Malelane Scoping Study Update

25 Jun 2012 07:00

RNS Number : 0157G
Ferrex PLC
25 June 2012
Β 

ο»Ώ

Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining

25 June 2012

Ferrex plc ('Ferrex' or 'the Company')

Positive Malelane Iron Ore Scoping Study Update

Β 

Ferrex plc, the AIM quoted iron ore and manganese development company focused in Africa, is pleased to provide a positive Scoping Study update from its 74% owned 4,192 Ha Malelane Iron Ore Project ('Malelane') located in the prospective Mpumalanga Province of South Africa with direct access to the port of Maputo in Mozambique.

Β 

Overview

Β·; Economics significantly improved through updated Scoping Study to produce a 56% Fe product using crush/high pressure grinding roll ('HPGR') to produce a 6mm product followed by Dense Media Separation and spirals

o Capital cost substantially reduced from USD297m to USD139m

o Capital intensity further reduced from USD99/t to USD89/t - enhancing the Company's position within the lowest quartile for capital intensity* of new iron ore projects worldwide

o IRR increased from 39% to 50% (pre-tax)

o NPV @ 10% of USD317m (pre-tax)

Β·; Further testwork on fines produced in the process now being undertaken to further improve overall recoveries and economics

*capital intensity is the capital cost of the project divided by the tonnage of product produced per annum

Β 

Ferrex Managing Director Dave Reeves said, "The updated Scoping Study has significantly enhanced the commerciality of Malelane as a potential producing asset and is in line with the Company's strategy of targeting low capital projects. This update also highlights the significant benefits of simplifying the process route via DMS and has resulted in a 25% increase in IRR whilst more than halving capital costs, and further reducing the already impressive capital intensity figures for the project.

Β 

"Whilst the NPV has reduced, the increase in the IRR of the project delivers a better return to shareholders. We are focussed on creating minimal dilution to shareholders where possible, and with an estimated total capital cost of USD139m, it is now potentially feasible for the Company to fund a large portion of the development of this project with anticipated cashflows from its proposed Nayega manganese development in Togo which is targeted to go into production towards the end of 2013.

Β 

"Work will now focus on finalising the fines process route in order to further improve economics and overall yield. With this in mind we look forward to updating shareholders further as we progress Malelane up the development curve and towards production."

Β 

Detailed Information

Β 

Metallurgical Testwork

Β 

The DMS metallurgical testwork used in the revised scoping study was conducted under the guidance of Nagrom, an Australian iron ore processing specialist. The testwork consisted of crushing and dense media separation processes.

Β 

Results showed that at a density separation of 3.1, a 60% iron ('Fe') recovery at a 46% mass recovery occurs for -6mm to +1mm material. This compares to a mass recovery of 47% achieved in the process used in the Scoping Study. The average grade of product produced from the DMS was 56% Fe from a feed grade of 42% Fe. Initial modelling suggests that 64% of the feed to the plant will report to the DMS circuit with the remaining to be treated by a fines circuit. For this study, the fines were processed through a set of spirals that yielded 20% mass recovery. This is an area the Company will now focus on to improve recoveries.

Β 

Cost Estimates

Β 

Mining schedules and costs were re-run by Turgis consulting to provide a 4.5mtpa feed rate to the plant. DRA Pacific undertook a Scoping Study on the revised process flowsheet using the previously announced numbers as a base. The major changes were as follows:

Β 

1. Decrease plant capital cost from USD203m to USD84m

2. Decrease EPCM and Contingency from USD56m to USD26m

3. Increase logistics handling via using an overland conveyor to the rail from USD14.4m to USD19.6m

4. Decrease overall plant operating costs from USD6.89/t to USD3.66/t

5. Overall operating costs have increased to USD64/t FOB due to the lower mass recoveries and higher strip ratios

Β 

Malelane - Further Information

Β 

Malelane is located over part of the Archaean Barberton Greenstone Belt, close to infrastructure and just 6km from an electrified railway line which services the deep water port of Maputo in Mozambique 170km away.

Β 

Three distinct BIF horizons have been identified on the property with a combined strike length of 14km and mapped horizontal widths of up to 300m. A maiden JORC Code compliant Inferred Resource of 139Mt @ 40.1% CaFe has been calculated over 1.1km of the 14km strike length. Mining consultants Coffey Mining calculated a total exploration target at Malelane of between 775 and 930Mt at 34-36% Fe.

Β 

Competent Person Statement

Β 

Information in this release that relates to exploration results is based on information compiled by Ferrex Exploration Manager Mr Mark Styles. Mr Styles is a qualified geologist, a member of the Australian Institute of Geoscientists and is a Competent Person as defined in the Australasian Code for Reporting of Exploration Results. Mr Styles consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.

Β 

Β 

Caution Regarding Forward Looking Statements: Information included in this release constitutes forward-looking statements. There can be no assurance that ongoing exploration will identify mineralisation that will prove to be economic, that anticipated metallurgical recoveries will be achieved, that future evaluation work will confirm the viability of deposits that may be identified or that required regulatory approvals will be obtained.

Β 

Β 

**ENDS**

Β 

For further information please visit www.ferrexplc.com or contact the following:

Β 

Dave Reeves

Ferrex plc

+ 61 (0) 420 372 740

Russell Lamming

Ferrex plc

+ 44 (0) 781 0870 587

Colin Aaronson/ David Hignell

Grant Thornton Corporate Finance

+44 (0) 20 7383 5100

John Prior / Sebastian Jones

Canaccord Genuity

+44 (0) 20 7523 8350

Felicity Edwards/ Elisabeth Cowell

St Brides Media and Finance Ltd

+44 (0) 20 7236 1177

Β 

Notes

Β 

Ferrex plc is an AIM quoted exploration and development company focused on advancing low capex iron ore and manganese projects in Africa through the development cycle and into production. Our current property portfolio comprises iron ore (Malelane) and manganese (Leinster) projects in South Africa and a manganese project (Nayega) in Togo, all of which offer the potential for significant near-term value uplift.

Β 

The Company's growth strategy is centred on advancing its current assets, utilising its Board and management team's considerable experience in developing resource projects across Africa and expanding its portfolio through acquisitions to build Ferrex into a mid-tier, low-cost producer of iron ore and manganese.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCEAKKAASPAEFF
Date   Source Headline
12th Mar 20187:00 amRNSDirectorate Change
8th Mar 20188:23 amRNSCalidus announces significant regional potential
1st Mar 20187:00 amRNSFinal Results
20th Feb 20187:00 amRNSCalidus appoints Mark Connelly as Chairman
31st Jan 20187:00 amRNSCalidus announces high grade intercepts
15th Jan 201810:15 amRNSDirector Share Purchase
18th Dec 20177:00 amRNSCalidus Announces 74% Increase in Resource
30th Nov 20177:00 amRNSCalidus announces high grade intercepts
23rd Nov 20173:55 pmRNSNew Company Presentation
23rd Nov 20177:00 amRNSCalidus announces multiple new gold targets
16th Nov 20179:47 amRNSPilbara Gold Presentation-London 23 November 2017
14th Nov 20177:00 amRNSCalidus - Driling results at Satellite Deposits
6th Nov 20177:00 amRNSCalidus commences Novo JV and exercise of Option
24th Oct 201710:42 amRNSTotal Voting Rights
19th Oct 201711:40 amRNSDirector Share Purchases
18th Oct 20173:51 pmRNSPlacing to raise £250,000
17th Oct 20177:00 amRNSCalidus reports Klondyke Drill Programme Extended
29th Sep 20177:00 amRNSResignation of Director
27th Sep 20177:00 amRNSCalidus completes A$10m placement
20th Sep 20177:00 amRNSCalidus enters Joint Venture with Novo Resources
6th Sep 20177:00 amRNSCalidus reports 2.6km of continuous mineralisation
29th Aug 20177:45 amRNSCommencement of Diamond Drill Programme at Calidus
16th Aug 20177:00 amRNSCalidus Reports High-Grade Intercepts
1st Aug 20177:00 amRNSBrandon Hill Research
31st Jul 20177:00 amRNSFurther Consolidation of Warrawoona Gold Project
25th Jul 20177:00 amRNSHigh Grade Gold Drill Results from Warrawoona
12th Jul 20177:00 amRNSCalidus Maiden Drill Results, Warrawoona Project
22nd Jun 20177:00 amRNSCalidus Resources Commences Trading
20th Jun 20178:00 amRNSCalidus Resources to Commence Trading
15th Jun 20177:00 amRNSCalidus Resources Commences Drilling at Warrawoona
13th Jun 20177:00 amRNSAllotment of Shares in Calidus Resources
5th Jun 20177:00 amRNSASX Capital Raising Complete
1st Jun 20172:00 pmRNSConditional Approval for Calidus Resources Listing
30th May 201712:40 pmRNSApproval for Pharmanet Group to acquire Keras Gold
26th May 20173:00 pmRNSConversion of Additional Debt
24th May 201711:26 amRNSResult of General Meeting
22nd May 20177:00 amRNSInterim Results
15th May 20177:00 amRNSCobalt and Nickel Licences Awarded
8th May 20177:00 amRNSLodged Prospectus for ASX Listing
28th Apr 20174:45 pmRNSNotice of General Meeting & Corporate Update
28th Apr 20177:00 amRNSExpansion of Prospective Australian Gold Footprint
24th Apr 20173:15 pmRNS£530,000 Placing & appointment of Joint Brokers
18th Apr 20177:00 amRNSOversubscribed Placing to Support ASX Listing
30th Mar 20177:00 amRNSApplications for Cobalt and Nickel Licences
22nd Mar 201712:47 pmRNSNotice of Event Attendance and Call Recording
21st Mar 201712:30 pmRNSShareholder and Analyst Conference Call
21st Mar 20177:00 amRNSListing of Australian Gold Assets on the ASX
21st Feb 20178:15 amRNSIssue of Equity and Total Voting Rights
14th Feb 20177:00 amRNSInitial High Grade Resource at Copenhagen Deposit
10th Feb 20172:18 pmRNSNew Corporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.