Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksItm Power Regulatory News (ITM)

Share Price Information for Itm Power (ITM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 52.75
Bid: 52.15
Ask: 52.40
Change: 3.03 (6.09%)
Spread: 0.25 (0.479%)
Open: 48.80
High: 53.10
Low: 48.80
Prev. Close: 49.72
ITM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Re Government Air Quality Plan, Pipeline Increase

26 Jul 2017 14:24

RNS Number : 1815M
ITM Power PLC
26 July 2017
 

26 July 2017

 

ITM Power plc

("ITM Power", the "Group" or "the Company")

 

Response to UK Government's Air Quality Plan

Significant Pipeline Increase

 

ITM Power (AIM: ITM), the energy storage and clean fuel company, is pleased to note the planned publication by the UK Government of a revised Air Quality Plan, under which, according to media reports, it is proposed to ban the sale of petrol and diesel passenger cars (including hybrids) by 2040.

 

The new UK Government Air Quality Plan that bans all new non-zero emission passenger cars by 2040 represents an historic first step towards cleaner and greener transport in the UK.

 

ITM Power calls on the UK Government to provide equivalent financial support for fuel cell electric vehicles (FCEV) infrastructure as it has already provided for plug-in battery electric vehicle (BEV) infrastructure. Equivalent funding would satisfy the UK Government's stated position of being technology agnostic. The Company also calls on the Government to implement its announced plan to provide 65 hydrogen refuelling stations across the UK, to be operational by 2020. Current proposed levels of funding for hydrogen infrastructure would not achieve OLEV's stated target.

 

Significant pipeline increase, £6.57m in the last two weeks

Separately, ITM Power announces a significant increase in its order pipeline. The Company currently has £23.45m of projects under contract and £11.89m of contracts in the final stages of negotiation, totalling £35.34m (subject to exchange rate variation). This constitutes an increase of £6.57m of contracts in the final stages of negotiation since the last announcement on 11 July 2017.

 

For further information, please visit www.itm-power.com or contact:

 

ITM Power plc

Graham Cooley, CEO

+44 (0)114 244 5111

Investec Bank plc (Nominated Adviser and Broker)

Jeremy Ellis / Chris Sim / Jonathan Wynn

+44 (0)20 7597 5970

Tavistock

Simon Hudson / James Collins

+44 (0)20 7920 3150

 

Why fund FCEV infrastructure

FCEVs have a number of advantages over the plug in battery electric vehicle (BEV), although both are electric vehicles with the key difference being the way that the energy is transferred to the vehicle. BEVs store the energy in a battery; increased range requires more batteries, which makes vehicles heavier and less efficient. Increasing the range of a FCEV is achieved by making the hydrogen tank bigger which has only a small effect on the weight. The result is that hydrogen vehicles have a much longer range and can also be easily configured for heavy duty vehicles such as buses and haulage vehicles.

 

Refuelling time is also a key advantage of hydrogen electric drivetrains. Most FCEVs can be refuelled in three minutes under the SAE J2601 refuelling protocol. This allows for fuel forecourt dispensing as refuelling takes a similar time to petrol and diesel. Even with fast chargers, residing on forecourts for 30 minutes is impractical and so charging (for passenger cars) is likely to be at home, with limited range.

 

Perhaps the most significant potential future benefit of hydrogen fuelled vehicles is the effect on our existing infrastructure. Hydrogen produced by electrolysis (splitting water) can be used to store renewable power and to balance the electricity network (by using electrolysers that can be turned on and off rapidly), providing sub-second grid balancing services. The energy is, therefore, exported from the grid in a managed way by the grid operators (at the right time) rather than by the car owner. This is possible because hydrogen can be easily stored. In addition, the electrolysers are connected on the UK's higher voltage network which has overcapacity rather than plugging in BEVs on the low voltage network (at home) which is extremely expensive to reinforce because it is under the ground.

 

The efficiency and cost of electrolysis has also changed markedly over the past few years as volumes have increased. Electrolytic hydrogen made onsite now has cost parity with petrol and diesel in many parts of the world including the UK.

 

Despite the advantages listed above, the Company recognises that BEVs have a major role to play in cities to improve air quality and where range considerations and recharging times are less important. FCEVs however are the only currently available technology which can cost effectively address larger vehicles such as delivery vans and buses in city centres and long haul commercial vehicles throughout the UK.

 

About ITM Power plc

ITM Power manufactures integrated hydrogen energy solutions which are rapid response and high pressure that meet the requirements for grid balancing and energy storage services, and for the production of clean fuel for transport, renewable heat and chemicals. ITM Power plc was admitted to the AIM market of the London Stock Exchange in 2004. The Company received £4.9m as a strategic investment from JCB in March 2015. The Company signed a forecourt siting agreement with Shell in September 2015. The Group currently has £23.45m of projects under contract and a further £11.89m of contracts in the final stages of negotiation, totaling £35.34m (subject to exchange rate variation).

www.itm-power.com

 

-ends-

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
RSPOKADBNBKDDOB
Date   Source Headline
17th Nov 20215:10 pmRNSDirector/PDMR Shareholding
16th Nov 20211:07 pmRNSResignation of Tom Rae as Non-executive Director
15th Nov 202112:19 pmRNSResult of Meeting and Completion of Capital Raise
15th Nov 20217:00 amRNS12MW Electrolyser Sale
9th Nov 20217:00 amRNSIntention to Purchase Site for Second Giga Factory
5th Nov 20213:49 pmRNSBlock listing Six Month Return
1st Nov 20213:37 pmRNSTotal Voting Rights
29th Oct 202112:06 pmRNSResult of AGM
28th Oct 202112:50 pmRNSRe-Issue of Notice of General Meeting
18th Oct 20213:25 pmRNSDirector/PDMR Shareholding
15th Oct 20217:00 amRNSResults of Capital Raise and Notice of Meeting
14th Oct 20214:42 pmRNSDirector/PDMR Shareholding
14th Oct 20214:41 pmRNSTrading Update
14th Oct 20214:40 pmRNSProposed Accelerated Capital Raise
8th Oct 20217:00 amRNSFunding for Refhyne II
4th Oct 20214:19 pmRNSNotice of AGM
1st Oct 202111:27 amRNSTotal Voting Rights
15th Sep 20215:51 pmRNSDirector/PDMR Shareholding
13th Sep 20217:00 amRNSFinal Results
2nd Sep 20217:00 amRNSNotice of Results
1st Sep 20213:21 pmRNSTotal Voting Rights
17th Aug 20214:30 pmRNSDirector/PDMR Shareholding
17th Aug 20214:06 pmRNSGigafactory Official Opening, UK Hydrogen Strategy
2nd Aug 20215:37 pmRNSTotal Voting Rights
15th Jul 20214:39 pmRNSDirector/PDMR Shareholding
7th Jul 20217:36 amRNSSumitomo and Tokyo Gas Demonstration Project
2nd Jul 20212:10 pmRNSRefhyne I Start-up in Germany
1st Jul 20215:23 pmRNSTotal Voting Rights
28th Jun 20217:00 amRNSEnergy and Mining Ministry Delegation from Chile
16th Jun 20218:45 amRNSDirector/PDMR Shareholding
10th Jun 20217:00 amRNSTrading Update
1st Jun 202112:57 pmRNSTotal Voting Rights
19th May 20213:57 pmRNSDirector/PDMR Shareholding
18th May 20217:00 amRNSNotice of Trading Update and Investor Presentation
4th May 20214:16 pmRNSTotal Voting Rights
4th May 20217:00 amRNSITM Motive Becomes a Separate Limited Company
19th Apr 20217:00 amRNSElectrolyser Sale to Linde for H2Pioneer, Austria
15th Apr 202110:00 amRNSDirector/PDMR Shareholding
12th Apr 20217:00 amRNS20MW Electrolyser with ScottishPower, UK’s Largest
9th Apr 20212:11 pmRNSGreen Hydrogen Project with Linde Engineering
8th Apr 202110:31 amRNSPublication of Inaugural ESG Report
1st Apr 20213:33 pmRNSTotal Voting Rights
18th Mar 20217:00 amRNSSale of 1.4MW Electrolyser to Sumitomo
17th Mar 202112:54 pmRNSPDMR Dealings – Buy as You Earn Scheme
26th Feb 20219:04 amRNSPlanned 100MW expansion of Shell refinery project
17th Feb 20214:55 pmRNSDirector/PDMR Shareholding
4th Feb 20217:04 amRNSTotal Voting Rights
4th Feb 20217:03 amRNSBlock listing Interim Review
28th Jan 20217:00 amRNSHalf-year Report
13th Jan 202111:00 amRNSSale to Linde of World’s Largest PEM Electrolyser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.