Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJKX.L Regulatory News (JKX)

  • There is currently no data for JKX

Interim Management Statement

16 May 2008 07:00

RNS Number : 6034U
JKX Oil & Gas PLC
16 May 2008
 



 6 Cavendish Square, London W1G 0PDEnglandUK

Tel: +44 (0)20 7323 4464 Fax: +44 (0)20 7323 5258

Web site: http://www.jkx.co.uk 

FOR IMMEDIATE RELEASE

16 MAY 2008

JKX Oil & Gas plc

INTERIM MANAGEMENT STATEMENT FOR THE FIRST QUARTER ENDING 30 MARCH 2008

Q1 Q1 Change

2008 2007

Production (boepd) 11,494 13,524 [15%]

Oil Production (bopd) 4,687 6,283 [25%]

Gas Production (MMcfd) 41 43 [5%]

Realised oil price (per barrel) 81.03 51.60 57%

Realised gas price (per Mcf) 5.18 3.91 32%

JKX has made good progress across all its licence areas in the first quarter and has continued to benefit from rising oil and gas prices. The Company is focused on its development programmes in both Ukraine and Russia in addition to its exploration activities across its broadening portfolio.

Ukraine

Development activity is primarily focused on increasing gas production capacity ahead of the Soyuz tie-in and further development and appraisal of the Tournasian carbonate reservoir. The latter programme is proceeding, although production figures for the period reflect the regulatory requirement to test even modest deeper reservoirs if they appear to be hydrocarbon bearing before testing and completion of the overlying carbonate. Lower liquids production in the quarter reflects the concentration during the period on the gas appraisal programme.

An acid fracture stimulation programme has been developed for lower permeability Tournasian carbonates in parts of the Ignatovskoye and Molchanovskoye field extensions and, as a precursor to implementation of the programme in the field, injectivity tests on Well I131 and Well M162 have been completed successfully.

On the Rudenkovskoye Field, the special core analysis (SCAL) programme is reaching completion and a production logging run is imminent. Once these are complete, the fracture programmes will be finalised and equipment mobilised to commence testing towards the end of the third quarter. 

Delivery of outstanding equipment for the connection to the Soyuz gas pipeline is expected in JuneTime has been allocated in the schedule for State inspectors to complete all regulatory aspects and approve the final connection. Subject to the foregoing, commissioning is currently scheduled to commence in August. 

Drilling

 

Poltava Petroleum Company ("PPC") has drilled two new development wells and one new appraisal well this year. 

Well M164, a horizontal development well in the northern area of the Molchanovskoye Field, flowed gas at 7.4 MMcfd with 1,200 bpd of condensate at a well head pressure of 1,460 psi from the Devonian sandstone.

Well I136, a development well drilled on the north flank of the Ignatovskoye Field, failed to produce oil from the depleted lowermost carbonate section and will be recompleted in the overlying gas reservoir. Well I134, an appraisal well to the west of the main Ignatovskoye Field, tested water from the lowermost Tournasian sandstone and is awaiting recompletion, stimulation and testing of the overlying gas-bearing Tournasian carbonate. 

As reported earlier, PPC also completed appraisal Well I133 in the Tournasian sandstone at a flow rate of 3.7 MMcfd and 560 bpd of condensate, and development Well M159 which flowed at 1.4 MMcfd and 100 bpd of condensate from the Tournasian carbonate; subsequent acid treatment increased this rate to 7.0 MMcfd and 400 bpd of condensate.

The Skytop rig is now drilling development Well I163 and will continue drilling activity in the field area through 2008 and 2009. A new workover rig has been purchased and will commence operations in late May with a full programme of well repairs and re-completions planned for the remainder of 2008.

Reserves

 

History matching and modelling of the reservoirs in the Ignatovskoye, Molchanovskoye and Novo-Nikolaevskoye licences are nearing completion. Revised proved plus probable reserves for these licences will be published at the beginning of the third quarter.

Russia

Yuzhgasenergie ("YGE"), JKX's wholly owned subsidiary, completed the full 105 sq km 3D seismic over the Koshekhablskoye Field, and processing has now commenced. The objective is to select a target for the deeper Callovian reservoir exploration well by mid August, with more detailed evaluation of the overlying Oxfordian carbonate reservoir features to follow. Early results from the processing indicate a successful survey revealing much useful data.

The Kremco 900 rig has been contracted for the Oxfordian reservoir workover programme. The first well pad is ready and the second is under construction with workover operations due to commence towards the end of June. 

A coiled tubing unit has also been contracted from Poland and is due on the field around the end of July to commence stimulation and production testing of the wells as soon as they have been rehabilitated and recompleted.

Following detailed inspection of the existing gas processing facilities, a decision has been made to replace rather than refurbish the facility at the field. Initial design of the replacement facilities is nearing completion and purchase orders for the first long lead items have been placed. Some elements of the sour gas removal plant have been found to have much longer than anticipated delivery times which may affect YGE's fast track target of sales gas delivery by the year-end.

 

Exploration

 

Ukraine:

 

Evaluation of the Zaplavskoye licence which adjoins the southern part of PPC's production licence areas has continued with two wells planned for the second half of the year. The 42 sq km 3D seismic programme on the Chervonoyarske East Licence is in progress. Regrettably, no progress has been achieved in negotiations with the state oil and gas company to date on access to the three existing wells on our Elizavetovskoye licence.

South East Bismil Licences, Turkey:

 

 As reported in January, JKX acquired a 20% interest in the two Bismil South licences covering an area of 590 sq km and lying just to the south of the Koyunlu-1 heavy oil discovery south of Batman in southeast Turkey. The licences are operated by the private Turkish company Arar Petrol Ve Gaz Aup AS. The acquisition of 120 km of 2D seismic has been completed and the Koyunlu-2 well drilled to a TD of 1,310m. The well came in about 70m up-dip of the existing discovery well with oil shows in the Cretaceous Garzan limestone reservoir at 1,130m. However, no oil was recovered in the DST. The well was deepened to the secondary Mardin objective but a second DST proved that this too was tight. The well will now be plugged and abandoned. Evaluation of the seismic in the remaining parts of the block will now continue, encouraged by the discovery of light oil in the adjacent block to the west in deeper Palaeozoic sediments.

Karakilise LicencesTurkey:

 

The Hakan Yilmaz-1 well is currently drilling in the north of the Karakilise licence area in southeasTurkey. The operator is Aladdin Middle East and JKX holds a 30% interest in the licences. 

Hungary Licences:

 

 The 350 sq km 3D survey acquired in late 2007 has been processed and the first drillable targets identified. The initial well is expected to spud in the second quarter. The Hernad licences cover an area of 5,420 sq km in northeast Hungary and JKX holds a 50% interest.

Slovakia Licences:

 

As reported in April, JKX farmed into three blocks in the Slovakian Carpathian fold belt covering a total of 2278 sq km. The operator is Aurelian Oil & Gas plc and JKX's interest is 25%. A 238 km 2D seismic survey is planned for later in 2008.

USA Licence:

 

Newfield Exploration has taken over operatorship in the West Huxley Deep Unit in east Texas and intends to spud a new well in this quarter. JKX holds a 34.3% interest but does not view this holding as core to its programme and expects to seek an exit at an appropriate time.

Disposal

 

As reported in February, JKX sold its wholly owned subsidiary, JKX Italia Ltd, to Mediterranean Oil & Gas plc and no longer has any holdings in Italy.

JKX Chief Executive, Dr Paul Davies, said

 

"The Company has made good progress in the first quarter. Material production increases in Ukraine await the tie-in to the Soyuz line in the second half of the yearMeanwhile, our most recent development Well M164 which was completed this month has come on stream at more than 2,200 boepd, demonstrating again the productive potential of our Ukrainian licences. The new project iRussia is moving ahead with the aim of re-establishing production from the field by year end."

 

ENDS

For further information please contact: 

Sofia Rehman / Anthony Cardew

Cardew Group

020 7930 0777

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSDELFFVEBFBBZ
Date   Source Headline
13th Oct 20177:00 amRNSOperational Update
22nd Sep 20177:00 amRNSHolding(s) in Company
11th Sep 20177:00 amRNSAugust 2017 Monthly Production Report
10th Aug 20177:00 amRNSJuly 2017 Production Report
1st Aug 20177:00 amRNSHalf-year Report
31st Jul 20175:51 pmRNSDirectorate and Advisor Changes
13th Jul 20177:00 amRNSJune 2017 Monthly Production Report
12th Jul 20177:00 amRNSSection 430 of the Companies Act 2006 Announcement
30th Jun 20172:55 pmRNSPost AGM Board Update
30th Jun 201711:12 amRNSResult of AGM
13th Jun 20177:00 amRNSMay 2017 Monthly Production Report
25th May 20173:23 pmRNSNotice of AGM
19th May 20177:00 amRNSFurther update on request from Eclairs Group
17th May 20177:00 amRNSInitiation Rudenkivske field stimulation program
16th May 20177:00 amRNSApril 2017 Monthly Production Report
12th May 20171:18 pmRNSReplacement: Update on request from Eclairs Group
12th May 20179:22 amRNSUpdate on request from Eclairs Group Limited
9th May 20177:00 amRNSUpdate on request from Eclairs Group Limited
5th May 20173:35 pmRNSS 338 Request
5th May 20177:00 amRNSConsolidated report on payments to governments
27th Apr 20177:00 amRNSMAILING OF ANNUAL REPORT AND ACCOUNTS 2016
20th Apr 20177:00 amRNSS 338 Request
11th Apr 20177:00 amRNSMarch 2017 Monthly Production Report
21st Mar 20177:00 amRNSHigh Court Claim by Ukraine
20th Mar 20177:00 amRNSFinal Results to 31 December 2016
17th Mar 20177:00 amRNSNotice of Preliminary Results and Presentation
14th Mar 20177:00 amRNSFebruary 2017 Monthly Production Report
1st Mar 20177:00 amRNSOperational Update: A Year in Review
15th Feb 20177:00 amRNSJanuary 2017 Monthly Production Report
7th Feb 20174:36 pmRNSTribunal Award - Update
6th Feb 20173:38 pmRNSTribunal Award
25th Jan 20177:00 amRNSPolice Inspection in Kyiv
17th Jan 20179:28 amRNSDecember 2016 Production Report (replacement)
17th Jan 20178:06 amRNSDecember 2016 Monthly Production Report
12th Jan 20177:00 amRNSPolice inspection in Poltava
3rd Jan 20173:19 pmRNSResults of Consent Solicitation
30th Dec 20163:17 pmRNSInternational arbitration update
13th Dec 20162:05 pmRNSSecond Price Monitoring Extn
13th Dec 20162:00 pmRNSPrice Monitoring Extension
12th Dec 20167:00 amRNSNovember 2016 Monthly Production Report
9th Dec 20167:00 amRNSRestructuring of Convertible Bonds
23rd Nov 20167:00 amRNSOctober 2016 Monthly Production Report
19th Oct 20167:00 amRNSRepurchase of Convertible Bonds
6th Oct 20167:00 amRNSAppointment of Corporate Broker
23rd Sep 20167:00 amRNSRepurchase of Convertible Bonds
21st Sep 20167:00 amRNSOperational Update
29th Jul 20167:00 amRNSHalf-Yearly Results to 30 June 2016
25th Jul 20167:00 amRNSFurther update on police investigation in Poltava
13th Jul 20169:06 amRNSUpdate on police investigation in Poltava
30th Jun 20161:54 pmRNSReport on Payments to Govts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.