Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJUB.L Regulatory News (JUB)

  • There is currently no data for JUB

Testing Results

5 Sep 2011 07:00

RNS Number : 6021N
Jubilant Energy N.V.
05 September 2011
 



5 September 2011

 

Jubilant Energy N.V.

("Jubilant" or "the Company")

 

Testing results of the first development well KSG-57 of phase-III campaign in Kharsang Field

 

Jubilant is pleased to announce the testing results of the first development well KSG-57 (earlier referred to as "KPL-A") drilled under the Phase-III development drilling campaign in the Kharsang field. The well was spudded on 28th July 2011 and was successfully drilled to 875 meters measured depth (800 meter true vertical depth) on 15th August 2011, on time and within budget. The well was tested with a smaller capacity work-over rig, which was deployed at the site on 21st August 2011.

 

Based on wireline log interpretation results, formation pressure data from Sequential Formation Testing and Side Wall Core results, the consortium identified four separate intervals, totalling 20 meters of net sand, for testing of shallow C-50 and D-00 Girujan targeted reservoirs.

 

Upon testing the D-00 sands interval between 786-793 meters and activation through swabbing, the well started self-flowing. The well is presently flowing through 5.56 millimetre choke at a rate of around 170-180 barrels of oil per day (bopd), with Gas-Oil-Ratio of 30 volume by volume and maximum flowing tubing head pressure of 11 Kg/cm2. The initial results are as expected and encouraging. The production from the well is being sent to the Oil Collecting Station (OCS) for further processing.

 

The KSG-57 well will continue to remain under extended production testing to carry out a multi choke study till production is optimized. The testing of the remaining 11 meters of the two shallower sands will be completed at a later date.

 

GeoEnpro Petroleum Ltd., a joint venture of GeoPetrol and Jubilant Enpro (a member of the wider Jubilant Bhartia Group), is the operator of the Kharsang Field. Jubilant holds a 25% interest in the block through its subsidiary, Jubilant Energy (Kharsang) Pvt Ltd. The other members of the consortium are Oil India Ltd and GeoPetrol.

 

For further information, please contact:

 

Jubilant Energy

Ajay Khandelwal, Vipul Agarwal

+91 120 402 5700

Evolution Securities

Matthew Tyler, Romil Patel

+44 20 7071 4300

Renaissance Capital

David Dalhuisen

+44 20 7367 7777

College Hill

Nick Elwes, Alexandra Roper

+44 20 7457 2020

 

Competent Person's Consent for Release: Maxwell Birley, BSc in Geological Geophysics, the Company's Chief Operating Officer has 30 years of international experience in the exploration and production industry. He has reviewed and approved the technical information contained in this announcement pursuant to the AIM guidance note for mining and oil and gas companies.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEELBBFKFZBBX
Date   Source Headline
2nd Aug 20117:00 amRNSEXIM Bank Loan Agreement
29th Jul 20117:00 amRNSDrilling Update
19th Jul 20117:00 amRNSDrilling Update
18th Jul 20117:00 amRNSSeismic Acquisition
6th Jul 20117:00 amRNSNotice of AGM
30th Jun 20117:00 amRNSFinal Results
27th Apr 20117:00 amRNSExtension of contract area
18th Apr 20117:00 amRNSDrilling update - Golaghat Block
5th Apr 20117:00 amRNSTrading Statement & Operational Update
21st Mar 20118:07 amRNSCommencement of drilling
16th Feb 20112:25 pmRNSResult of EGM
17th Jan 20117:00 amRNSProposed appointment of NED
4th Jan 20117:00 amRNSCommencement of drilling
17th Dec 20107:00 amRNSInterim Results
24th Nov 20108:06 amRNSAdmission to trading and completion of placing
6th Oct 20061:12 pmBUSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.