Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLansdowne Oil Regulatory News (LOGP)

  • This share is currently suspended. It was suspended at a price of 0.10
  • There is currently no data for LOGP

Barryroe Oil Resource Update

5 Sep 2012 07:05

RNS Number : 4881L
Lansdowne Oil & Gas plc
05 September 2012
 



 

 

September 5th 2012

 

Lansdowne Oil & Gas plc

 

Barryroe Oil In Place Resource Update

 

Lansdowne Oil & Gas plc, ("Lansdowne"), the AIM listed oil and gas exploration company, welcomes the announcement today of the resource update by Providence Resources plc ("Providence") on the Barryroe oil field in the North Celtic Sea Basin.

 

The announcement by Providence stated the following:

 

·; ADDITIONAL OIL IN PLACE RESOURCE ESTIMATES FOR TWO NEW RESERVOIR INTERVALS

 

P50 (MMBO)

P10 (MMBO)

LOWER WEALDEN

416

663

PURBECKIAN

362

502

TOTAL

778

1,165

 

Providence Resources P.l.c., ("Providence") the Irish oil and gas exploration and production company, whose shares are quoted in London (AIM) and Dublin (ESM), is pleased to provide a further update on the resource potential of Barryroe in the North Celtic Sea Basin, offshore Ireland. Providence (80%) operates Barryroe on behalf of its partner Lansdowne Oil and Gas plc (20%). The area is located in Standard Exploration Licence (SEL) 1/11 and Licensing Option (LO) 12/4, situated in c. 100 metre water depth and is c. 50 kilometres off the south coast of Ireland.

 

ADDITIONAL RESOURCE ESTIMATES FOR THE LOWER WEALDEN AND PURBECKIAN

 

In its RNS of July 25th, 2012, the Company issued updated oil in place figures for the Middle Wealden and Basal Wealden reservoir zones of 1,043 MMBO (P50) and 1,612 MMBO (P10). At that time, the Company also noted that there was further upside potential in the hydrocarbon bearing Lower Wealden and Purbeckian sands, as well as identifying the exploration potential of a deeper Upper Jurassic objective.

 

Providence has now completed an evaluation of the in place volumetric resource for these two additional logged hydrocarbon bearing intervals at Barryroe. This assessment, which was based on previous well data, together with 2D and 3D seismic data, estimates an additional total P50 oil in place resource of 778 MMBO and P10 resource of 1,165 MMBO. However, as there is limited reservoir and well test data available over these two intervals, future well data over these two specific zones would be required in order to firm up the final resource estimates. As such, these zones have not been included in the Barryroe dynamic reservoir simulation modelling, which is currently ongoing, with the results expected within the next six weeks. The resource potential of the underlying Upper Jurassic exploration objective has not been quantified as no wells have penetrated this deeper target at this location. The Barryroe partners plan to reprocess the 3D seismic data during Q4, and it is hoped that this will allow for better imaging of these deeper zones, prior to quantifying any associated prospective resource potential.

 

Commenting on the additional resource update, Mr. John O'Sullivan, Technical Director said:

 

"Whilst our focus remains firmly fixed on progressing the Middle and Basal Wealden sands into development, it is very encouraging to have identified this additional resource potential at Barryroe. It is clear that more data are required over these intervals, however, the numbers are potentially material and provide room for significant resource growth in the Barryroe project in the longer term. In the meantime, we look forward to providing shareholders with an update on recovery factors from the dynamic modelling project."

 

For further information please contact:

 

Lansdowne Oil & Gas plc

Steve Boldy, Chief Executive Officer

+353 1 637 3934

Chris Moar, Finance Director

+44 (0)1224 748480

Cenkos Securities plc

Jon Fitzpatrick

+44 (0)20 7397 8900

Neil McDonald

+44 (0)131 220 6939

 

 

Notes to Editors:

 

ABOUT LANSDOWNE

 

Lansdowne is an exploration and appraisal oil and gas company listed in London on the AIM Market (Symbol: LOGP). Lansdowne holds a balanced portfolio of oil discoveries, low and moderate risk gas prospects near existing infrastructure and moderate risk oil prospects. The Company is focused on the underexplored North Celtic Sea Basin which has proven petroleum systems in place for both oil and gas.

 

For more information, visit the Company's website: www.lansdowneoilandgas.com

 

 

ABOUT BARRYROE

 

The Barryroe licence lies in the North Celtic Sea and has had six wells successfully drilled on the structure. Hydrocarbons have been logged in all six wells with flow test results from four wells. Four wells were drilled in the 1970's by Esso with a further appraisal well drilled in 1990. The last well, 48/24-10z, was drilled by Providence in 2011/2012. The field is fully covered by both 2D and 3D seismic. The reservoir sands are of Cretaceous Middle and Lower Wealden age located between c. 4,500' TVDSS and 7,550' TVDSS. The oil is light (43o API) with a wax content of c. 17-20%. The latest oil in place estimate for the two main reservoir intervals (Middle Wealden and Basal Wealden) are 1,043 MMBO (P50) and 1,612 MMBO (P10).

 

Providence holds an 80% interest in the licence and operates on behalf of its partner, Lansdowne Oil and Gas Plc (20%).

 

GLOSSARY

 

TVDSS - True Vertical Depth Subsea

o API - Measurement Of Oil Gravity

STOIIP - Stock tank Barrels of Oil in Place

MMBO - Million Barrels of Oil

Ft - Feet

 

Qualified Person Review

 

This release has been reviewed by Stephen Boldy, Chief Executive of Lansdowne, who is a petroleum geologist with 32 years' experience in petroleum exploration and management. Dr. Boldy has consented to the inclusion of the technical information in this release in the form and context in which it appears

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDMGGLDDLGZZM
Date   Source Headline
1st Aug 20123:02 pmRNSHolding(s) in Company
25th Jul 20127:30 amRNSBarryroe Resource Update
23rd Jul 20124:00 pmRNSHolding(s) in Company
23rd Jul 20127:00 amRNSChange of Adviser
16th Jul 201210:19 amRNSHolding(s) in Company
26th Jun 201212:37 pmRNSResult of AGM
21st Jun 20127:08 amRNSBarryroe Core Analysis
6th Jun 20127:06 amRNSBarryroe Oil Assay
1st Jun 20127:00 amRNSGrant of Share Options
25th May 20127:00 amRNSFinal Results
24th May 20128:50 amRNSBarryroe Well Test Analysis
10th May 20128:04 amRNSBarryroe Seismic Inversion Study
12th Apr 20127:00 amRNSSeismic Update
27th Mar 201211:08 amRNSAppointment of MacQuarie Capital
23rd Mar 20128:21 amRNSBarryroe Well Testing Update
15th Mar 20125:01 pmRNSHolding(s) in Company
15th Mar 20127:01 amRNSBarryroe - Project Update
27th Feb 20127:03 amRNSBarryroe - Operational Update
23rd Feb 20127:00 amRNSSeismic Update and Opening of Data Room
9th Feb 20127:13 amRNSBarryroe Appraisal Well Operational Update
14th Dec 20117:06 amRNSOperational Update
8th Dec 20117:00 amRNSReview of 3D Seismic and Proactive Investors
23rd Nov 20117:00 amRNSDelivery of 3D Seismic Data
21st Nov 20117:05 amRNSBarryroe Appraisal Well Commences
7th Nov 20117:04 amRNSDelivery of Drilling Rig
19th Oct 20117:05 amRNSCeltic Sea Drilling Update
28th Sep 20117:00 amRNSInterim Results
18th Aug 20113:50 pmRNSHolding(s) in Company
26th Jul 20119:06 amRNSInterest in Lansdowne Oil & Gas plc
26th Jul 20117:00 amRNSIssue of Equity
18th Jul 20118:10 amRNSOperational Update
4th Jul 20117:05 amRNSOperational Update
14th Jun 201112:29 pmRNSAnnual General Meeting
8th Jun 20117:01 amRNS3D Seismic Survey Commences
19th May 20117:00 amRNSDirector/PDMR Shareholding
16th May 20118:00 amRNSFinal Results
18th Apr 20117:06 amRNSStatement re rig secured for Barryroe
31st Mar 20117:00 amRNSTotal Voting Rights
29th Mar 201110:22 amRNSLansdowne contracts 3D Seismic Vessel
23rd Mar 20111:08 pmRNSInterest in Lansdowne Oil & Gas plc
23rd Mar 201112:11 pmRNSResult of General Meeting
16th Mar 20117:00 amRNS3D Seismic Surveys in Celtic Sea
7th Mar 20117:00 amRNSIssue of Equity
28th Feb 20119:41 amRNSStatement re Extension of Loan Facility
18th Feb 20117:00 amRNSResource update
10th Feb 201111:40 amRNSResponse to Share Price Movement - Replacement
10th Feb 201110:10 amRNSResponse to Share Price Movement
20th Dec 20102:17 pmRNSTotal Voting Rights
17th Dec 20107:00 amRNSIssue of New Equity and Conversion of Securities
3rd Dec 20107:00 amRNSBarryroe 3D seismic plans & Helvick asset swap

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.