The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJadestone Energy Regulatory News (JSE)

Share Price Information for Jadestone Energy (JSE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 26.75
Bid: 26.50
Ask: 27.00
Change: -0.50 (-1.83%)
Spread: 0.50 (1.887%)
Open: 27.25
High: 27.25
Low: 26.75
Prev. Close: 27.25
JSE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Montara Operations Update

20 Jun 2022 07:00

RNS Number : 4352P
Jadestone Energy PLC
20 June 2022
 

Jadestone Energy 

Montara Operations Update

 

20 June 2022 - Singapore: Jadestone Energy plc ("Jadestone", or the "Company") an independent oil and gas production company focused on the Asia-Pacific region, provides the following update on operations at the Montara field offshore Australia.

 

On 17 June 2022 during routine production and crude oil cargo operations, crude oil was being transferred between two crude oil tanks onboard the Montara Venture FPSO. During the transfer, oil was observed on the surface of the sea adjacent to the FPSO. Transfer operations were ceased immediately and production from the Montara fields was shut in as a precautionary measure.

 

The release of oil to sea was quickly halted by pumping water into the tank, indicating a leak somewhere at the tank base. A subsequent inspection using an ROV confirmed a small 30mm diameter hole in the bottom of the tank. Having now controlled the release of oil, the next step will be to apply a temporary repair in order to remove the remaining oil from the tank. Following this, the tank will be accessed and cleaned in order to complete an inspection and permanent repair. This is the same work plan which has already been applied to all the other main crude oil storage tanks, as part of the five yearly inspection and repair programme which has been underway since Jadestone assumed operatorship of the Montara assets, and which is a normal and accepted process approved by regulators and Class inspectors globally.

 

The volume of released oil is estimated at three to five cubic metres, which was monitored and had fully dispersed by the morning of 19 June 2022. The National Offshore Petroleum Safety and Environmental Management Authority ("NOPSEMA") was notified of the incident immediately and will initiate an onsite inspection of the Montara facilities on 21 June 2022.

 

Jadestone's preliminary estimate is that it will take approximately four weeks to complete the tank inspection and effect repairs sufficient to re-commence production at Montara, with appropriate isolation of the crude oil tank. Thereafter, following consultation with key stakeholders, a full remediation programme will be conducted, similar to that which has been completed on all the other main crude oil tanks. At this early stage, Jadestone estimates the cost of securing the leak site and permanent repair of the crude oil tank at US$2-3 million. This is consistent with the overall expenditure to date on the tank inspection and repair work, which totals US$11 million over the past three years.

 

On the basis that full production from the Montara fields can be restarted as estimated, Jadestone expects that full-year 2022 production would be around the lower end of the previously announced guidance range of 15,500 - 18,500 boe/d.

 

Paul Blakeley, President and CEO commented:

 

"Whilst we deeply regret this event, immediate and decisive action by the Jadestone team limited the quantity of oil released and made the facility safe, and I commend the work of both the offshore crew and the onshore operational staff for their quick response in managing this incident.

 

The integrity of our facilities is at the heart of our strategy and this oil tank was due for inspection within the next few weeks as part of our five-yearly maintenance cycle, which would have been the final key step in the significant inspection and repair plan that has been underway on the Montara Venture since we assumed operatorship in 2019. Over this period, we have worked extensively and spent significant sums to restore the vessel and associated infrastructure to the condition required in order to deliver a long, safe and productive field life.

 

Safety and sustainability are core values for Jadestone, and we will now work closely with the Class inspector, NOPSEMA and other stakeholders to develop and execute a plan to safely and permanently repair the hole in the crude oil tank. There are many precedents for this type of activity, both within the Asia-Pacific region and globally, and we will deploy the necessary expertise to provide confidence in the solution we implement. It's particularly frustrating for this event to occur so close to the planned inspection and repair activity, but our investment in the facilities to date is bearing fruit, with facility uptime now over 90% and with further improvements in the planning stage."

 

 

-ends-

 

For further information, please contact:

 

Jadestone Energy plc

Paul Blakeley, President and CEO

+65 6324 0359 (Singapore)

Phil Corbett, Investor Relations Manager

+44 7392 940 495 (UK)

ir@jadestone-energy.com

 

Stifel Nicolaus Europe Limited (Nomad, Joint Broker)

+44 (0) 20 7710 7600 (UK)

Callum Stewart

Jason Grossman

Ashton Clanfield

 

Jefferies International Limited (Joint Broker)

+44 (0) 20 7029 8000 (UK)

Tony White

Will Soutar

 

Camarco (Public Relations Advisor)

+44 (0) 203 757 4980 (UK)

Billy Clegg

jse@camarco.co.uk

Georgia Edmonds

James Crothers

 

 

About Jadestone Energy

 

Jadestone Energy plc is an independent oil and gas company focused on the Asia-Pacific region. It has a balanced, low risk, full cycle portfolio of development, production and exploration assets in Australia, Malaysia, Indonesia and Vietnam.

 

The Company has a 100% operated working interest in the Stag oilfield and in the Montara project, both offshore Australia. Both the Stag and Montara assets include oil producing fields, with further development and exploration potential. The Company also has interests in four oil producing licences offshore Peninsular Malaysia; two operated and two non-operated positions. Further, the Company has a 100% operated working interest in two gas development blocks in Southwest Vietnam, and an operated 100% interest (assuming completion of the Hexindo stake acquisition, as announced in November 2021) in the Lemang PSC, onshore Sumatra, Indonesia, which includes the Akatara gas field development.

 

In addition, the Company has executed a sale and purchase agreement to acquire a 69% operated working interest in the Maari Project, shallow water offshore New Zealand, and is working with the seller to obtain final New Zealand government approvals. 

 

Led by an experienced management team with a track record of delivery, who were core to the successful growth of Talisman's business in Asia, the Company is pursuing an acquisition strategy focused on growth and creating value through identifying, acquiring, developing and operating assets in the Asia-Pacific region.

 

Jadestone Energy plc is listed on the AIM market of the London Stock Exchange. The Company is headquartered in Singapore. For further information on the Company please visit www.jadestone-energy.com.

 

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No. 596/2014 which is part of UK law by virtue of the European Union (Withdrawal) Act 2018.

 

Glossary

 

FPSO

floating, production storage and offloading vessel

ROV

remote operated vehicle

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEBLBLLQLXBBX
Date   Source Headline
17th Apr 20247:00 amRNSAdmission of Shares to Trading on AIM
11th Apr 202410:30 amRNSRestoration - Jadestone Energy plc
11th Apr 202410:13 amRNSRestoration of Trading on AIM
10th Apr 20247:00 amRNSRBL Update and Notice of Results
27th Mar 20241:06 pmRNSBoard Changes
25th Mar 20247:00 amRNSBoard Changes
22nd Mar 20247:00 amRNSAMENDMENT: Share Awards and Director Share Dealing
18th Mar 20247:00 amRNSVesting of Share Awards and Director Share Dealing
28th Feb 20247:00 amRNSJadestone to present at Shares Investor Event
26th Feb 20247:00 amRNSBlock Listing Six Monthly Return
23rd Feb 20247:00 amRNSProposed Board Changes
14th Feb 20247:00 amRNSCompletion of CWLH Oil Fields Interest Acquisition
13th Feb 20247:34 amRNSResponse to Media Speculation & Trading Suspension
13th Feb 20247:30 amRNSSuspension - Jadestone Energy PLC
31st Jan 20247:02 amRNSTrading update for the year ended 31 December 2023
26th Jan 20247:25 amRNSGas Sales Agreement Signed for NDUM in Vietnam
25th Jan 20247:01 amRNSAppointment of Independent Non-Executive Director
25th Jan 20247:00 amRNSAppointment of Joint Corporate Broker
15th Jan 20247:00 amRNS2024 Guidance and Corporate Update
21st Dec 20237:00 amRNSInterim GHG Emissions Reduction Targets
4th Dec 20237:00 amRNSMalaysia Drilling and Corporate Update
14th Nov 20237:00 amRNSAcquisition of CWLH field interest
13th Nov 20237:00 amRNSOperational Update
18th Oct 20237:00 amRNSAppointment of Non-Executive Director
9th Oct 20237:00 amRNSFinancing and Operational Update
19th Sep 20237:00 amRNS2023 Half Year Results
7th Sep 20237:00 amRNSMontara Update
5th Sep 20237:00 amRNSNotice of first-half 2023 results
31st Aug 20239:27 amRNSMontara Restart Plan and Operations Update
29th Aug 20237:00 amRNSBlock Listing Six Monthly Return
23rd Aug 20237:08 amRNSMontara Operations Update
10th Aug 20232:32 pmRNSMontara Operations Update
31st Jul 20237:00 amRNSMontara Operations Update
20th Jul 20237:00 amRNSTrading update for half-year ending 30 June 2023
14th Jul 20233:58 pmRNSTR-1: Notification of major holdings
5th Jul 20237:00 amRNSInvestor Presentation via Investor Meet Company
30th Jun 202310:13 amRNSResults of AGM
30th Jun 20237:00 amRNSCorporate Update
29th Jun 20237:00 amRNSResult of the Open Offer and Total Voting Rights
19th Jun 202311:15 amRNSTR-1: Notification of major holdings
15th Jun 202312:36 pmRNSTR-1: Notification of major holdings
12th Jun 20237:01 amRNSTR1: Notification of Major Holdings
12th Jun 20237:00 amRNSTR1: Notification of Major Holdings
9th Jun 20238:00 amRNSAdmission and Commencement of Open Offer
7th Jun 20237:02 amRNSAvailability of Annual Report and Notice of AGM
7th Jun 20237:00 amRNSResults of Financing
6th Jun 20234:58 pmRNSProposed Financing
25th May 20237:05 amRNSAmended Notice of Results
22nd May 202312:53 pmRNSClosing of US$200 million RBL Facility
19th May 202311:16 amRNSSigning of US$200 million RBL Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.