Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Update

3 Aug 2009 07:00

RNS Number : 7213W
Landore Resources Limited
03 August 2009
Β 

ο»Ώ

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

DRILLING UPDATE

JUNIORΒ LAKEΒ PROPERTY

LAMAUNE IRONΒ DEPOSIT

B4-7Β NICKEL PROJECT

HIGHLIGHTS

A secondΒ drilling and trenchingΒ campaignΒ has commenced on the LamauneΒ Iron Deposit, locatedΒ at the western end of the Junior Lake Property,Β toΒ confirmΒ anomalies delineated byΒ the recently completedΒ helicopter-borne 'Impulse'Β geophysical survey and to provide material for metallurgical testing.

Results from the recently completed drilling campaign on the B4-7 nickel-copper-cobalt-platinum group elements (Ni-Cu-Co-PGE) deposit continue to report wide zones of mineralization containing high grade nickel. The deposit, delineated to date over 650 metres of strike, remains open along strike and down plunge to the north-west.

TheΒ JuniorΒ LakeΒ property:

The Junior Lake property, 100% owned by Landore,Β is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay andΒ is host to;Β the VW NickelΒ Deposit,Β theΒ B4-7 Deposit, the LamauneΒ Iron Deposit, the BAM zone gold occurrence and numerous other highly prospective mineral occurrences.

Lamaune Iron Deposit:

In October 2008, Landore reported that exploration, including geophysical surveys, trenching and drilling, had confirmed the presence of a large magnetite iron deposit at the western end of the Junior Lake property.

The Lamaune Iron Deposit is just 11 kilometres from theΒ Canadian National Railway providing direct access to theΒ PortΒ ofΒ ThunderΒ BayΒ onΒ Lake Superior. The port still has much of the infrastructure used byΒ Steep Rock Iron MinesΒ to shipΒ Iron oreΒ to the iron mills ofΒ North America.

In addition the iron deposit has abundant water resources nearby and is just 20 kilometres from the planned Hydropower on the Little Jackfish River.

TheΒ positiveΒ results of the exploration, together withΒ the potential access toΒ excellent infrastructure in the vicinity,Β were sufficiently encouragingΒ for LandoreΒ to advance the Lamaune Iron deposit towards resource status.

In February 2009, a Helicopter-borne 'Impulse' geophysical survey was completedΒ along a 12 kilometre trend over the western part of the Junior lake property, which included the Lamaune IronΒ Deposit area and possible extensions to the east and west. In all, 724 line kilometres wereΒ completed at 50 metre spacing.

The 'Impulse' geophysical survey wasΒ selectedΒ to more clearly define the anomalies identified in the previous ground and air-borne magnetic surveys and to identify anomalies in the newly acquired western extension ofΒ theΒ JuniorΒ LakeΒ property.

TheΒ survey has provenΒ highly successfulΒ in the identification of magnetite rich anomalies.

AΒ second campaign, consisting ofΒ 1,200 metres ofΒ trenching and 7,000 metres of drilling,Β commenced in late June. The trenches and drill-holesΒ have been plannedΒ to giveΒ evenΒ coverage along approximately 5 kilometres of the central part of the trend.

To date 13 trenches for a total of 720 metresΒ have been excavatedΒ and 15 drill-holesΒ for a total of 3,199 metres have been drilled.Β CuttingΒ and sampling is in progress. Results are pending. Sampling is also being undertaken forΒ metallurgical and beneficiation testing.

B4-7Β Deposit:

In May of 2008, LandoreΒ reportedΒ anΒ InferredΒ resource estimateΒ for the B4-7Β DepositΒ of 4,650,000 tonnes at 0.55% Nickel Equivalent (NiEq) (nickel plus copper-cobalt-PGE credits).Β 

An infill drill programme, consisting of 42 NQ size holes for a total of 8,764 metres, has recently been completed on the B4-7 Deposit. The programme was designed to provide sufficient information and drill density to advance the deposit to Indicated status. Additional metallurgical testing will be completed using core from the present program.

Mineralized intersectionsΒ not previously reportedΒ include:

Drill-hole

From

Width

Nickel

Copper

Cobalt

Platinum

Palladium

No

Metres

Metres

%

%

%

g/t

g/t

0419-223

228.30

12.78

0.83

0.49

0.08

0.08

0.66

including

229.35

1.00

1.06

0.24

0.09

0.21

0.57

including

235.50

1.00

1.05

0.72

0.09

0.05

0.83

0419-233

66.98

14.84

0.48

0.49

0.05

<0.01

0.07

0419-234

150.62

12.25

0.65

0.32

0.05

0.01

0.02

0419-235

87.97

10.89

0.65

0.28

0.05

0.26

0.64

including

91.40

1.00

1.01

0.18

0.06

0.43

1.40

including

95.00

1.00

1.03

0.09

0.06

0.28

0.13

0419-237

33.00

2.00

0.39

0.08

0.02

1.99

7.54

and

59.16

0.59

1.45

0.31

0.06

1.32

5.18

Assay results are pendingΒ for the lastΒ 6 drill-holes.Β 

Landore has appointedΒ Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA), consulting and engineering group from Toronto,Β Canada, to prepare aΒ CanadianΒ National Instrument 43-101 (NI43-101) compliant resource estimate upgrade on theΒ B4-7 deposit.

The drill campaignΒ has shown that the B4-7 deposit remains open to the west along strike and down plunge to the north-west. A previously completed airborne electromagnetic survey suggests theΒ conductiveΒ horizon hosting the B4-7 depositΒ persistsΒ for an additional 500 metersΒ to the west.

All drill-core was photographed prior to being cut for assaying. Samples were analyzed at Accurassay Laboratories (ISO/IEC 17025),Β Thunder Bay,Β Ontario, by geochemical analysis withΒ atomic absorption finish (Ni). All samples reporting results of 1% nickel or higherΒ areΒ re-analysed by theΒ singleΒ assay method with atomic absorption finish. Check assays,Β blanks,Β standards and laboratory duplicatesΒ areΒ performed on a systematic basis at Accurassay Laboratories. ActlabsΒ Laboratory inΒ Thunder Bay,Β OntarioΒ is used forΒ systematic checks. Core is storedΒ onΒ site and in Landore'sΒ secureΒ facilities inΒ Thunder Bay,Β Ontario. Rejects are stored atΒ Landore'sΒ secureΒ facilities inΒ Thunder Bay.

Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) aΒ consultant to Landore Resources LimitedΒ Β and a qualified person as defined inΒ the CanadianΒ National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in thisΒ announcement, which is stated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum.

- ENDS -

For more information please contact:

Bill Humphries, Chairman

Richard Prickett, Chief Executive

Landore Resources Limited

Tel: 07734 681262Β 

Tel: 07775 651421Β 

www.landore.com

Simon Raggett

Strand Partners Limited

Tel: 020 7409 3494

David Bick

Tel: 07831 381201


This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLDFLFXKDBLBBV
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.