Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJangada Mines Regulatory News (JAN)

Share Price Information for Jangada Mines (JAN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.25
Bid: 1.20
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.10 (8.333%)
Open: 1.25
High: 1.25
Low: 1.25
Prev. Close: 1.25
JAN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Additional Cobalt & Chrome By-Product Credits

16 Aug 2017 07:00

RNS Number : 1264O
Jangada Mines PLC
16 August 2017
 

Jangada Mines plc / EPIC: JAN.L / Market: AIM / Sector: Mining

16 August 2017

 Jangada Mines plc ('Jangada' or the 'Company')

High Value JORC Compliant Cobalt and Chrome Resources Confirmed

For the Pedra Branca Platinum Group Metals Project

 

Jangada Mines plc, a natural resources company developing South America's largest and most advanced platinum group metals ('PGM') project, is pleased to announce an updated JORC (2012) compliant resource estimate at the Company's Pedra Branca PGM project ('the Project') in Ceará State, north-eastern Brazil, which now includes cobalt and chrome by-product credits.

 

Overview

· Global resources now include 1 million ounces of PGM+Au, 109 Mlbs of nickel, 23 Mlbs of copper, 6.4 Mlbs of cobalt and 600kt of chrome

· Global resource grade increased by 93% to 2.5 g/t from 1.3 g/t palladium equivalent ('PdEq')

· Contributions from by-product credits, including cobalt, chrome, nickel, and copper, give an additional in-situ value of approximately USD700 million or USD33 a tonne

· Subject to metallurgy, credits may significantly offset the cost of production leading to enhanced profitability

 

Brian McMaster, Executive Chairman of Jangada said, "The additional cobalt and chrome credits follow on the heels of the extra nickel and copper credits and translate into significant additional potential value to be unlocked at Pedra Branca. Our current global resources now include 1 million ounces of PGM+Au, 109 Mlbs of nickel, 23 Mlbs of copper, 6.4 Mlbs of cobalt and 600kt of chrome. We have now commenced metallurgical test work to understand the optimum extraction process for these metals as part of the PFS, which we expect will demonstrate the strong economics of the Project.

 

"We have what we believe to be a highly valuable asset. Our plan remains to work towards the commencement of trial mining and then commercial production at an initial rate of 30,000 ounces PGMs per annum within 12-18 months."

 

Further Information

The Pedra Branca Project is the largest and most advanced PGM project in South America and currently has a JORC compliant resource of approximately 1 million ounces of PGM+Au at a grade of 2.46 g/t Pd Eq, 109 Mlbs of Ni and 23 Mlbs of Cu, 6.4 million pounds of Co and 600k tonnes of Cr. The Project is located 280 km from the port city of Fortaleza in the northeast of Brazil and consists of three mining licenses and 44 exploration licenses over an area of 55,000 ha.

 

Previous operators have spent more than USD35 million on exploration and development activities, which include more than 30,000 metres of diamond core drilling, geophysical surveys and metallurgical tests. The current resources are at surface and Jangada is currently preparing a pre-feasibility study assuming shallow open pit mining and conventional processing methods.

 

As a continuation of the resource estimation work already conducted, GE21 Consultoria Mineral ("GE21") has considered the potential for further by-product credits relating to additional minerals. This work has resulted in a substantial increase in the resource estimation as follows.

 

Cobalt

The resource upgrade identifies substantial cobalt credits. Based on drilling to date, which includes more than 30,000 metres of diamond drilling, the identified cobalt resource is approximately 6.4 million pounds at a grade of 0.013% Co. At current cobalt prices, this represents a potential in-situ increase to the ore value of approximately USD170 million or USD7.80 per tonne, subject to recovery rates. The addition of the cobalt by-product credits represents a substantial increase in the PdEq for the Project as summarised below:

· Global resource grade increased by 93% to 2.5 g/t from 1.3 g/t PdEq

o Curiú oxide deposit grade increased by 77% to 3.9 g/t from 2.2 g/t PdEq

o Esbarro deposit grade increased by 83% to 2.2 g/t from 1.2 g/t PdEq

 

Chrome

GE21 has also upgraded the resource estimate to account for chrome by-products, which includes the confirmation of localised higher-grade ('Type 2') chrome horizons within the PGM ore zones. Based on the drilling to date, which includes more than 30,000 metres of diamond drilling, the identified Type 2 chrome resource is approximately 670kt at 8% Cr2O3 plus an additional JORC (2012) compliant exploration target of between 600kt and 1.2mt grading 5% to 10% Cr2O3.

 

At current chrome ore prices, the Type 2 chrome horizons at the Project have the potential to add between USD55 million and USD80 million to the in-situ ore value or circa USD15 per tonne within the chrome ore horizon.

 

Overall Potential

The Project currently has a JORC (2012) compliant resource of approximately 1 million ounces of PGM+Au with additional by-product credits totalling 109 Mlbs of Ni, 23 Mlbs of Cu, 6.4 million pounds of cobalt and 600k tonnes of chrome. At current commodity prices, the basket of by-product elements adds approximately USD700 million (or USD33 per tonne) to the already existing PGM+Au.

 

Jangada's ability to access the value from these by-products will depend on the recovery rates identified from the metallurgy test work. Previous bench scale flotation work has demonstrated that the ore is amenable to milling and floating. Current test work will produce an optimised processing flow sheet to extract maximum value from the ore. The Company will further investigate the option to extract chrome by conventional physical separation such as gravity, dense media or magnetic separation.

 

 

 

 

 

 

Pedra Branca Project - Grade Tonnage Table

Pedra Branca Deposit: Total Aggregated Mineral ResourceConsidered Equivalent Gold Cut-Off Grade: 0.30 g/t

Resource

Cr2O3Level

Tonnes (kt)

PGM (g/t)

Pd (g/t)

Pt (g/t)

Au (g/t)

Cu (%)

Ni (%)

Cr2O3

(%)

Co (ppm)

PGM (koz)

Pd (koz)

Pt (koz)

Au (koz)

Oxide

Measured

Type 2

27

1.008

0.636

0.361

0.011

0.051

0.225

6.238

131.3

0.89

0.56

0.32

0.01

Type 1

1 311

1.235

0.806

0.399

0.030

0.043

0.251

0.635

137.9

52.04

33.96

16.81

1.26

Indicated

Type 2

204

2.498

1.547

0.901

0.050

0.038

0.204

7.886

123.4

16.40

10.16

5.92

0.33

Type 1

3 630

1.479

0.887

0.554

0.038

0.044

0.228

0.608

130.1

172.62

103.5

64.60

4.49

Inferred

Type 2

208

1.940

1.069

0.836

0.036

0.033

0.220

7.527

121.9

13.00

7.16

5.60

0.24

Type 1

3 427

1.919

1.137

0.763

0.019

0.041

0.199

0.875

124.7

211.42

125.2

84.08

2.05

Sub

8 808

1.647

0.991

0.626

0.030

0.042

0.219

1.066

128.3

466.38

280.6

177.3

8.38

Transition

Measured

Type 2

53

1.854

1.061

0.763

0.030

0.049

0.220

19.4

149.6

3.14

1.80

1.29

0.05

Type 1

645

1.207

0.812

0.375

0.020

0.053

0.225

0.560

136.2

25.02

16.83

7.77

0.41

Indicated

Type 2

21

1.650

0.807

0.813

0.030

0.043

0.213

10.2

125.4

1.13

0.55

0.56

0.02

Type 1

1 513

1.303

0.834

0.435

0.033

0.052

0.218

0.538

126.7

63.39

40.59

21.18

1.62

Inferred

Type 2

74

1.114

0.655

0.404

0.055

0.029

0.193

5.671

124.1

2.64

1.55

0.96

0.13

Type 1

2 107

1.096

0.701

0.370

0.024

0.031

0.189

0.416

114.4

74.23

47.52

25.09

1.62

Sub

4 414

1.195

0.767

0.401

0.027

0.042

0.205

0.842

122.4

169.56

108.8

56.85

3.86

Sulphide

Measured

Type 2

14

1.170

0.708

0.439

0.023

0.040

0.242

11.74

142.2

0.54

0.33

0.20

0.01

Type 1

935

1.486

0.977

0.487

0.022

0.049

0.267

0.916

144.2

44.66

29.36

14.64

0.66

Indicated

Type 2

2

0.805

0.597

0.199

0.009

0.046

0.243

8.061

142.4

0.04

0.03

0.01

0.00

Type 1

2 567

0.999

0.566

0.394

0.039

0.045

0.223

0.494

128.2

82.48

46.6

32.55

3.25

Inferred

Type 2

61

1.582

0.805

0.665

0.111

0.061

0.221

5.092

137.8

3.13

1.59

1.31

0.22

Type 1

6 314

0.896

0.468

0.357

0.071

0.051

0.203

0.635

125.9

181.86

95.05

72.49

14.31

Sub

9 893

0.983

0.544

0.381

0.058

0.049

0.214

0.670

128.3

312.70

173.5

121.2

18.45

Grand Total

23 114

1.28

0.76

0.48

0.04

0.05

0.21

0.85

127.1

948.64

562.5

355.3

30.70

 

Competent Person Statement

The information in this statement which relates to the Mineral Resource is based on information compiled by Mr Bernardo H C Viana who is a geologist and full-time director and owner of GE21 and is registered as a Competent Person with the Australian Institute of Geoscientists. Mr Viana has sufficient relevant experience to the style of mineralization to qualify as a Competent Person as defined in the JORC Code (2012). Mr Viana also meets the requirements of a qualified person under the AIM Note for Mining, Oil and Gas Companies.

 

Cautionary Statements

The reader is cautioned that a Mineral Resource is an estimate only and not a precise and completely accurate calculation, being dependent on the interpretation of the limited information on the location, shape, and the continuity of the occurrence and the available sampling results. Actual mineralisation can be more or less than estimated depending upon the actual geological conditions. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. No Mineral Reserves are being stated.

 

 

* ENDS *

 

For further information, please visit www.jangadamines.com or contact:

 

Jangada Mines plc

E: info@jangadamines.com

Strand Hanson Limited (Financial & Nominated Adviser)

James Spinney / Ritchie Balmer

T: +44 (0)20 7409 3494

Beaufort Securities (Broker)

Jon Belliss

T: +44 (0)20 7382 8300

St Brides Partners LTD (Financial PR)

Hugo de Salis / Charlotte Heap

T: +44 (0)20 7236 1177

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCOKADBPBKKKFD
Date   Source Headline
15th Apr 20248:59 amRNSInvestee Company Update: Blencowe Resources PLC
10th Apr 202410:37 amRNSInvestee Company Update: Blencowe Resources
6th Feb 20248:35 amRNSInvestee Company Update: Blencowe Resources
29th Jan 20248:26 amRNSInvestee Company Update: Blencowe Resources
25th Jan 20248:53 amRNSInvestee Company Update: Blencowe Resources
2nd Jan 202410:10 amRNSInvestee Company Update: Blencowe Resources
18th Dec 20237:00 amRNSInvestee Company Update: Fodere Titanium
22nd Sep 20237:33 amRNSInvestee Company Update: Blencowe Resources PLC
8th Sep 20238:20 amRNSInterim Results
4th Sep 20238:55 amRNSInvestee Company Update: Blencowe Resources
28th Jul 202311:33 amRNSResult of AGM
4th Jul 20238:23 amRNSNotice of AGM
29th Jun 20237:02 amRNSFinal Results
19th Jun 202312:38 pmRNSCorrection - Investee Company Update
19th Jun 20239:23 amRNSInvestee Company Update: Blencowe Resources PLC
18th May 20239:52 amRNSInvestee Company Update: Blencowe Resources PLC
28th Apr 20237:00 amRNSInvestee Company Update: Blencowe Resources PLC
13th Apr 20237:00 amRNSPitombeiras Update
25th Jan 20232:05 pmRNSSecond Price Monitoring Extn
25th Jan 20232:00 pmRNSPrice Monitoring Extension
25th Jan 20237:00 amRNSCorporate Update
23rd Jan 202311:46 amRNSInvestee Company Update: Blencowe Resources PLC
16th Jan 20238:35 amRNSInvestee Company Update: Blencowe Resources PLC
11th Jan 20237:10 amRNSInvestee Company Update: Blencowe Resources PLC
6th Dec 202210:58 amRNSInvestee Company Update: Blencowe Resources PLC
26th Oct 20227:00 amRNSStrategic Investment
26th Sep 20227:42 amRNSHalf-year Report
15th Aug 20227:00 amRNSConsideration Shares Received from ValOre
1st Aug 202210:06 amRNSResult of AGM
26th Jul 20227:00 amRNSNew Presentation & Website
8th Jul 20224:41 pmRNSSecond Price Monitoring Extn
8th Jul 20224:36 pmRNSPrice Monitoring Extension
8th Jul 20222:05 pmRNSSecond Price Monitoring Extn
8th Jul 20222:00 pmRNSPrice Monitoring Extension
28th Jun 20224:41 pmRNSSecond Price Monitoring Extn
28th Jun 20224:35 pmRNSPrice Monitoring Extension
28th Jun 20222:06 pmRNSSecond Price Monitoring Extn
28th Jun 20222:00 pmRNSPrice Monitoring Extension
28th Jun 202211:05 amRNSSecond Price Monitoring Extn
28th Jun 202211:00 amRNSPrice Monitoring Extension
28th Jun 20229:05 amRNSSecond Price Monitoring Extn
28th Jun 20229:00 amRNSPrice Monitoring Extension
28th Jun 20227:00 amRNSFinal Results
3rd May 20227:00 amRNSQ&A Following Publication of Technical Report
27th Apr 20224:41 pmRNSSecond Price Monitoring Extn
27th Apr 20224:35 pmRNSPrice Monitoring Extension
21st Apr 20224:41 pmRNSSecond Price Monitoring Extn
21st Apr 20224:35 pmRNSPrice Monitoring Extension
21st Apr 20222:06 pmRNSSecond Price Monitoring Extn
21st Apr 20222:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.