Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.05
Bid: 3.00
Ask: 3.10
Change: 0.00 (0.00%)
Spread: 0.10 (3.333%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 3.05
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Spud of Red Deer and Operational Update

5 Aug 2019 07:00

RNS Number : 8668H
Petro Matad Limited
05 August 2019
 

THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED BY PETRO MATAD LIMITED TO CONSTITUTE INSIDE INFORMATION AS STIPULATED UNDER THE MARKET ABUSE REGULATION (EU) NO. 596/2014 ("MAR"). ON THE PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE ("RIS"), THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

5 August 2019

Petro Matad Limited

 

Spud of the Red Deer-1 Exploration Well and Heron-1 Well update

 

 

Petro Matad Limited ("Petro Matad" or "the Company"), the AIM quoted Mongolian oil explorer, announces that the Red Deer-1 exploration well in the Asgat Sag Basin of Block XX in eastern Mongolia spudded on 4 August. The well is being drilled with the Daton Petroleum Engineering and Oilfield Service LLC rig, DXZ1.

The Red Deer-1 well is targeting a prospect with 48MMbo of Mean Prospective Recoverable Resource and is planned to be drilled to a total depth (TD) of 2,100 metres. The well is expected to take up to 35 days to complete. In the event of a discovery, the Company will bring in a separate rig for testing. A call-off testing contract has been signed which ensures testing operations, if warranted, can commence soon after discovery.

Meanwhile, at Heron-1, the first casing point at 551 metres was reached on schedule and casing has been run and cemented. The DQE rig 40105 is now ready to drill out cement and then drill 8 ½ inch hole to the prognosed TD of 3,050 metres. However, the provincial government has challenged Petro Matad's legal right to use the land at Heron-1 on the basis that a tripartite agreement between two central government agencies and the province has not been executed. In all of Petro Matad's operations the Company has followed the land permitting regulations as required under the PSC and in accordance with instructions from the Ministry of Mining and the industry regulator MRPAM. The absence of a tripartite land use agreement between government agencies has never previously been an issue. We are working with the Ministry, MRPAM and the provincial government to remedy this situation as soon as possible.

The rig at Heron-1 has been put on standby whilst the situation is resolved. All efforts are currently directed at fixing this interruption as quickly as possible in order to minimise rig standby costs. Daily standby costs are low by industry standards and are of the order of $12,000. The Red Deer-1 well is located in a different province to that in which Heron-1 is located and has not been affected.

 

Further updates will be provided in due course.

 

Further information please contact:

 

Petro Matad Limited

 

Mike Buck, CEO

+976 7014 1099 / +976 7575 1099

 

 

Shore Capital (Nominated Adviser and Broker)

Richard Johnson

Andy Crossley

David Coaten

+44 (0) 20 7408 4090

 

Stifel Nicolaus Europe Limited (Broker)

 

Callum Stewart

Nicholas Rhodes

Ashton Clanfield

+44 (0) 20 7710 7600

 

FTI Consulting (Communications Advisory Firm)

Sara Powell

Ben Brewerton

Genevieve Ryan

+44 (0) 20 3727 1000

 All Reserves and Resources definitions and estimates shown in this report are based on the SPE/AAPG/WPC/SPEE Petroleum Resource Management System ("PRMS").

Technical information in this news release has been reviewed by the Company's Exploration Manager, Mr. Jerry Smart. He has 37 years of industry experience in oil and gas exploration and production with LASMO, Eni, Salamander Energy and Ophir Energy. He holds a B.Sc. in Geology from King's College, London.

Glossary

 

 

MMbo Million barrels of oil

Mean The arithmetic average of the low, mid and high case estimates of recoverable prospective resources

Prospective Resources Estimated volumes associated with undiscovered accumulations. These represent quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from oil and gas deposits identified on the basis of indirect evidence but which have not yet been drilled

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds 100% working interest and the operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,367 square kilometres in the far eastern part of the country and Blocks IV and V have an area of 29,062 square kilometres and 21,143 square kilometres, respectively, in the central western part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLIFSETRIEIIA
Date   Source Headline
9th Sep 20199:05 amRNSSecond Price Monitoring Extn
9th Sep 20199:00 amRNSPrice Monitoring Extension
9th Sep 20197:00 amRNSHeron-1, results of drilling and wireline logging
3rd Sep 20199:05 amRNSSecond Price Monitoring Extn
3rd Sep 20199:00 amRNSPrice Monitoring Extension
3rd Sep 20197:00 amRNSHalf-year Report
2nd Sep 20192:05 pmRNSSecond Price Monitoring Extn
2nd Sep 20192:00 pmRNSPrice Monitoring Extension
29th Aug 20194:41 pmRNSSecond Price Monitoring Extn
29th Aug 20194:35 pmRNSPrice Monitoring Extension
20th Aug 20197:00 amRNSOperational Update
14th Aug 20199:06 amRNSSecond Price Monitoring Extn
14th Aug 20199:00 amRNSPrice Monitoring Extension
14th Aug 20197:34 amRNSHeron - 1 Well Update
12th Aug 20194:40 pmRNSSecond Price Monitoring Extn
12th Aug 20194:36 pmRNSPrice Monitoring Extension
5th Aug 20197:00 amRNSSpud of Red Deer and Operational Update
30th Jul 20192:05 pmRNSSecond Price Monitoring Extn
30th Jul 20192:00 pmRNSPrice Monitoring Extension
19th Jul 20197:01 amRNSSpud of the Heron-1 Exploration Well
19th Jul 20197:00 amRNSChange of Adviser
26th Jun 20197:00 amRNSOperational update
17th Jun 20197:00 amRNSFinal Results
4th Jun 20194:40 pmRNSSecond Price Monitoring Extn
4th Jun 20194:35 pmRNSPrice Monitoring Extension
3rd Jun 20192:05 pmRNSSecond Price Monitoring Extn
3rd Jun 20192:00 pmRNSPrice Monitoring Extension
3rd Jun 201911:05 amRNSSecond Price Monitoring Extn
3rd Jun 201911:00 amRNSPrice Monitoring Extension
28th May 20197:00 amRNSDrilling Operations and PSC Extension update
16th Apr 20197:00 amRNSRig Contract Awards
4th Apr 20194:40 pmRNSSecond Price Monitoring Extn
4th Apr 20194:35 pmRNSPrice Monitoring Extension
11th Mar 20198:10 amRNSCorporate Presentation Update
7th Mar 20197:00 amRNSOperational Update
14th Feb 201911:05 amRNSSecond Price Monitoring Extn
14th Feb 201911:00 amRNSPrice Monitoring Extension
13th Feb 20192:05 pmRNSSecond Price Monitoring Extn
13th Feb 20192:00 pmRNSPrice Monitoring Extension
11th Feb 20194:35 pmRNSPrice Monitoring Extension
28th Jan 201911:41 amEQSEdison Investment Research Limited: Edison issues outlook on Petro Matad (MATD)
11th Jan 20192:00 pmRNSPrice Monitoring Extension
10th Jan 20197:01 amRNSCorporate presentation and Investor meeting
10th Jan 20197:00 amRNSOperational update
3rd Jan 20197:00 amRNSCorporate Presentation Update
26th Nov 201811:05 amRNSSecond Price Monitoring Extn
26th Nov 201811:00 amRNSPrice Monitoring Extension
26th Nov 20189:00 amRNSPrice Monitoring Extension
26th Nov 20187:00 amRNSWild Horse 1 Well Results and Operational Update
26th Oct 201810:00 amRNSExercise of Conditional Share Awards

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.