRNSUPDATE ON MOLLACAS ACCESS RIGHTS
6th Jun 20147:00 amRNSMetminco Investor Presentation
29th May 20148:43 amRNSRESULTS OF ANNUAL GENERAL MEETING
9th May 20147:02 amRNSShare Price Query
1st May 20147:00 amRNSAppendix 5B
1st May 20147:00 amRNSQUARTERLY ACTIVITIES REPORT
29th Apr 201410:46 amRNSAnnual Results and Notice of AGM
4th Apr 20144:40 pmRNSSecond Price Monitoring Extn
4th Apr 20144:35 pmRNSPrice Monitoring Extension
28th Mar 20147:01 amRNSMollacas Ruling on Access Rights
19th Mar 20147:00 amRNSMOLLACAS COPPER PROJECT
13th Mar 20147:00 amRNSANNUAL REPORT FOR THE YEAR ENDED 31 DECEMBER 2013
3rd Feb 20147:00 amRNSAppendix 5B

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.