George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJangada Mines Regulatory News (JAN)

Share Price Information for Jangada Mines (JAN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.30
Bid: 1.20
Ask: 1.40
Change: 0.00 (0.00%)
Spread: 0.20 (16.667%)
Open: 1.30
High: 1.30
Low: 1.30
Prev. Close: 1.30
JAN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Investee Company Update: Blencowe Resources PLC

6 Dec 2022 10:58

RNS Number : 7676I
Jangada Mines PLC
06 December 2022
 

Jangada Mines plc / EPIC: JAN.L / Market: AIM / Sector: Mining

6 December 2022

Jangada Mines plc ('Jangada')

 

Investee Company Update: Blencowe Resources PLC

 

Jangada Mines plc is pleased to note the announcement released by Blencowe Resources PLC (LON:BRES) in which it holds a c. 9.5% interest. The announcement is set out below without material changes.  

 

Start of Blencowe Resources PLC announcement

 

Blencowe Resources

 

Successful Further Metallurgical Test Work for

Orom-Cross Graphite Project Sets-Up Bulk Sample Test Phase

 

Larger sample confirms same high quality end product as previous metallurgical test work

 

Highlights:

· Blencowe successfully completes critical metallurgical test work on substantially up-scaled quantities of Orom-Cross composite mix, as per what was previously tested by SGS in Canada.

· Results continue to highlight a high grade, low impurity concentrate can be delivered from Orom-Cross.

· Duplication of bench scale testing results now completed through to bulk sample test stage.

· Test work completed by leading Australian metallurgical test firm IMO.

· Blencowe now has considerably more volume of end product to send to interested end users for testing.

 

Blencowe Resources Plc ("Blencowe" or the "Company"), is pleased to announce that additional metallurgical test work on its Orom-Cross graphite project in Northern Uganda has been completed by leading technical specialist firm IMO based in Perth, Australia. This work is critical to understanding the quality of the end-product that Orom-Cross can deliver as a high-grade graphite concentrate, as well as what the process flow will look like to achieve this on a pre-commercial scale. It also provides significantly greater quantum of end product for end user testing which is critical for the Definitive Feasibility Study.

 

Blencowe appointed IMO to undertake metallurgical test work on material gathered from its drilling campaigns which covered both the Northern Syncline and Camp lode areas within Orom-Cross. The program was designed to deliver the following objectives:

1. Confirm a 95-97% TGC (Total Graphite Content) pure concentrate is possible with low impurities (Thorium and Vanadium).

2. Confirm ~90% recovery is achievable for this concentrate.

3. Confirm the liberation process in order to maintain a high percentage of Jumbo/XL/Large flakes within the concentrate.

4. Confirm the process flow diagram for plant design as part of the Definitive Feasibility Study.

5. Deliver bulk concentrate samples to allow Blencowe to initiate discussions with potential off-take partners.

 

Blencowe is pleased to announce that all 5 objectives have been met or exceeded in this latest round of test work. Open cycle floatation testing produced recoveries between 90-92% and concentrate grades consistently range between 95-98% which are battery grade.

 

The additional metallurgical test work was commissioned to test the upgradeability of the bench scale test work completed by SGS in Lakefield. A total of 1,400kg was processed (as compared to 100kg within SGS test work) and all metallurgical test-work undertaken to date shows a robust flowsheet capable of repeatable metallurgy for a wide range of feed samples from Orom-Cross.

 

A total of eight rougher and cleaner flotation tests were carried out on the Master composite that culminated in the flowsheet that is atypical of similar graphite projects. The flowsheet consists of a flash and rougher flotation stage followed by a primary cleaning circuit with a polishing mill followed by three stages of cleaner flotation. The intermediate concentrate is classified and then further upgraded in secondary cleaning circuits with stirred media mills (SMM) followed by cleaner flotation.

The proposed flowsheet was employed in a continuous pilot operation to determine the metallurgical response under typical operating conditions. The final concentrate graded 96.4% C(t) at 90.6% total carbon recovery which exceeded the company's expectations and places the end product recovered at the higher end of the spectrum in comparison to its peers. 

 

Test work was focussed on the 5 points above and not geared towards optimising the flake size fractions. As the resultant splits using an unoptimised circuit are within 5% of the fractions as determined by the original SGS bench scale works there may be further incremental value to be added by optimising ahead. The key takeaway from these results is that the scaling factors in the metallurgical testing will likely replicate the original test work and results through to commercial scale production.

 

At the end of this larger scale metallurgical program, approximately 80kg of concentrate was produced (versus 5-8kgs from SGS in Canada) which will be forwarded to potential end-users and project partners for additional test work on screening splits and grade analysis, as well as suitability for further downstream processing of the concentrate.

 

The design of the processing plant will be based on both the SGS and IMO test-work and best practice in similar operations. Importantly, the process requires no primary crushing or grinding of the ore, thus preserving the larger flake sizes, which is a material advantage over hard-rock graphite deposits.

 

Executive Chairman Cameron Pearce commented: "We are delighted with these IMO met test results as they not only continue to underpin Orom-Cross concentrate as high quality in all key areas relevant to end users but the test work has highlighted that we can now deliver these end results on a much greater scale of raw material as processed. This is a key steps towards commercial stage production testing in a pilot plant facility. It also highlights the potential to increase the percentage of the more valuable coarse flake products through further optimisation of the processing circuits and this will be considered in the next round of testing. 

 

"This latest set of results sets us up nicely for the bulk sample trial we will be conducting on 100 tonnes of Orom-Cross composite in 1H 2023 and if these same results are produced from that exercise we will be largely pre-qualified in terms of end products delivered as concentrate."

 

End of Blencowe Resources PLC announcement

 

**ENDS**

 

For further information please visit www.jangadamines.com or contact:

 

Jangada Mines plc

Brian McMaster (Chairman)

Tel: +44 (0)20 7317 6629

Strand Hanson Limited

(Nominated & Financial Adviser)

Ritchie Balmer

James Spinney

Tel: +44 (0)20 7409 3494

Tavira Securities Limited

(Broker)

Jonathan Evans

Tel: +44 (0)20 7100 5100

St Brides Partners Ltd

(Financial PR)

Ana Ribeiro

Isabel de Salis

jangada@stbridespartners.co.uk

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDFLFEIFELRIIF
Date   Source Headline
15th Apr 20248:59 amRNSInvestee Company Update: Blencowe Resources PLC
10th Apr 202410:37 amRNSInvestee Company Update: Blencowe Resources
6th Feb 20248:35 amRNSInvestee Company Update: Blencowe Resources
29th Jan 20248:26 amRNSInvestee Company Update: Blencowe Resources
25th Jan 20248:53 amRNSInvestee Company Update: Blencowe Resources
2nd Jan 202410:10 amRNSInvestee Company Update: Blencowe Resources
18th Dec 20237:00 amRNSInvestee Company Update: Fodere Titanium
22nd Sep 20237:33 amRNSInvestee Company Update: Blencowe Resources PLC
8th Sep 20238:20 amRNSInterim Results
4th Sep 20238:55 amRNSInvestee Company Update: Blencowe Resources
28th Jul 202311:33 amRNSResult of AGM
4th Jul 20238:23 amRNSNotice of AGM
29th Jun 20237:02 amRNSFinal Results
19th Jun 202312:38 pmRNSCorrection - Investee Company Update
19th Jun 20239:23 amRNSInvestee Company Update: Blencowe Resources PLC
18th May 20239:52 amRNSInvestee Company Update: Blencowe Resources PLC
28th Apr 20237:00 amRNSInvestee Company Update: Blencowe Resources PLC
13th Apr 20237:00 amRNSPitombeiras Update
25th Jan 20232:05 pmRNSSecond Price Monitoring Extn
25th Jan 20232:00 pmRNSPrice Monitoring Extension
25th Jan 20237:00 amRNSCorporate Update
23rd Jan 202311:46 amRNSInvestee Company Update: Blencowe Resources PLC
16th Jan 20238:35 amRNSInvestee Company Update: Blencowe Resources PLC
11th Jan 20237:10 amRNSInvestee Company Update: Blencowe Resources PLC
6th Dec 202210:58 amRNSInvestee Company Update: Blencowe Resources PLC
26th Oct 20227:00 amRNSStrategic Investment
26th Sep 20227:42 amRNSHalf-year Report
15th Aug 20227:00 amRNSConsideration Shares Received from ValOre
1st Aug 202210:06 amRNSResult of AGM
26th Jul 20227:00 amRNSNew Presentation & Website
8th Jul 20224:41 pmRNSSecond Price Monitoring Extn
8th Jul 20224:36 pmRNSPrice Monitoring Extension
8th Jul 20222:05 pmRNSSecond Price Monitoring Extn
8th Jul 20222:00 pmRNSPrice Monitoring Extension
28th Jun 20224:41 pmRNSSecond Price Monitoring Extn
28th Jun 20224:35 pmRNSPrice Monitoring Extension
28th Jun 20222:06 pmRNSSecond Price Monitoring Extn
28th Jun 20222:00 pmRNSPrice Monitoring Extension
28th Jun 202211:05 amRNSSecond Price Monitoring Extn
28th Jun 202211:00 amRNSPrice Monitoring Extension
28th Jun 20229:05 amRNSSecond Price Monitoring Extn
28th Jun 20229:00 amRNSPrice Monitoring Extension
28th Jun 20227:00 amRNSFinal Results
3rd May 20227:00 amRNSQ&A Following Publication of Technical Report
27th Apr 20224:41 pmRNSSecond Price Monitoring Extn
27th Apr 20224:35 pmRNSPrice Monitoring Extension
21st Apr 20224:41 pmRNSSecond Price Monitoring Extn
21st Apr 20224:35 pmRNSPrice Monitoring Extension
21st Apr 20222:06 pmRNSSecond Price Monitoring Extn
21st Apr 20222:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.