If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKodal Minerals Regulatory News (KOD)

Share Price Information for Kodal Minerals (KOD)

Share Price is delayed by 15 minutes
Get Live Data
0.30    -0.0095 (-3.07%)
Bid:
0.29
Ask:
0.31
Spread: 0.02 (6.897%)
Market Cap: £61.12m
KOD Live PriceLast checked at - London Stock Exchange

Intraday Kodal Minerals Share Chart

Update on Exploration Programme: Bougouni Project

19 Apr 2018 07:00

RNS Number : 3918L
Kodal Minerals PLC
19 April 2018
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR") 

 

Kodal Minerals Plc / Index: AIM / Epic: KOD / Sector: Mining

 

19 April 2018

 

Kodal Minerals plc ('Kodal Minerals' or 'the Company')

 

Update on Exploration Programme at Bougouni Lithium Project

 

Kodal Minerals plc, the mineral exploration and development company focussed on West Africa, is pleased to provide an update on the Company's exploration programme at the Bougouni Lithium Project in Southern Mali ("Bougouni" or the "Project").

 

Highlights:

· Reverse circulation drilling continuing on site with two drill rigs operating on a "double shift" basis.

· Drilling planned to continue through to the beginning of the rainy season in June/July 2018 following which the Company expects to be in a position to commission a JORC Compliant Mineral Resource Estimate.

· Following the issuance of the new licences (announced on 17 April 2018), the contract for the bulk sample excavation, crushing and transport has been signed, initial payment made and the contract mining firm will be mobilising to site shortly.

· Metallurgical samples undergoing a test work programme at a facility in Australia designed to validate and expand on the initial metallurgical test results.

· A second sample has been dispatched to Chinese plant of Shandong Ruifu Lithium for further metallurgical testing following the first sample which indicated Bougouni could produce battery grade lithium carbonate.

 

Bernard Aylward, CEO of Kodal Minerals, said: "We are continuing with the major exploration and definition programme at Bougouni with multiple key activities happening in parallel as we look to fast track our project towards a decision to mine in as short a timeframe as practicable. The drilling is focused on infill and definition at the Ngoualana and Sogola-Baoule prospects, while we are also testing multiple exploration targets to define additional high-grade pegmatite zones.

 

"Alongside this drilling campaign, we are also progressing our bulk sample work and a contract mining firm will be mobilising to site shortly. The bulk sample will provide us with critical information regarding the mining and processing characteristics of our mineralisation and the metallurgy will provide us with key information on the quality of the product as well as specific information to be included in potential processing plant design."

 

Exploration Campaign:

Reverse Circulation Drilling

The reverse circulation ("RC") drilling programme is designed to continue infill and extension of the Ngoualana and Sogola-Baoule prospects. These are currently the two advanced prospects and it is anticipated that with well targeted drilling the Company will be in a position to commission a maiden JORC compliant mineral resource estimate following completion of this campaign.

 

In addition to the definition drilling, the programme is also continuing the exploration drill testing of existing and new prospects to allow us to continue to develop an inventory of targets within the Bougouni Lithium project that will support the development of a future mining hub. Prospects for immediate drill testing include the Boumou prospect, where previous first pass drilling confirmed high-grade pegmatite hosted mineralisation, as well as the newly identified Bougouni South prospect.

 

There are currently two drill rigs operating on site and this is anticipated to continue until the rainy season commences, normally in June/July. Assay results are pending for drilling completed in February and March 2018 and will be released to the market as received.

 

Bulk Sample

The contract for the 5,000t bulk sample has been signed and mobilisation is commencing to site. The contract is with the infrastructure development and mining group CGCOC, which has mining operations in Uganda, Nigeria and Guinea. The group has been contracted for the mining, crushing and transport of the sample to the port of Dakar from where it will be transported to the Shandong Ruifu Lithium plant in China for concentrating and processing testwork.

 

The bulk sample will be extracted from the Ngoualana prospect where outcropping and near surface mineralisation will be mined. This prospect provides an ideal initial test as the Company has surface mapping and sampling, drilling and geophysical data to compare to the mining operation and this will provide excellent data for use in future mine planning.

 

Metallurgy

The metallurgical testwork is continuing in Australia and China. The sampling is testing selected intervals of the diamond core from the Ngoualana prospect and will review the crushing parameters and recovery results of the spodumene minerals from the DMS and flotation system.

 

The metallurgical testwork will provide a "flow sheet" of the proposed processing path and potential recovery of the product from processing. The Company has been working towards developing a mining operation in Bougouni with the aim of producing a spodumene concentrate product for sale and this metallurgical test work will be important is assisting the design and development of a processing plant suitable for the Bougouni pegmatite hosted mineralisation. As announced on 9 October 2017, Shandong Ruifi Lithium, one of the largest lithium carbonate producers in China, produced a high quality, low impurity battery grade lithium carbonate using spodumene concentrate from Bougouni.

 

**ENDS**

 

For further information, please visit www.kodalminerals.com or contact the following:

 

Kodal Minerals plc

Bernard Aylward, CEO

 

Tel: +61 418 943 345

 

Allenby Capital Limited, AIM Nominated Adviser

Jeremy Porter/Nick Harriss

 

 

Tel: 020 3328 5656

SP Angel Corporate Finance LLP, Financial Adviser & Broker

John Mackay/Laura Harrison

 

 

Tel: 020 3470 0470

St Brides Partners Ltd, Financial PR

Susie Geliher/Megan Dennison

 

 

Tel: 020 7236 1177

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMMGMDLRLGRZM
Date   Source Headline
21st Nov 20197:00 amRNSNew Replacement Exploration Licences
21st Nov 20197:00 amRNSESIA and Bulk Sample Update
31st Oct 20195:00 pmRNSTotal Voting Rights
28th Oct 201911:31 amRNS£250,000 Fundraise
23rd Oct 20191:45 pmRNSDirectorate Change
3rd Oct 20197:00 amRNSESIA Update
30th Sep 20194:14 pmRNSResult of AGM
19th Sep 20197:00 amRNSESIA Update
18th Sep 20197:00 amRNSBougouni Project Development & Exploration Update
2nd Sep 20197:00 amRNSFinal Results
30th Aug 20195:00 pmRNSTotal Voting Rights and Directors' Shareholding
23rd Aug 20191:15 pmRNSESIA Lodged for the Bougouni Lithium Project, Mali
20th Aug 20197:00 amRNSUpdate on Metallurgical Test Work Results
14th Aug 201911:00 amRNSIssue of Equity Update
12th Aug 20197:00 amRNSIssue of Equity Update
6th Aug 20197:00 amRNSIssue of Equity Update
2nd Aug 20195:01 pmRNSIssue of Equity and Change to Total Voting Rights
29th Jul 20199:05 amRNSSecond Price Monitoring Extn
29th Jul 20199:00 amRNSPrice Monitoring Extension
29th Jul 20197:00 amRNSIssue of Equity
12th Jul 20194:41 pmRNSSecond Price Monitoring Extn
12th Jul 20194:36 pmRNSPrice Monitoring Extension
10th Jul 201912:45 pmRNSPresentation at Investor Conference
2nd Jul 20191:07 pmRNSDirectorate Change
26th Jun 20197:30 amRNSDrilling Programme Commences
31st May 20194:40 pmRNSSecond Price Monitoring Extn
31st May 20194:35 pmRNSPrice Monitoring Extension
31st May 20199:06 amRNSSecond Price Monitoring Extn
31st May 20199:00 amRNSPrice Monitoring Extension
31st May 20197:00 amRNSUpdate on Development and Exploration Activities
8th May 20197:00 amRNSBoard Appointment and Issue of Share Options
18th Apr 20197:00 amRNSBoard Appointment and Issue of Options
29th Mar 20195:00 pmRNSTotal Voting Rights
11th Mar 20197:00 amRNSPlacing to raise £700,000
28th Feb 20194:30 pmRNSTotal Voting Rights
28th Feb 20197:00 amRNSUpdated JORC Mineral Resource Estimate
12th Feb 20197:00 amRNSBougouni Final Assay Results
4th Feb 20197:00 amRNSIssue of Equity and Change to Total Voting Rights
30th Jan 20197:00 amRNSAcquisition of Additional Exploration Concessions
25th Jan 20197:00 amRNSFurther High-Grade Lithium Intersections
18th Jan 20197:00 amRNSBougouni Lithium Project Update
14th Dec 20189:29 amRNSReplacement: Interim Results
14th Dec 20187:00 amRNSInterim Results
6th Dec 20187:00 amRNSGold Exploration Joint Venture Update
26th Nov 20187:00 amRNSBougouni Lithium Project Update
23rd Nov 20189:11 amRNSAppointment of Project Manager
15th Nov 201810:53 amRNSReplacement: Bougouni Project update
15th Nov 20189:22 amRNSBougouni Project Update
13th Nov 20187:00 amRNSAssay Results for the First Diamond Drill Holes
24th Oct 20182:10 pmRNSMalian Delegation Visits Ruifu Lithium Corporation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.