Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKistos Holdings Regulatory News (KIST)

Share Price Information for Kistos Holdings (KIST)

Share Price is delayed by 15 minutes
Get Live Data
262.50    2.50 (0.96%)
Bid:
260.00
Ask:
265.00
Spread: 5.00 (1.923%)
Market Cap: £218.18m
KIST Live PriceLast checked at - London Stock Exchange

Intraday Kistos Holdings Share Chart

Operational Update

15 Nov 2021 07:00

RNS Number : 3115S
Kistos PLC
15 November 2021
 

Kistos plc

("Kistos" or the "Company")

Operational update

Kistos (LSE: KIST), the low carbon intensity energy producer pursuing a strategy to acquire assets with a role in energy transition, is pleased to announce that that Borr Drilling's Prospector-1 jack-up drilling rig has left the Q10-A field (Kistos 60%) and arrived on location at the Q11-B discovery (Kistos 60%). The spudding of the appraisal well is expected later this week.

 

The Q11-B appraisal well represents the concluding planned activity in our 2021 drilling campaign and is anticipated to take a minimum of 6 weeks to drill and test. It is intended that the well will be suspended for future use in a Q11-B development. Kistos has previously estimated 2C resources for this accumulation of between 67 - 155 Bcf net. This estimate was independently audited by Sproule and will be refined following review of all the data from the forthcoming well.

 

At the Q10-A field, we have completed a successful drilling campaign, highlighted by the appraisal of the Vlieland sandstone formation in the Q07 and Q10 blocks. As previously announced, it flowed oil to surface at a maximum stable rate of 3,200 barrels of oil per day (bopd). Pressure-volume-temperature (PVT) analysis of downhole samples has confirmed a light oil of 33° API, with a low sulphur content. No formation water was produced or sampled on test. Work is ongoing to integrate the data into our subsurface models. Work has also begun on the development concept.

 

Following the testing of the Vlieland formation, a sidetrack was drilled from the Q10-A04-A wellbore at high angle through the Zechstein carbonates and clastics and completed in the primary Slochteren formation at a TVDss of 2,319 metres. Following data acquisition, the well is now producing gas from the Slochteren reservoir at a gross rate of ~800,000 Nm3/d (~5,080 boe/d) with the other horizons currently shut-in for reservoir management purposes. Following the completion of drilling and intervention activities on the Q10-A field, gross gas production has reached approximately 2,000,000 Nm3/d (12,700 boe/d).

 

Commenting, Andrew Austin, Kistos' Chairman, said:

"One of the key attractions of the Kistos portfolio is the significant near-term upside potential and I was delighted when I was able to announce the extremely positive results from the appraisal well in the Vlieland sandstone. This success continued with the positive result from the sidetrack of the Q10-A04-A well, which has added materially to our production at a time of high gas prices. I am now looking forward to reporting the result of the Q11-B appraisal well in the coming weeks."

 

ENDS

 

 

Enquiries:

Kistos plc

Andrew Austin

 

 

c/o Camarco Tel: 020 3757 4983

Panmure Gordon

Nick Lovering / Atholl Tweedie / James Sinclair-Ford

 

 

Tel: 020 7886 2500

Berenberg

Emily Morris / Alamgir Ahmed

 

Tel: 020 3207 7800

Camarco

Billy Clegg / James Crothers

 

Tel: 020 3757 4983

 

Notes to editors

Kistos plc was established to acquire and manage companies in the energy sector engaging in the energy transition trend. The Company has acquired Tulip Oil Netherlands B.V., which has a portfolio of assets, including profitable, highly cash generative natural gas production, plus appraisal and exploration opportunities. The Company has 19.5 mmboe of 2P reserves and an additional 102.1 mmboe of contingent resources.

Kistos is a low carbon producer. The Q10-A gas field in the Dutch North Sea (60% operated working interest) has recorded a Scope 1 carbon emissions intensity of 13g CO2e/boe since inception. This compares to an industry average of 22kg CO2/boe for gas extracted from the UK continental shelf. The Q10-A normally unmanned installation is located approximately 20 km from the Dutch shore. It is powered sustainably via wind and solar power and is remotely operated, limiting offshore visits, which are conducted by boat.

https://kistosplc.com/ 

 

Dr Richard Benmore, Non-Executive Director of Kistos with a Bachelors, Masters and PhD in Geosciences and who has been involved in the energy industry for more than 37 years, has read and approved the disclosure in this announcement.

The Company's internal estimates of resources contained in this announcement were prepared in accordance with the Petroleum Resource Management System guidelines endorsed by the Society of Petroleum Engineers, World Petroleum Congress, American Association of Petroleum Geologists and Society of Petroleum Evaluation Engineers.

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 (as it forms part of retained EU law as defined in the European Union (Withdrawal) Act 2018).

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDGPGQAGUPGPGC
Date   Source Headline
12th May 202612:34 pmRNSBlock Admission Return
11th May 20267:00 amRNSDirector/PDMR Shareholding
8th May 20267:00 amRNSDirector/PDMR Shareholding
1st May 20267:00 amRNSPricing of Nordic Bond Issue
22nd Apr 20267:00 amRNSTrading Statement
4th Mar 20267:00 amRNSLTIP Awards
18th Feb 20267:00 amRNSBlock Admission Return
13th Feb 202612:07 pmRNSCorrection - Total Number of Ordinary Shares
10th Feb 20267:00 amRNSRestricted Share Units, PDMR Dealing, TVR
8th Jan 20267:00 amRNSTrading Statement and Operational Update
9th Dec 20257:00 amRNSAcquisition - Block 9 and Block 3 & 4, Oman
21st Oct 20257:00 amRNSBlock Admission Application
23rd Sep 20257:00 amRNSInterim Results & Hole House FID
10th Sep 20257:00 amRNSTrading Statement and Production Update
21st Aug 20257:00 amRNSCapital Reduction Update
3rd Jul 20257:00 amRNSIssue of Class C Warrants
30th Jun 20251:00 pmRNSResults of AGM
30th Jun 202510:08 amRNSBlock Admission Application
23rd Jun 20257:13 amRNSJotun FPSO First Oil
18th Jun 20257:00 amRNSBalder Phase VI FID
16th Jun 20257:00 amRNSTR-1
5th Jun 20257:00 amRNSNotice of AGM
2nd Jun 20257:00 amRNSCancellation of KENAS bonds
11th Apr 20257:00 amRNS2024 Full Year Results
13th Mar 20257:00 amRNSJotun FPSO Sail Away
6th Mar 202512:00 pmRNSTR-1
4th Mar 20257:00 amRNSGrant of Awards - Equity Incentive Plan
8th Jan 20257:00 amRNSTrading Statement
31st Dec 20247:00 amRNSAppointment of CFO
11th Nov 20247:00 amRNSTidal Power Investment
2nd Oct 20247:00 amRNSDirectorate Change
25th Sep 20247:00 amRNSInterim results
21st Aug 202412:00 pmRNSBalder X Project Update
21st Aug 20247:00 amRNS33rd Offshore Licencing Round
19th Aug 20247:00 amRNSPDMR Participation in SIP
5th Aug 20247:00 amRNSGrant of Options, Adoption of SIP & PDMR Dealings
19th Jul 20242:05 pmRNSResults of AGM
3rd Jul 20247:00 amRNSNotice of AGM
28th Jun 20247:00 amRNSHill Top Gas Storage Update
19th Jun 20247:00 amRNSDirectorate Changes
13th May 20247:00 amRNSFull-year results for the year ended 31/12/23
23rd Apr 20247:00 amRNSAcquisition Completion of Gas Storage Assets
20th Feb 20247:00 amRNSUK Onshore Gas Storage Assets
13th Feb 20247:00 amRNSBalder Field Operational Update
18th Jan 20247:00 amRNSDevelopment Approval for Victory Gas Field
18th Dec 20237:00 amRNSProduction restarted at Shetland Gas Plant
12th Dec 20237:00 amRNSShetland Gas Plant update
11th Dec 20237:00 amRNSRedemption of Kistos NL2 bonds
6th Dec 20235:55 pmRNSTotalEnergies Statement re the Shetland Gas Plant
28th Sep 20237:00 amRNSInterim results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.