Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.75
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.10 (2.703%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 3.75
MATD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Spud of Red Deer and Operational Update

5 Aug 2019 07:00

RNS Number : 8668H
Petro Matad Limited
05 August 2019
 

THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED BY PETRO MATAD LIMITED TO CONSTITUTE INSIDE INFORMATION AS STIPULATED UNDER THE MARKET ABUSE REGULATION (EU) NO. 596/2014 ("MAR"). ON THE PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE ("RIS"), THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

 

5 August 2019

Petro Matad Limited

 

Spud of the Red Deer-1 Exploration Well and Heron-1 Well update

 

 

Petro Matad Limited ("Petro Matad" or "the Company"), the AIM quoted Mongolian oil explorer, announces that the Red Deer-1 exploration well in the Asgat Sag Basin of Block XX in eastern Mongolia spudded on 4 August. The well is being drilled with the Daton Petroleum Engineering and Oilfield Service LLC rig, DXZ1.

The Red Deer-1 well is targeting a prospect with 48MMbo of Mean Prospective Recoverable Resource and is planned to be drilled to a total depth (TD) of 2,100 metres. The well is expected to take up to 35 days to complete. In the event of a discovery, the Company will bring in a separate rig for testing. A call-off testing contract has been signed which ensures testing operations, if warranted, can commence soon after discovery.

Meanwhile, at Heron-1, the first casing point at 551 metres was reached on schedule and casing has been run and cemented. The DQE rig 40105 is now ready to drill out cement and then drill 8 ½ inch hole to the prognosed TD of 3,050 metres. However, the provincial government has challenged Petro Matad's legal right to use the land at Heron-1 on the basis that a tripartite agreement between two central government agencies and the province has not been executed. In all of Petro Matad's operations the Company has followed the land permitting regulations as required under the PSC and in accordance with instructions from the Ministry of Mining and the industry regulator MRPAM. The absence of a tripartite land use agreement between government agencies has never previously been an issue. We are working with the Ministry, MRPAM and the provincial government to remedy this situation as soon as possible.

The rig at Heron-1 has been put on standby whilst the situation is resolved. All efforts are currently directed at fixing this interruption as quickly as possible in order to minimise rig standby costs. Daily standby costs are low by industry standards and are of the order of $12,000. The Red Deer-1 well is located in a different province to that in which Heron-1 is located and has not been affected.

 

Further updates will be provided in due course.

 

Further information please contact:

 

Petro Matad Limited

 

Mike Buck, CEO

+976 7014 1099 / +976 7575 1099

 

 

Shore Capital (Nominated Adviser and Broker)

Richard Johnson

Andy Crossley

David Coaten

+44 (0) 20 7408 4090

 

Stifel Nicolaus Europe Limited (Broker)

 

Callum Stewart

Nicholas Rhodes

Ashton Clanfield

+44 (0) 20 7710 7600

 

FTI Consulting (Communications Advisory Firm)

Sara Powell

Ben Brewerton

Genevieve Ryan

+44 (0) 20 3727 1000

 All Reserves and Resources definitions and estimates shown in this report are based on the SPE/AAPG/WPC/SPEE Petroleum Resource Management System ("PRMS").

Technical information in this news release has been reviewed by the Company's Exploration Manager, Mr. Jerry Smart. He has 37 years of industry experience in oil and gas exploration and production with LASMO, Eni, Salamander Energy and Ophir Energy. He holds a B.Sc. in Geology from King's College, London.

Glossary

 

 

MMbo Million barrels of oil

Mean The arithmetic average of the low, mid and high case estimates of recoverable prospective resources

Prospective Resources Estimated volumes associated with undiscovered accumulations. These represent quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from oil and gas deposits identified on the basis of indirect evidence but which have not yet been drilled

 

About Petro Matad

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. At the current time, Petro Matad holds 100% working interest and the operatorship of three Production Sharing Contracts with the Government of Mongolia. Block XX has an area of 10,367 square kilometres in the far eastern part of the country and Blocks IV and V have an area of 29,062 square kilometres and 21,143 square kilometres, respectively, in the central western part of the country.

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLIFSETRIEIIA
Date   Source Headline
17th Apr 20247:00 amRNSNotice of AGM Logistics
3rd Apr 20247:00 amRNSNotice of AGM
1st Mar 202412:14 pmRNSOperational Update
19th Dec 20237:00 amRNSOperational Update
28th Sep 20237:00 amRNSInterim results and Operational Update
10th Jul 20237:00 amRNSOperational Update: Velociraptor-1 well results
6th Jul 20237:00 amRNSOperational Update: Block XX Land Permit
20th Jun 20237:00 amRNSFinal results for year ended 31 December 2022
14th Jun 20237:00 amRNSOperational Update - Spud of Velociraptor-1
31st May 20237:00 amRNSAward of New Options
22nd May 20237:00 amRNSOperational Update
3rd Apr 20237:00 amRNSOperational Update
3rd Mar 202311:05 amRNSSecond Price Monitoring Extn
3rd Mar 202311:00 amRNSPrice Monitoring Extension
15th Feb 202312:25 pmRNSResult of AGM
14th Feb 20237:00 amRNSOperational Update
9th Feb 20237:00 amRNSNotice of AGM Logistics
8th Feb 20237:00 amRNSResult of Retail Offer
3rd Feb 20237:00 amRNSResults of Capital Raise
2nd Feb 20235:02 pmRNSRetail Offer
2nd Feb 20234:41 pmRNSProposed fundraise for a minimum of US$4.0 million
20th Jan 20237:00 amRNSNotice of AGM
19th Jan 20237:00 amRNSChange of Adviser
9th Jan 20239:00 amRNSPrice Monitoring Extension
4th Jan 20232:05 pmRNSSecond Price Monitoring Extn
4th Jan 20232:00 pmRNSPrice Monitoring Extension
3rd Jan 20232:05 pmRNSSecond Price Monitoring Extn
3rd Jan 20232:00 pmRNSPrice Monitoring Extension
30th Dec 202211:05 amRNSSecond Price Monitoring Extn
30th Dec 202211:00 amRNSPrice Monitoring Extension
8th Dec 20222:05 pmRNSSecond Price Monitoring Extn
8th Dec 20222:00 pmRNSPrice Monitoring Extension
5th Dec 20227:00 amRNSOperational Update
22nd Sep 202211:00 amRNSPrice Monitoring Extension
22nd Sep 20227:00 amRNSInterim Results & Operational Update
27th Jun 20227:00 amRNSFinal Results for Year Ended 31 December 2021
5th May 20227:00 amRNSOperational Update
21st Mar 20224:36 pmRNSPrice Monitoring Extension
4th Mar 202211:32 amRNSInvestor Conference
3rd Mar 20221:08 pmRNSResult of AGM
2nd Mar 20227:00 amRNSNotice of AGM Logistics
25th Feb 20227:00 amRNSOperational Update
7th Feb 20222:30 pmRNSNotice of AGM
24th Jan 20224:42 pmRNSSecond Price Monitoring Extn
24th Jan 20224:37 pmRNSPrice Monitoring Extension
19th Jan 20227:18 amRNSProgressive publishes new research
18th Jan 202211:06 amRNSSecond Price Monitoring Extn
18th Jan 202211:00 amRNSPrice Monitoring Extension
15th Dec 20217:00 amRNSConditional Share Awards and Total Voting Rights
7th Dec 20217:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.