The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.50
Bid: 3.40
Ask: 3.60
Change: 0.00 (0.00%)
Spread: 0.20 (5.882%)
Open: 3.50
High: 3.50
Low: 3.50
Prev. Close: 3.50
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

PFS Update for the Amapa Project

21 Mar 2022 07:00

RNS Number : 4141F
Cadence Minerals PLC
21 March 2022
 

Cadence Minerals Plc

("Cadence Minerals", "Cadence" or "the Company")

 

Cadence Provides PFS Update for the Amapa Iron Ore Project & Appoints Wardell Armstrong as PFS Manager

Cadence Minerals (AIM/AQX: KDNC; OTC: KDNCY) is pleased to provide an update on the ongoing Pre-Feasibility Study ("PFS") at its flagship Amapa Iron Ore Project ("Amapa" or "Amapa Project"). 

Amapa is a substantial integrated mine, beneficiation plant, railway and port in the northeast of Brazil. It was previously owned by Anglo American (70%) and Cliffs (30%) and at its peak produced up to 6.1 million tonnes ("Mt") of iron ore concentrate per year.

Highlights

· Cadence have now acquired 27% of the Amapa Project, which is being fast-tracked through development and eventually to production.

· PFS commissioning based on producing 5.3 Mt per annum, 4.9Mt is anticipated to be a 65% iron ore concentrate.

· Wardell Armstrong International Ltd, a leading, globally recognised mining consultancy, has been appointed the PFS Manager of the Amapa Project.

· Work is on track to deliver a high-quality PFS for the Amapa Project

Cadence CEO, Kiran Morzaria, commented: "The Amapa Mine has all the attributes of a significant iron ore deposit, and the upgraded Mineral Resource Estimate of 176.7m tonnes grading 39.7% Fe at the Inferred category provides the Cadence board with great confidence in our investment decision."

 

"As we see the world move towards decarbonisation and as manufacturers seek to minimise their carbon footprint, the planned production of a >65% Fe concentrate utlising predominantly renewable energy really does highlight the potential for the Amapa mine, rail and port infrastructure to deliver a lower emission iron ore product to our customers."

 

"Completion of the PFS will be an important step towards unlocking the value of this deposit and I look forward to providing progress updates in the coming weeks."

 

Amapa Pre Feasibility Study and Wardell Armstrong Appointment

The Pre Feasibility Study ("PFS") began on the Amapa Project late last year and is based on producing 5.3 Mt of iron ore concentrate per annum. We expect to produce 4.9Mt of the higher quality, lower carbon footprint 65% iron ore concentrate which, as of the date of this announcement, trades at approximately US$170 per dry tonne.

The PFS contemplates refurbishing and rehabilitating the existing port, rail and plant with modifications being made to the beneficiation plant to achieve a larger portion of 65% iron concentrate (4.9 Mt). In addition, an investigation is underway into optimisation opportunities and potential cost savings in the transportation of the iron ore concentrate, particularly in the areas of transhipment and movement of ore from the mine to the rail loadout.

Previous studies carried out by SRK consulting based on 2015 site visits and updated in 2019 to reflect changes in inflation and foreign exchange rates estimated the total level of capital expenditure for the project of approximately US$168.8 million (scoping study level accuracy). The same study estimated operating expenditure of about US$ 24 per dry tonne delivered free onboard from Amapa's port in Santana, Brazil.

All the other areas within the PFS are progressing as expected, with work underway on all critical areas, including mining, beneficiation, infrastructure, energy, tailings storage facilities, logistics and sales and marketing.

Cadence is also pleased to announce that it has appointed Wardell Armstrong International Ltd ("WAI") as PFS manager for the Amapa Project. WAI is a leading, globally recognised mining consultancy with a track record of conducting all levels of technical study required on projects that have successfully been financed and developed into full mining operations.

WAI are working closely with all our consultants to deliver the lowest cost and capital expenditure possible, which represent huge advantages for any mining operation, particularly for construction and project financing.

About the Amapa Project

Amapa commenced operations in December 2007 with the first production of iron ore concentrate product of 712 kt in 2008. In 2008 Anglo American (70%) and Cliffs (30%) acquired the Amapa Project in 2008 as part of a larger package of mining assets in Brazil.

Production steadily increased to 4.8 Mt and 6.1 Mt of iron ore concentrate product in 2011 and 2012. During this period, Anglo American reported operating profits from its 70% ownership in the Amapa Project of US$ 120 million (100% US$ 171 million) and US$ 54 million (100% US$ 77 million). Before its sale in 2012, Anglo American valued its 70% stake in the Amapa Project at US$ 866 million (100% US$ 1.2 billion). It impaired the asset in its 2012 Annual Accounts to US$ 462 million (100% US$ 660 million).

Cadence updated the Mineral Resource Estimate on November 2nd 2020, increasing the MRE by 21%. The current MRE contains a Mineral Resource of 176.7 million tonnes grading 39.7% Fe in the Indicated category and Mineral Resource of 8.7Mt at 36.9% in the Inferred category, both reported within an optimised pit shell and using a cut-off grade of 25% Fe.

Details of Ownership and Joint Venture Agreement

Cadence owns 27% of the Amapa Project, with our joint venture partner, Indo Sino Pty Ltd ("Indo Sino"), owning the remaining 73%. The ownership of Amapa is via a joint venture company, Pedra Branca Alliance Pte. Ltd. ("JV Co"), which owns 100% of the equity of DEV Mineração S.A. ("DEV"). Should Indo Sino seek further investors or an investment in the JV Co, Cadence has a first right of refusal to increase its stake to 49%. If Cadence does not exercise its right of first refusal under the terms, Indo Sino will have a twelve-month option to buy the shares in JV Co held by Cadence for 1.5 times the price paid by Cadence for such shares.

 

- Ends -

 

For further information:

Cadence Minerals plc

+44 (0) 7879 584153

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

Darshan Patel

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding Cadence Minerals Plc's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCSEFSMFEESELD
Date   Source Headline
7th Oct 20227:00 amRNSMineral Resource Increase & Upgrade Amapá Project
28th Sep 20227:00 amRNSInterim Results for six months ended 30 June 2022
10th Aug 20223:50 pmRNSResult of AGM
12th Jul 20227:00 amRNSDirector Share Purchases
7th Jul 20222:58 pmRNSNotice of AGM
27th Jun 20227:00 amRNSCompletion of LT & LS sale & Amapa Project Update
23rd Jun 20227:00 amRNSSale of Yangibana JV Interest to Hastings
21st Jun 20227:00 amRNSAnnual Results for the year ended 31 December 2021
25th Apr 20228:53 amRNS4th Amapa Iron Ore Shipment Completed & En Route
19th Apr 20227:00 amRNSExercise of Warrants
11th Apr 202211:14 amRNSDirector Share Purchases
7th Apr 20229:50 amRNSCommencement of Shipment of Iron Ore from Amapa
30th Mar 20227:00 amRNSConditional Sale Agreement of its Stake in LT & LS
21st Mar 20227:00 amRNSPFS Update for the Amapa Project
15th Mar 20229:28 amRNSCadence completes to vest its 27% in Amapa Project
21st Feb 20223:42 pmRNSResult of Open Offer
21st Feb 20227:00 amRNSYangibana Project NPV Increases 84% to A$1bn
7th Feb 20227:00 amRNSAmapa - Formal Completion & Vesting of 20%
4th Feb 20221:45 pmRNSOpen Offer and Posting of Circular
3rd Feb 20229:05 amRNSSecond Price Monitoring Extn
3rd Feb 20229:00 amRNSPrice Monitoring Extension
3rd Feb 20227:00 amRNSResult of Placing & Subscription and TVR
2nd Feb 20224:40 pmRNSProposed Placing
2nd Feb 20221:54 pmRNSNAIF A$140m Loan - Yangibana Rare Earths Project
19th Jan 20222:05 pmRNSEMH Cinovec PFS Update - Outstanding Results
14th Jan 20227:00 amRNSProject & Corporate Updates. Presentation Q&A
5th Jan 20227:00 amRNSQuestions for Investor Q&A Session
29th Dec 202111:06 amRNSSecond Price Monitoring Extn
29th Dec 202111:00 amRNSPrice Monitoring Extension
29th Dec 20219:06 amRNSSecond Price Monitoring Extn
29th Dec 20219:00 amRNSPrice Monitoring Extension
29th Dec 20217:00 amRNSAmapa Iron Ore Project Update
25th Nov 202111:45 amRNSCastillo Extends Option Over Lithium Projects
22nd Nov 20218:57 amRNSCastillo Copper Picasso Lithium Project Update
1st Nov 20219:01 amRNSPort Concession Update, Amapa Project
27th Oct 20219:50 amRNSCastillo - Picasso Lithium Project Site Visit
20th Oct 202111:43 amRNSLitchfield Lithium surface sampling by Castillo
13th Oct 202110:27 amRNSEuropean Metals Cinovec Resource Upgrade
11th Oct 202111:05 amRNSSecond Price Monitoring Extn
11th Oct 202111:00 amRNSPrice Monitoring Extension
11th Oct 20219:05 amRNSSecond Price Monitoring Extn
11th Oct 20219:00 amRNSPrice Monitoring Extension
11th Oct 20217:00 amRNSBank Credit Committee Approval for Amapa Project
7th Oct 202112:19 pmRNSCastillo Litchfield Lithium Due Diligence Update
29th Sep 20217:01 amRNSOption Granted to Castillo to Acquire Projects
26th Aug 202112:00 pmRNSInterim Results
25th Aug 20213:58 pmRNSMacarthur Lake Giles Feasibility Study Progress
23rd Aug 20217:00 amRNSMacarthur Lakes Giles Feasibility Study Progress
18th Aug 20213:06 pmRNSYangibana Rare Earth Joint Venture Update
12th Aug 20212:39 pmRNSMacarthur Lake Giles Geotech Drill Programme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.