Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Resource Statement

19 Feb 2007 07:01

Landore Resources Limited19 February 2007 LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) JUNIOR LAKE-NICKEL PROJECT RESOURCE STATEMENT-PROPOSED WORK PROGRAM 2007 VW Zone Nickel Inferred Resource: Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA), Toronto, wasretained by Landore Resources Canada Inc. ('Landore') to independently carry out aresource estimate for the VW zone located at Landore's Junior Lake project,Ontario, and to prepare a National Instrument 43-101 compliant technical report. VW Zone Inferred Resource at 0.2% Nickel Cut-Off Grade,Tonnes Ni% Cu% Nickel Tonnes Copper Tonnes4,202,776 0.34 0.05 14,300 2,100 Based on Scott Wilson RPA's review of metal prices, mill recoveries, genericsmelter recoveries and terms, preliminary transport costs and estimate ofpreliminary open pit mine operating costs likely to apply at the VW Zone site,the 0.2% Ni cut-off grade is reasonable for the statement of Inferred Resourcesat this time. Mineral resources were estimated by Scott Wilson RPA using assumed long termmetal US$ prices of $7.00/lb nickel (Ni), $1.50/lb copper (Cu), $875/oz platinum(Pt), $300/oz palladium (Pd) and $500/oz gold (Au).(The average spot prices for January 2007 were, nickel $17.00/lb and copper$2.50/lb.) Scoping Study: Landore is very encouraged with the above results, particularly as the Inferredresource has been delineated on just 300 metres (m) of strike length and to anaverage depth of approximately 250m. The VW Zone remains open along strike atboth ends and to depth where there is potential to develop additional resources.Landore is further encouraged with the successful in-fill and extension drillingcompleted late last year on the adjacent B4-7 Ni-Cu Zone Accordingly, Landore has engaged Scott Wilson RPA to undertake a scoping study(preliminary assessment) to determine potential economics for mining the VW andB4-7 Zones and to identify the target resource base that will support mining atthe Junior Lake project. Junior Lake: The Junior Lake properties are located in the province of Ontario, approximately235 kilometres north-northeast of Thunder Bay and are situated within theCaribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. During this past summer a diamond drilling campaign significantly advanced boththe VW Zone nickel deposit and the adjacent B4-7 nickel-copper deposit towardspossible mining development. The VW Zone Ni Resource, discovered only in November 2005, is located at thesoutheastern end of the Junior Lake property. The Zone has been drilled with 45diamond NQ drill holes for a total of 11,366m at a general grid spacing of 50m x50m over 300m of strike length x 200m wide and to an average depth ofapproximately 250m. The VW Zone contains 5 sub-zones, the widest and most continuous being'Katrina', which lies along the southern contact with the ultramafic sequence.The western section of three holes drilled on the VW Zone have some of the bestintersections on 'Katrina' returning a number of +1% Ni grades.'Katrina' remains open to the east and west and at depth. Scott Wilson RPA has recommended that additional exploration drilling to expandthe resources to depth, particularly on the northern side of the VW depositwhere the sub-zones are tested to shallower depths compared to the southerlysub-zones, and on the west side, following which the VW Zone modeling andresource estimate should be updated. Contingent on results from the above drilling and the outcome of the ScopingStudy, Scott Wilson RPA has recommended to carry out in-fill drilling wherenecessary to bring the spacing in the VW Zone to 25m x 25m in order to upgraderesources to Indicated Resources. The B4-7 Ni-Cu Deposit, lies 3 kilometres west of the VW zone and has beendelineated by 63 diamond drill holes, drilled over a period from 1969 to 2006,for a total of 14,388m over 520m of strike length and to an average depth ofapproximately 250m. An independent estimate of exploration potential was prepared for the B4-7 zoneby Scott Wilson RPA in March 2006. 3D computer block modeling and cut-off gradeof 0.25% nickel equivalent were used for the estimate. B4-7 Deposit Estimate of potential Tonnage and Grade:Tonnes Ni% Cu% Coppm Au ppb Pt ppb Pd ppb Nickel CopperMillions Tonnes Tonnes1.5 0.6 0.40 606 40 90 460 9,000 6,000To2.0 0.7 0.48 670 50 95 525 14,000 9,600 Scott Wilson RPA reviewed metal prices, mill recoveries, generic smelterrecoveries and terms, preliminary transport costs and estimate of preliminaryopen pit mine operating costs likely to apply at the B4-7 Zone site to determinethe nickel equivalent cut-off grade.The estimate of the exploration potential in March 2006, assumed long term metalUS$ prices of $3.50/lb nickel (Ni), $1.10/lb copper (Cu), $750/oz platinum (Pt),$275/oz palladium (Pd) and $400/oz gold (Au). The potential quantity and grade of the B4-7 Zone is conceptual in nature andthere has been insufficient exploration, primarily metallurgical work, to permitdefining a mineral resource. It is uncertain if further exploration work willresult in the B4-7 Zone being delineated as a mineral resource.' Scott Wilson RPA recommended at the time that additional drilling be carried outto in-fill gaps in the zone and to provide material for modern metallurgicalwork to improve nickel recovery.A 7 hole diamond drill program was completed late last year on the B4-7 depositwhich successfully in-filled several of the gaps and extended the deposit to thewest.A composite of ore has been submitted for preliminary metallurgical testing forthe recovery of Ni.-Cu.-PGE minerals. Results are pending. Proposed Works Program 2007. A 15,000m NQ diamond drill campaign is scheduled to commence in mid-March on theVW and B4-7 deposits, of which: 9,000m is allocated for extension and partialin-fill on the VW deposit; 3,000m for in-fill on the B4-7 deposit; 2,000m formetallurgical testing on both deposits and 1,000m for geotechnical work on theVW deposit for open-pit design requirements. Additional metallurgical flotation testing is scheduled for the VW and the B4-7deposits to optimize recovery and concentrate grades. Golder Associates have been retained by Landore to carry out Base Line Aquaticstudies on the lakes and drainage tributaries in the vicinity of the Junior Lakeprojects. These studies will commence in late February. Commenting on the report, Chairman of Landore Resources, Bill Humphries, said: "The general consensus within the mining and metals industries is that the priceof nickel will remain strong and fundamental supply restraints should limitdownward pressure on nickel prices. It is Landore's aim to take full advantageof the favourable conditions by advancing the Junior Lake Nickel Project toproduction as rapidly as possible. Mr. Richard Routledge, M.Sc., P. Geo., Consultant Geologist with Scott WilsonRoscoe Postle Associates Inc. and the author of the report entitled " TechnicalReport on the Resource Estimate for the VW Zone, Junior Lake Project, NorthernOntario Canada" prepared for Landore Resources Canada Inc., dated January 22,2007, is the Qualified Person in accordance with the requirements of theCanadian National Instrument 43-101. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. - ENDS - For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201Holborn Public Relations Limited This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.