Q3

2012

 

Q3

2011

Change

%

 

Production (boepd)

 

 

7,740

 

8,779

 

-11.8

Gas Production (MMcfd)

 

34.3

40.8

-15.9

Oil Production (bopd)

2,023

1,983

+2.0

Realised gas price ($ per Mcf)

10.92

10.10

+8.1

Realised oil price ($ per barrel)

87.04

104.64

-16.8

Realised LPG price ($ per tonne)

 

995.54

1,065.00

-6.5

 

Highlights

 

·; Good progress in increasing Russian gas production with current rates in excess of 50% of plant capacity (40 MMcfd)

 

·; Award of Rudenkovskoye multi-stage frac contract with preparatory work ongoing for project execution in spring 2013

 

·; 3D seismic acquisition underway in Zaplavskoye exploration licence in Ukraine following well Z-04 exploration success

 

·; Commencement of stand-alone development of Elizavetovskoye licence in Ukraine with production planned for the second half of 2013.

 

 

JKX Chief Executive, Dr Paul Davies, said:

"We are encouraged by the progress made on the three producing wells at our Russian gas plant and we remain on course to reach plant capacity of 40 MMcfd in the first half of 2013. Preparations for the Rudenkovskoye multi-frac project in Ukraine next spring are on-schedule with results of the initial injectivity test expected next month.

 

"We are achieving strong oil, gas and LPG realisations in Ukraine and are beginning to see an improving revenue stream from our Russian development. We anticipate average daily production in the fourth quarter to reach 10,000 boepd."

 

For further information, please contact:

Anthony Cardew/Nadja Vetter/Alexandra Stoneham, Cardew Group 020 7930 0777

 

Production

Ukraine: Average production in the third quarter was 6,840 boepd comprising 29.2 MMcfd of gas and 1975 bpd of oil and condensate, with LPG sales averaging 56 tons per day.

 

Russia: Average production in the third quarter was 737 boepd comprising 4.4 MMcfd of gas.

 

Hungary: Net production from the Hajdunanas Field in the third quarter was 164boepd comprising 0.7 MMcfd of gas and 49 bpd of oil and condensate (JKX share: 50%).

 

Outlook: We anticipate average production in the fourth quarter to be approximately 10,000 boepd.

 

 

Ukraine

Development and Workover Activity: Preparation of the R-103 well for the forthcoming multi-stage frac in spring 2013 was completed in the period utilising the Skytop rig. This comprised the replacement of the 1,200m long slotted liner with a cemented liner, and the subsequent installation of the redesigned production tubing. An initial injectivity test on the formation is planned for the fourth quarter to test the jet perforating system and confirm/refine frac design parameters.

 

Workover and completion activity continue using the Company's TW-100 rig. Highlights of the third quarter programme include:

 

·; recompletion of Wedge Zone well M-170 to include additional perforations in the less productive zones of the lower Devonian reservoir. Initial flow was 3.9 MMcfd of gas with 304 bcpd. Current production is 1.5 MMcfd of gas with 100 bcpd.

 

·; recompletion of exploration well Z-04 to the deeper V-26 reservoir was reported at the end of the last quarter. The well continues to produce at 1.5 MMcfd with a much reduced condensate flow, suggesting some hold up.

 

·; recompletion of IG-126 as a pilot water injection well in the Ignatovskoye Visean carbonate reservoir. The well is now taking all produced water from the field with the effect expected to be seen in communicating wells by year end. Other water injection schemes are under consideration.

 

Production Facilities: The processing plant, including the LPG system, is subject to continuous modification to optimise production. The most recent modifications to the K-220 compressor have enabled it to increase production from the lower pressure gas wells. Plans have also been approved to modify the LPG plant to increase the propane yield.

 

Geology & Geophysics:The original 3D seismic database over the main part of the NovoNikolaevskoye complex has been reprocessed using the latest techniques to aid definition of fault patterns and refine horizon identification. This will be used initially to re-map the Wedge Zone M-170 area and the lower Devonian potential identified there. The other key study area will be the Molchanovskoye North oil and gas reservoirs where defining the individual fault blocks will be the key to effective pressure maintenance.

 

Acquisition of 40 km2 of 3D seismic began in September in the recently acquired extension of the Zaplavskoye exploration licence, and interpretation of these data will be used to map the extent of the Z-04 Visean discovery and integrate that information with the historical wells database.

 

Integration of these seismic interpretations into the updated field models will define targets for 2013 with drilling expected to recommence in the first quarter of the coming year.

 

Elizavetovskoye Licence: JKX is the sole licence holder and receives 33.3% of the production under a Joint Production Agreement from the wells which were drilled by the previous licence holder. Production from well M-53 continues at around 2.7 MMcfd and work progresses to add well M-52 production to the separation and metering facilities at the East Machevka gathering point which will also be upgraded.

 

Details of the stand-alone development and drilling programme are being finalised with permitting of the export line and approval of the development plan expected by year-end. Production is scheduled to commence during the second half of 2013 from the new development well E-301.

 

 

Russia

Development and Workover Activity: Progress is being made in bringing the existing production wells up to the expected production rates:

 

·; the well 27 sidetrack was completed in July and the well was put into production in August as planned, prior to stimulation. Acetic acid stimulation has now been completed using coiled tubing, and the well is currently cleaning up. To date it has doubled its production rate to more than 9 MMcfd. A decision on whether to further enhance production by running hydrochloric acid stimulation will be taken once the well is fully cleaned up.

 

·; the blockage in well 20 was cleared using coiled tubing and acetic acid. The well was then stimulated successfully using a larger acetic acid squeeze and production is now steady at around 15 MMcfd. However, pressure measurements suggest that there is scope for further enhancement and preparations are being made for hydrochloric acid stimulation of this well.

·; the Geostream rig has now moved onto well 25 and is preparing to drill a sidetrack and recomplete the well.

·; coiled tubing was also run in well 05 and, although good progress was made inside the tubing, it became evident that the annulus was blocked with sediment and/or corrosion products and there was a leak in the tubing. The well will now require a rig intervention to recover the tubing and drill a sidetrack to the Oxfordian reservoir.

·; the Callovian appraisal well 09 will be re-entered in the first half of next year.

 

Facilities: The gas processing plant has operated steadily despite initial production levels being as low as 10% of design capacity. Minor problems have been encountered, but these have generally been overcome as they arose.

 

Production is currently exceeding 20 MMcfd (50% of plant capacity) and further improvements are expected during the last quarter. The Company remains on target to achieve full plant capacity during the first half of 2013.

 

Exploration: The 170.7 sq km Georgievskoye exploration licence was awarded in May and the exploration programme is being finalised for approval by the State authorities. Purchase and processing of existing seismic data on the block should commence in early 2013.

 

 

Hungary

Development Activity: The Hadjunanas field (JKX: 50%) produces from two wells. Well Hn-1, having been recompleted as a Miocene oil producer with new separation facilities, began production in June and averaged 80 bopd with 80 bwpd through the third quarter. It continues to produce with a high water cut but a recent rise in reservoir pressure suggests that there is a significant hydrocarbon system supporting the oil production. Well Hn-2 was in production until August averaging 1.5 MMcfd with 35 bcpd and over 100 bwpd when water breakthrough killed the well. A recompletion to another gas horizon is being planned.

 

Exploration: Hernad licences: JKX holds a 50% equity interest in the two Hernad licences in the northern Pannonian Basin. There was no drilling activity during the period but a number of small prospects are being evaluated for drilling in 2013.

 

Veszto licence: JKX holds a 25% equity interest in a 15.6 sq km part of the Veszto exploration licence in the east Hungarian Pannonian Basin. The operator is continuing the evaluation of appraisal locations and a further well is under consideration for 2013, following award of the Mining Plot.

 

Turkeve area: Exploration well Ny-7 (JKX: 50%) made asignificant gas discovery in the Turkeve area in 2011. However, the proportion of CO2 (25%) requires a more complex treatment plant. The operator is evaluating treatment and development options but nothing has been settled and production is unlikely before the second half of 2013.

 

 

Bulgaria

Exploration: JKX has an 18% carried interest in the 1,787 sq km Provadia licence operated by Overgas. The 2011 380 km 2D seismic survey has been evaluated and a further 119 km of follow-up 2D data were acquired during the third quarter. Processing is underway and interpretation should start later in the fourth quarter.

 

 

Slovakia

Exploration: JKX holds a 25% equity interest in the Svidnik, Medzilaborce and Snina exploration licences in the Carpathian fold belt in north east Slovakia. The Cierne-1 exploration well location in the westernmost Svidnik licence has been identified and an extensive aero-gravity survey was acquired during the third quarter. This is now being processed and the results will be incorporated into the well recommendation for a spud date of 2013 or 2014.

 

ENDS

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSDELFFLBFZFBD
Date   Source Headline
13th Oct 20177:00 amRNSOperational Update
22nd Sep 20177:00 amRNSHolding(s) in Company
11th Sep 20177:00 amRNSAugust 2017 Monthly Production Report
10th Aug 20177:00 amRNSJuly 2017 Production Report
1st Aug 20177:00 amRNSHalf-year Report
31st Jul 20175:51 pmRNSDirectorate and Advisor Changes
13th Jul 20177:00 amRNSJune 2017 Monthly Production Report
12th Jul 20177:00 amRNSSection 430 of the Companies Act 2006 Announcement
30th Jun 20172:55 pmRNSPost AGM Board Update
30th Jun 201711:12 amRNSResult of AGM
13th Jun 20177:00 amRNSMay 2017 Monthly Production Report
25th May 20173:23 pmRNSNotice of AGM
19th May 20177:00 amRNSFurther update on request from Eclairs Group
17th May 20177:00 amRNSInitiation Rudenkivske field stimulation program
16th May 20177:00 amRNSApril 2017 Monthly Production Report
12th May 20171:18 pmRNSReplacement: Update on request from Eclairs Group
12th May 20179:22 amRNSUpdate on request from Eclairs Group Limited
9th May 20177:00 amRNSUpdate on request from Eclairs Group Limited
5th May 20173:35 pmRNSS 338 Request
5th May 20177:00 amRNSConsolidated report on payments to governments
27th Apr 20177:00 amRNSMAILING OF ANNUAL REPORT AND ACCOUNTS 2016
20th Apr 20177:00 amRNSS 338 Request
11th Apr 20177:00 amRNSMarch 2017 Monthly Production Report
21st Mar 20177:00 amRNSHigh Court Claim by Ukraine
20th Mar 20177:00 amRNSFinal Results to 31 December 2016
17th Mar 20177:00 amRNSNotice of Preliminary Results and Presentation
14th Mar 20177:00 amRNSFebruary 2017 Monthly Production Report
1st Mar 20177:00 amRNSOperational Update: A Year in Review
15th Feb 20177:00 amRNSJanuary 2017 Monthly Production Report
7th Feb 20174:36 pmRNSTribunal Award - Update
6th Feb 20173:38 pmRNSTribunal Award
25th Jan 20177:00 amRNSPolice Inspection in Kyiv
17th Jan 20179:28 amRNSDecember 2016 Production Report (replacement)
17th Jan 20178:06 amRNSDecember 2016 Monthly Production Report
12th Jan 20177:00 amRNSPolice inspection in Poltava
3rd Jan 20173:19 pmRNSResults of Consent Solicitation
30th Dec 20163:17 pmRNSInternational arbitration update
13th Dec 20162:05 pmRNSSecond Price Monitoring Extn
13th Dec 20162:00 pmRNSPrice Monitoring Extension
12th Dec 20167:00 amRNSNovember 2016 Monthly Production Report
9th Dec 20167:00 amRNSRestructuring of Convertible Bonds
23rd Nov 20167:00 amRNSOctober 2016 Monthly Production Report
19th Oct 20167:00 amRNSRepurchase of Convertible Bonds
6th Oct 20167:00 amRNSAppointment of Corporate Broker
23rd Sep 20167:00 amRNSRepurchase of Convertible Bonds
21st Sep 20167:00 amRNSOperational Update
29th Jul 20167:00 amRNSHalf-Yearly Results to 30 June 2016
25th Jul 20167:00 amRNSFurther update on police investigation in Poltava
13th Jul 20169:06 amRNSUpdate on police investigation in Poltava
30th Jun 20161:54 pmRNSReport on Payments to Govts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.