Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

PROJECTS UPDATE

22 Jun 2011 07:00

RNS Number : 8309I
Highland Gold Mining Limited
22 June 2011
 



HIGHLAND GOLD MINING LIMITED

 

POSITIVE RESULTS FROM EXPLORATION PROJECTS IN THE KHABAROVSK REGION

 

22 June 2011 - Highland Gold Mining Limited ("Highland Gold", or the "Company" AIM: HGM) is pleased to announce positive initial results from its Blagodatnoye and Belaya Gora Flanks properties, two highly prospective exploration projects located in close proximity to and which could feed into the Belaya Gora Project. These latest results corroborate the Company's plan to enlarge the historically reported resources at these two properties and support the Company's commitment of substantially increasing its asset base within its strategic mining hub in the Khabarovsk region.

 

At Blagodatnoye, using preliminary spectral analysis, assay data indicates a gold-mineralised zone of approximately 500 metres in length by 400 metres in width which was intersected to a depth of 200 metres. The prospectivity of the zone remains open in all directions. Intersects of gold mineralisation from trenching and core drilling display a high degree of continuity and underline the potential for Blagodatnoye to host substantial near surface ore with grades ranging between 1.5 and 2.0 g/t. Initial core drilling results also indicate that gold mineralisation is associated with a linear stockwork system characterised by sets of sub-parallel east-west trending and steeply dipping zones of narrow veins and quartz-carbonate veinlets.

 

Blagodatnoye - Drilling & Trenching Highlights 2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

c-5002

250.0

13.1

15.0

1.9

3.1

86.1

102.1

16.0

3.0

114.0

135.0

21.0

1.5

153.8

156.0

2.2

1.5

199.6

216.6

17.0

1.9

c-5004

256.1

3.9

5.4

1.5

2.4

11.1

13.1

2.0

1.4

17.6

25.0

7.4

1.3

28.0

32.0

4.0

1.3

58.3

68.9

10.6

1.2

84.6

86.6

5.0

3.8

96.5

100.5

4.0

2.5

106.5

109.5

3.0

3.5

117.0

118.0

1.0

4.4

Trench Id

Trench Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

K-151201

483.0

94.6

98.0

3.4

1.1

112.0

115.0

3.0

0.8

120.3

136.0

15.7

3.3

138.0

145.4

7.4

1.8

151.0

165.0

14.0

1.5

181.0

183.4

2.4

2.1

187.0

190.0

3.0

3.1

196.0

199.0

3.0

2.1

202.0

210.0

8.0

1.2

260.0

262.0

2.0

2.5

281.0

283.0

2.0

1.1

293.0

294.0

1.0

3.3

327.0

328.0

1.0

4.0

346.0

347.0

1.0

2.6

377.0

378.0

1.0

4.6

383.0

385.0

2.0

1.4

395.0

412.6

17.6

2.1

424.0

428.0

4.0

1.5

438.0

439.0

1.0

6.0

445.3

449.0

3.7

1.9

464.0

474.0

10.0

2.2

479.0

483.0

4.0

1.9

 

K-149601

 

500.0

88.0

95.0

7.0

2.9

117.0

119.0

2.0

1.6

134.0

135.4

1.4

1.6

197.0

205.0

8.0

0.9

240.0

244.0

4.0

1.5

254.0

267.0

13.0

1.2

Preliminary spectral analysis assays.- Drill hole inclination from surface: 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, 3 metre or 2.1 g*m minimum ore interval.

 

The Blagodatnoye property was acquired in a public auction in H1 2010 and is located 30 km to the southwest of the Belaya Gora Project and has a reported prognostic resource estimate of 161,000 oz of gold. Following the Company's initial 2010 exploration programme which confirmed previous sampling results the 2011 programme now underway includes 10,000 metres of core drilling to delineate the extent and continuity of gold mineralisation. To date more than 3,000 metres of drilling and 1,000 metres of trenching have been completed.

 

At Belaya Gora Flanks (BGF), using preliminary spectral analysis, assay results from initial trenching and core drilling samples from two prospects have yielded significant intersects of gold mineralisation corroborating the resource potential of the Belaya Gora Flanks license:

 

  

Belaya Gora Flanks - Drilling & Trenching Highlights 2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

21863

115.4

19.9

28.9

9.0

6.29

21744

172.0

50.0

53.8

3.8

1.00

21862

175.3

108.6

116.0

7.4

1.01

21742

100.0

6.0

11.0

5.0

1.86

22262

112.5

8.0

12.3

4.3

1.84

Trench Id

Trench Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

2261

72.0

40.0

41.0

1.0

8.60

2261

58.3

72.0

13.7

2.92

2181

165

79.0

143.3

64.3

1.87

2101

138

36.3

37.5

1.2

1.59

2101

59.0

62.0

3.0

1.35

2101

86.0

94.0

8.0

1.12

1861

165

5.0

9.5

4.5

1.39

1741

465

72.0

81.0

9.0

0.88

1741

231.3

236.8

5.5

0.81

Preliminary spectral assays. - Drill hole inclination from surface: 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, 3 metre or 2.1 g*m minimum ore interval.

 

The 33 km² BGF license encapsulates the Belaya Gora deposit and is viewed to have excellent near-mine exploration potential to increase the open-pit resource base for the Belaya Gora Project. The BGF licence area was partially explored in the past and historical data notes a reported prognostic resource estimate of 200,000 oz of gold. The area hosts several known prospects with linear zones of vein-type and stockwork gold mineralisation with reported grades ranging between 1 g/t and 3 g/t and noted highlights up to 20 g/t.

 

The 2011 exploration programme now underway includes trenching and a 5,000 metre core drilling programme for verifying and expanding the known mineralised prospects as well as testing of unexplored areas.

 

Highland Gold is committed to maintaining its policy of successfully advancing quality exploration projects to reserve status and continues with its exploration efforts at both the Blagodatnoye and Belaya Gora Flanks properties, each being integral projects for the Company's strategy of organic growth in the region. A total of US$5.5 million of the Company's US$30 million planned 2011 exploration budget is earmarked for these two projects.

 

Mr. Werner Klemens, Head of Exploration at Highland Gold has reviewed and verified the information contained in this release with respect to drilling and resource / reserves matters. Mr. Klemens holds a Ph.D. in Geology from the University of Toronto. He has 13 years experience in mineral exploration and is a fellow of the Geological Association of Canada. A rigorous quality assurance programme complying with international standards is in effect at all exploration projects and includes duplicate sampling, insertion of standards and check assaying at external laboratories.

For further information please contact:

Highland Gold

Dmitry Yakushkin, Head of Communications + 7 495 424 95 21

Duncan Baxter, Chairman + 44 (0) 1534 814 202

Matrix

Robin Henshall, Partner +44 (0) 20 3206 7172

(Nominated Adviser and Broker)

Nick Stone +44 (0) 20 3206 7343

Fin Public Relations

Alex Glover + 44 (0) 20 7608 2280

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFFLFLFQFLBBK
Date   Source Headline
30th Dec 20084:40 pmRNSSecond Price Monitoring Extn
30th Dec 20084:35 pmRNSPrice Monitoring Extension
10th Dec 20084:41 pmRNSSecond Price Monitoring Extn
10th Dec 20084:38 pmRNSPrice Monitoring Extension
10th Dec 20087:00 amRNSProject Review - December, 2008
28th Oct 20084:44 pmRNSSecond Price Monitoring Extn
28th Oct 20084:36 pmRNSPrice Monitoring Extension
23rd Oct 20084:42 pmRNSSecond Price Monitoring Extn
23rd Oct 20084:40 pmRNSPrice Monitoring Extension
25th Sep 20087:00 amRNSInterim Results
17th Sep 20087:00 amRNSExecutive Management Change
16th Sep 20084:42 pmRNSSecond Price Monitoring Extn
16th Sep 20084:35 pmRNSPrice Monitoring Extension
12th Aug 20087:00 amRNSTrading Statement
5th Aug 20084:27 pmRNSBlocklisting Interim Review
24th Jul 20087:00 amRNSDirector Shareholding
23rd Jul 20087:00 amRNSDirectorate Change
18th Jun 20087:00 amRNSMAYSKOYE PROJECT
12th Jun 20082:00 pmRNSAGM Statement
7th May 20084:00 pmRNSDirector/PDMR Shareholding
28th Apr 20087:00 amRNSFinal Results
25th Apr 20083:00 pmRNSDirectorate Change
31st Mar 20084:40 pmRNSSecond Price Monitoring Extn
31st Mar 20084:35 pmRNSPrice Monitoring Extension
13th Feb 20084:48 pmRNSBlocklisting Interim Review
7th Feb 200812:00 pmRNSTrading Statement
30th Jan 200812:30 pmRNSDrilling Report
28th Jan 200812:30 pmRNSDirectorate Change
24th Jan 20084:18 pmRNSIssue of Equity
16th Jan 20087:00 amRNSIssue of Equity
14th Jan 20082:06 pmRNSEGM Statement
28th Dec 200710:50 amRNSDirectorate Change
18th Dec 20077:01 amRNSMillhouse Circular Announceme
11th Dec 20077:05 amRNSMillhouse First Completion
4th Dec 20077:02 amRNSEquity subscription
25th Oct 20077:00 amRNSAppointment of Director
24th Oct 200712:00 pmRNSDarasun Sale Completion
16th Oct 20073:57 pmRNSMajor interests in shares
15th Oct 20073:50 pmRNSMajor interests in shares
10th Oct 20072:30 pmRNSMayskoye Licence
25th Sep 200710:57 amRNSDirector/PDMR Shareholding
24th Sep 20077:01 amRNSInterim Results
4th Sep 200710:27 amRNSBlocklisting Interim Review
28th Aug 20077:02 amRNSAQUISITION OF RIGHTS FOR ISKA
13th Aug 20077:00 amRNSTrading Statement
8th Aug 200712:46 pmRNSDisposal
27th Jul 200710:00 amRNSBelaya Gora Project
25th Jul 20071:00 pmRNSDirector Declaration
23rd Jul 200712:16 pmRNSDirector Declaration
17th Jul 200712:00 pmRNSSafety note

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.