Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Update

30 Sep 2021 07:00

RNS Number : 4451N
Landore Resources Limited
30 September 2021
 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014

 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

 DRILLING UPDATE

BAM GOLD DEPOSIT

JUNIOR LAKE PROPERTY

 

London, United Kingdom - 30th September 2021 - Landore Resources Limited (AIM: LND) ("Landore Resources" or "the Company") is pleased to provide an update on the progress of the drilling programme for 2020-21 (the "Drilling Programme") on the BAM Gold Deposit, Junior Lake Property, Ontario, Canada ("BAM Gold Deposit").

Highlights:

· BAM GOLD DEPOSIT WESTERN EXTENSION: Step-out drilling has confirmed the extension of the BAM Gold Deposit along strike to the west with drill hole 0421-814 intersecting 17.45 metres at 4.13 grams per tonne gold, including 5.98 metres at 9.80 grams per tonne gold. Mineralisation remains open to the west and down dip. 

· DRILLING PROGRAMME EXTENDED: An additional 2,500 metres of drilling has been allocated to further target the newly discovered Western Extension mineralisation. These activities are to be carried out in conjunction with the upcoming Felix drill programme and will be fully funded from the Company's existing cash resources.

 

BAM GOLD DEPOSIT:

The 2020/21 drilling programme included 6,100 metres of HQ diamond core for 24 holes drilled along strike from the defined BAM Gold Deposit from 200W to 950E. Drilling intersected typical BAM lithology and mineralisation. Initial in-house modelling suggests an extension of the BAM Gold western shoot plunging approximately 30% to the west with widths and grades improving at depth.

 

Results not previously reported include:

Easting

Northing

Drill-hole

From

Interval*

Au

 

 

No

Metres

Metres

g/t

800E

350N

0421-813

220.80

20.55

1.10

 

 

including

227.75

1.15

7.76

 

 

and

251.62

1.00

3.30

900E

335N

0421-814

222.12

17.45

4.13

 

 

including

232.74

5.98

9.80

 

 

and

236.80

1.02

47.20

950E

350N

0421-815

160.52

1.76

4.25

 

 

and

170.77

7.35

0.84

1000E

290N

0421-816

238.92

1.92

1.78

 

 

and

284.04

2.78

4.24

 

* The drill holes were drilled north at 45 to 52 degrees into a lithological package dipping approximately 80 to 70 degrees to the south. The Company estimates that the actual true thickness of mineralisation represents 75% to 85% of the intervals shown in the above table.

 

Commenting on this report, Chief Executive Officer of Landore Resources, Bill Humphries, said:

"The confirmation of the western extension of the BAM Gold Deposit with intersections containing high grade gold over significant widths together with our expectation that the shoot continues further to the west, is a just reward for Landore's perseverance with its systematic exploration of the highly prospective Junior Lake Property and further demonstrates its potential to host a multi-million ounce open pit resource with significant underground mining potential."

 

2020-2021 Drilling Programme:

The Drilling Programme, consisting of a total of 23,000 metres of HQ diamond core drilling, commenced on October 15th, 2020 and was designed to further infill and extend the defined BAM Gold Deposit resource of 1,015,000 ounces. To date a total of 21,933 metres of HQ diamond core drilling, comprising 94 drill holes, (0420-725 to 0421-818) has been completed. 

 

BAM Geology and Mineralisation:

Interpretive work and conceptual modelling conducted by Landore's senior geological consultant and independent engineers has indicated the gold mineralization resides within a series of tabular shaped zones oriented in a roughly en-echelon configuration, generally parallel to the overall strike of the host rock units (east-southeast direction).

 

Shoots of significant gold mineralization within the BAM east pit and BAM west pit zones are interpreted to dip approximately 30º to the west. Preliminary interpretation of drilling results has indicated the potential for repeating shoots of significant gold mineralization along strike west and east of the defined BAM resource.

 

Planning:

Drilling will re-commence in mid-October 2021 on further delineation of the newly discovered western extension shoot together with commencement of drilling on the highly prospective Felix area along strike and to the west of the BAM Gold Deposit.

 

Landore has engaged Cube Consulting of Perth Western Australia to complete a Mineral Resource Estimate ("MRE") and Preliminary Economic Assessment ("PEA") update on the BAM Gold Deposit, which is currently scheduled for completion in Q4 2021.

 

BAM GOLD DEPOSIT:

The BAM Gold Deposit is located approximately mid-way along a highly prospective Archean greenstone belt which traverses the Junior Lake Property from east to west for approximately 31 kilometres. The favorable greenstone belt ranges from 0.5 to 1.5 kilometres wide and hosts multiple known gold occurrences including the Lamaune Gold Prospect.

 

The Junior Lake Property:

The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2% owned) (jointly the "Junior Lake Property"), consisting of 30,507 hectares, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: The BAM Gold Deposit; the B4-7 Nickel-copper-cobalt-Platinum-Palladium-gold Deposit; the VW Nickel-Copper-cobalt Deposit; Lamaune Gold Prospect and numerous other precious and base metal occurrences.

 

Covid-19

The Company is following Government Covid-19 guidelines in its operations in Canada.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

 

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an

Exploration office located in Thunder Bay, Ontario, Canada.

 

For more information, please contact:

Landore Resources Limited

 

Bill Humphries, Chief Executive Officer

Tel: 07734 681262

Glenn Featherby, Finance Director

Tel: 07730 420318

 

 

Cenkos Securities (Nominated Advisor and Broker)

 

Derrick Lee / Peter Lynch

Tel: 0131 220 9100

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLQKLFLFKLXBBX
Date   Source Headline
22nd Feb 20215:24 pmRNSDirectors Subscription
17th Feb 20213:12 pmRNSExercise of Warrants and Issue of Equity
16th Feb 20215:57 pmRNS£3.5 Million Fundraising
15th Feb 20217:00 amRNSCorporate Presentation
12th Feb 20214:49 pmRNSStatement re Press Speculation
12th Feb 20218:24 amRNSExercise of Warrants and Issue of Equity
11th Feb 20217:00 amRNSDrilling Update
28th Jan 20214:28 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20215:31 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20213:16 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20217:00 amRNSExercise of Warrants and Issue of Equity
14th Jan 20217:00 amRNSSoil Sampling Program Results
3rd Dec 20207:00 amRNSDrilling Update
9th Nov 202012:38 pmRNSChange of Admission Date
6th Nov 20207:29 amRNSExercise of Warrants and Issue of Equity
19th Oct 20207:00 amRNSDrilling Commences at BAM Gold Project
28th Sep 20207:00 amRNSInitiation of Research Coverage
21st Sep 20207:00 amRNSAcquisition of Royalty Rights at Lamaune Lake
21st Sep 20207:00 amRNSHalf-year Report
1st Sep 20207:00 amRNSDrilling Programme 2020/21 and Pit Optimisation
20th Aug 202012:46 pmRNSResults of General Meetings
6th Aug 202012:54 pmRNSHolding(s) in Company
24th Jul 20201:57 pmRNSAward of Options
24th Jul 20207:01 amRNSProposed Share Capital Consolidaton
24th Jul 20207:00 amRNSFinal Results & Notice of AGM
21st Jul 202011:26 amRNSHolding(s) in Company
20th Jul 202011:13 amRNSHolding(s) in Company
13th Jul 202011:42 amRNSResult of Extraordinary General Meeting
1st Jul 202011:05 amRNSSecond Price Monitoring Extn
1st Jul 202011:00 amRNSPrice Monitoring Extension
29th Jun 20207:00 amRNS£2.8 million Conditional Placing and Accounts Date
22nd Jun 20209:05 amRNSSecond Price Monitoring Extn
22nd Jun 20209:00 amRNSPrice Monitoring Extension
24th Apr 20207:00 amRNSSubscription to raise £260,000
15th Apr 20207:00 amRNSCorporate Presentation
9th Apr 20207:00 amRNSResource Estimate and Technical Report Publication
6th Apr 20204:11 pmRNSDirector/PDMR Shareholding
7th Feb 20204:26 pmRNSDirectorate Change
17th Jan 20207:00 amRNSAppointment of Non-Executive Director
16th Jan 202010:18 amRNSNew Corporate Presentation
14th Jan 202011:52 amRNSSubscription to raise £225,000
7th Jan 20207:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
9th Dec 20197:00 amRNSSoil Sampling Program Results
13th Nov 20197:00 amRNSGrant of Mining Leases to Lamaune Inc
21st Oct 20197:00 amRNSProgress Update - BAM Gold Project
18th Sep 20199:13 amRNSSubscription to raise £470,000
4th Sep 20197:00 amRNSDrilling Update - BAM Gold Project
15th Aug 20197:00 amRNSHalf-year Report
25th Jul 20194:14 pmRNSAward of Options
24th Jul 20191:25 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.