Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Trading Statement

6 Aug 2009 07:00

RNS Number : 9581W
Highland Gold Mining Limited
06 August 2009
 



FIRST HALF 2009 TRADING UPDATE

6 August 2009 - Highland Gold Mining Limited ("Highland Gold", or the "Company") is pleased to announce its trading update for the half year ended 30 June 2009. Full financial results for this period will be released on 22 September 2009.

HIGHLIGHTS

Mnogovershinnoye produced 78, 421 oz of gold, a 14% increase compared to H1 2008 

Novoshirokinskoye mine to be commissioned by 1 October 2009 

Taseevskoye development project doubles C1+C2 reserves after State Reserves Committee (GKZ) approves updated reserve model of 3.39 M ounces of gold

Belaya Gora exploration project moves to the development stage after GKZ approves C1+C2 reserves of 820, 000 ounces of gold 

MNOGOVERSHINNOYE (MNV) - Khabarovsk Region, Russia

At the Mnogovershinnoymine a significant improvement in ore processed and metal production was achieved compared to the same period in 2008. Gold production reached 78,421 ounces this exceeded H1 2008 results by 14%. The higher production figures were as a result of stabilised ore feed to the process plant and improvements to the existing processing technology.

With the beginning of 2009, plans to optimise the entire process plant circuit were implemented along with upgrades of basic equipment and assaying of the ore in order to determine at an early stage the ore process characteristics. The efforts of our metallurgical specialists were focused on maximising recovery rates by extending the preliminary cyanidation period and at the same time reducing basic reagents and power consumption through intensified pre-cyanidation and deactivation.

The total ore tonnes processed in H1 was slightly above target with mill throughput in May and June achieving 100, 000 tonnes per month. 

Mining at the Flank Ore Body which was originally planned to commence during Q3 2009 has already started thus providing added flexibility to the surface mining operations. The recent Upper Ore Body open pit re-optimisation also extended the life of this pit to 2011. Waste stripping of the upper benches within the commercial limits of this pit was initiated in order to access the ore blocks more efficiently.

Additional mobile mining equipment for both the underground and open pit operations was commissioned during H1 as planned. 

The first stage of the exploration drilling at the Pebble Deposit aimed at extending MNV's surface ore reserves was initiated during H1A total of US$1.3 million has been allocated to this initial drilling programme. 

MNV

6 months ended 30 June 

 

units

2008

2009

Mine development

Stripping 

m3

1 293 831

1 338 069

Underground development

metres

4 752

4 289

Mining 

Total ore mined

tonnes

492 079

464 949

 Average grade

g/t

5.0

5.7

Ore processing

Ore processed

tonnes

484 092

540 327

Average grade 

g/t

5.0

5.3

Recovery rate

%

88.1

88.6

Gold produced

ounces

68 813

78 421

DEVELOPMENT PROJECTS

NOVOSHIROKINSKOYE - Zabaikalsky Region, Russia

In H1 2009 the Company completed the construction and installation of facilities that had not been completed earlier, in particular setting up the equipment for start-up and operation. At the same time the economic model for the project was reassessed. 

As a result of this reassessment and in agreement between the Company and its partner for the project Kazzinc a decision was made to commission the plant in compliance with licence terms which require starting operations by 1 October 2009

It is planned that by the end of the year the mine will process up to 30 000 tonnes of low-grade ore accumulated in stockpiles. During this period equipment will go through start-up adjustment and the whole technological process will also be fine-tuned. Full scale ore processing will start with the beginning of mining operations in January 2010. Anticipated gold production over the life of mine, 2023, is expected to be 1.5 million ounces in gold and gold equivalents. Necessary precommissioning works, demothballing and test-running of the equipment along with personnel recruitment activities have already started at the site.

TASEEVSKOYE - Zabaikalsky Region, Russia

In Q2 the State Committee for Reserves (GKZ) approved new C1+C2 reserve figures to be included into the state balance following a review of a revised cut-off grade study submitted by the Company. At a cut-off grade of 1.8 g/t approved C1+C2 in-pit reserves for the Taseevskoye open-pit amount to 3.39 M ounces of gold contained in 20.24 million tonnes of ore with an average gold grade of 5.22 g/t.

The updated reserve figures at Taseevskoye represent a more than twofold increase compared to the previously approved reserves of approximately 44.1 tonnes and are the result of an extensive exploration drilling program conducted in 2006 and 2007 for a total of more than 35,000 metres. 

By the end of 2009 the Company plans to complete a bulk sampling programme and develop optimal processing flow sheets for ores from both the Taseevskoye deposit and the ZIF-1 tailings. The results of this work are expected to become available in H1 2010.

BELAYA GORA - Khabarovsk region, Russia 

Early July 2009 the State Committee for Reserves (GKZ) passed a decision to approve a C1+C2 gold reserve at the Belaya Gora property which is located 66 km south from its operating Mnogovershinnoye mine. The reserve will be registered with the state balance.

Accordingly, at a cut-off grade of 0.7 g/t the in-pit C1+C2 reserves at Belaya Gora amount to 820,000 ounces of gold contained in 7,286,000 tonnes of ore with an average gold grade of 3.5 g/t. The Belaya Gora deposit is planned to be mined by open-pit which will cover the two adjoining prospects Stockworks and Pologoye. 

Initial test work on two 300 kg bulk samples from Belaya Gora achieved high recovery rates of gold in the range of 85% to 87% by gravitational processing alone. Existing facilities at the Mnogovershinnoye mine will allow further processing of a gravitational gold concentrate from Belaya Gora.

The Company has started a feasibility study for Belaya Gora investigating various options for development. 

With the transition of Belaya Gora to the development stage Highland Gold's exploration teams are now refocusing their efforts on their other most advanced exploration projects: 

LYUBOV - Zabaikalsky Region, Russia

As prescribed by the license the Company is compiling a summary report on exploration results to date including a calculation of a P1+C2 resource. An internal scoping study has been started which will form the basis for a new "Project" outlining our future exploration programme to be approved by regulatory authorities by the end of 2009.

UNKURTASH - Kyrgyzstan

In Q2 the Company continued with its drilling programmes at the three prospects Unkurtash, Sarytube and Karatube where in 2009 a total of 8,000 metres of RC and diamond drilling is planned for further defining the multi-million ounce potential of the property. Final assays with evaluation of results are expected to be completed by mid Q4 2009.

BOARD CHANGE

Alex Davidson has decided to retire from Barrick Gold Corporation with effect from the end of August and pursue other interests. Alex was a Barrick nominated director and he has been invaluable to Highland since his appointment in 2005. We are currently discussing with Barrick the replacement for Alex, under the terms of the Co-Operation Agreement, to maintain their interest and input in Highland. The other Barrick nominated Director is Nick Nikolakakis who remains on the Board. We take the opportunity to wish Alex well in his future endeavours and thank him for his assistance and support over the last four years. 

ISSUED SHARE CAPITAL

The issued share capital and total number of voting rights of the Company at 30 July 2009 is 325,197,098 ordinary shares of £0.001 per share. The figure of 325,197,098 shares may be used by shareholders as the denominator for the calculations by which they will determine if they are required to notify their interest in, or a change to their interest in the Company, under the FSA's Disclosure and Transparency Rules.

 

For further information please contact:

Highland Gold - 

Dmitry Yakushkin, Head of Communications - +7 495 424 95 21

Duncan Baxter, Chairman - +44 (0) 1534 814202

Fin Public Relations - 

Alex Glover - +44 (0) 207 608 2280

Smith's - 

Dominic Palmer-Tomkinson - +44 (0) 207 239 0140

J.P. Morgan Cazenove (Nominated Adviser) -

Michael Wentworth-Stanley, Managing Director 

Sam Critchlow - +44 (0) 207 588 2828

www.highlandgold.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
TSTKGGGRKKZGLZM
Date   Source Headline
27th Jan 20167:00 amRNSTrading Update for the Second Half of 2015
15th Jan 20167:15 amRNSAppointment of New Chief Executive Officer
23rd Sep 20157:00 amRNSInterim Results Announcement for H1 2015
14th Aug 20157:00 amRNSTrading Update for the First Half of 2015
3rd Aug 20154:30 pmRNSBlocklisting Interim Review
26th May 20154:19 pmRNSAGM Statement
22nd Apr 20157:00 amRNS2014 Final Results
9th Apr 20158:00 amRNSDirectorate Change
3rd Feb 201511:17 amRNSBlock Listing Interim Review
27th Jan 20157:01 amRNSTrading Statement
16th Jan 20154:40 pmRNSSecond Price Monitoring Extn
16th Jan 20154:35 pmRNSPrice Monitoring Extension
31st Dec 201412:35 pmRNSPrice Monitoring Extension
10th Dec 20149:09 amRNSProduction Update
28th Oct 20147:00 amRNSAcquisition re license for exploration and mining
23rd Sep 20147:00 amRNSHalf Yearly Report
12th Aug 20147:00 amRNSTrading Statement
4th Aug 201412:37 pmRNSBlocklisting Interim Review
23rd Jul 201412:00 pmRNSNorth-Western Flank (NWF) Acquisition
27th May 20145:00 pmRNSResult of AGM
21st May 20145:09 pmRNSHolding(s) in Company
9th May 201412:00 pmRNSDistribution of the Annual Report and Accounts
23rd Apr 20147:00 amRNSFinal Results
25th Feb 20145:38 pmRNSStatement re Notification of disposal of shares
4th Feb 20149:11 amRNSBlocklisting Interim Review
29th Jan 20147:00 amRNSTrading Update for the Second half of 2013
21st Jan 20143:56 pmRNSHolding(s) in Company
18th Dec 20132:14 pmRNSDirectorate Change
15th Nov 20134:28 pmRNSNotification of significant holding
18th Sep 20137:00 amRNSHalf Yearly Report
11th Sep 20137:00 amRNSDirector Declaration
22nd Aug 20134:35 pmRNSPrice Monitoring Extension
12th Aug 20137:00 amRNSTrading Statement
5th Aug 20137:00 amRNSBlocklisting Interim Review
18th Jul 20133:09 pmRNSDirector/PDMR Shareholding
15th Jul 20135:12 pmRNSNotification of Major Interest in Shares
11th Jul 201312:19 pmRNSDirector/PDMR Shareholding
11th Jul 20137:00 amRNSBelaya Gora Production Update
21st Jun 20132:35 pmRNSDirector/PDMR Shareholding
11th Jun 201312:00 pmRNSResult of Annual General Meeting
6th Jun 201312:00 pmRNSDirector/PDMR Shareholding
10th May 20137:00 amRNSAnnual Report and Accounts and AGM Notice
29th Apr 201312:40 pmRNSNotification of Major Interest in Shares
23rd Apr 20137:00 amRNSFinal Results
16th Apr 20137:00 amRNSProject Update
2nd Apr 20137:00 amRNSAcquisition
12th Mar 20131:44 pmRNSNotification of Major Interest in Shares
11th Mar 20131:32 pmRNSNotification of Major Interest in Shares
22nd Feb 20133:42 pmRNSNotification of Major Interest in Shares
8th Feb 20135:05 pmRNSNotification of Major Interest in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.