Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

PROJECTS UPDATE

22 Jun 2011 07:00

RNS Number : 8309I
Highland Gold Mining Limited
22 June 2011
 



HIGHLAND GOLD MINING LIMITED

 

POSITIVE RESULTS FROM EXPLORATION PROJECTS IN THE KHABAROVSK REGION

 

22 June 2011 - Highland Gold Mining Limited ("Highland Gold", or the "Company" AIM: HGM) is pleased to announce positive initial results from its Blagodatnoye and Belaya Gora Flanks properties, two highly prospective exploration projects located in close proximity to and which could feed into the Belaya Gora Project. These latest results corroborate the Company's plan to enlarge the historically reported resources at these two properties and support the Company's commitment of substantially increasing its asset base within its strategic mining hub in the Khabarovsk region.

 

At Blagodatnoye, using preliminary spectral analysis, assay data indicates a gold-mineralised zone of approximately 500 metres in length by 400 metres in width which was intersected to a depth of 200 metres. The prospectivity of the zone remains open in all directions. Intersects of gold mineralisation from trenching and core drilling display a high degree of continuity and underline the potential for Blagodatnoye to host substantial near surface ore with grades ranging between 1.5 and 2.0 g/t. Initial core drilling results also indicate that gold mineralisation is associated with a linear stockwork system characterised by sets of sub-parallel east-west trending and steeply dipping zones of narrow veins and quartz-carbonate veinlets.

 

Blagodatnoye - Drilling & Trenching Highlights 2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

c-5002

250.0

13.1

15.0

1.9

3.1

86.1

102.1

16.0

3.0

114.0

135.0

21.0

1.5

153.8

156.0

2.2

1.5

199.6

216.6

17.0

1.9

c-5004

256.1

3.9

5.4

1.5

2.4

11.1

13.1

2.0

1.4

17.6

25.0

7.4

1.3

28.0

32.0

4.0

1.3

58.3

68.9

10.6

1.2

84.6

86.6

5.0

3.8

96.5

100.5

4.0

2.5

106.5

109.5

3.0

3.5

117.0

118.0

1.0

4.4

Trench Id

Trench Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

K-151201

483.0

94.6

98.0

3.4

1.1

112.0

115.0

3.0

0.8

120.3

136.0

15.7

3.3

138.0

145.4

7.4

1.8

151.0

165.0

14.0

1.5

181.0

183.4

2.4

2.1

187.0

190.0

3.0

3.1

196.0

199.0

3.0

2.1

202.0

210.0

8.0

1.2

260.0

262.0

2.0

2.5

281.0

283.0

2.0

1.1

293.0

294.0

1.0

3.3

327.0

328.0

1.0

4.0

346.0

347.0

1.0

2.6

377.0

378.0

1.0

4.6

383.0

385.0

2.0

1.4

395.0

412.6

17.6

2.1

424.0

428.0

4.0

1.5

438.0

439.0

1.0

6.0

445.3

449.0

3.7

1.9

464.0

474.0

10.0

2.2

479.0

483.0

4.0

1.9

 

K-149601

 

500.0

88.0

95.0

7.0

2.9

117.0

119.0

2.0

1.6

134.0

135.4

1.4

1.6

197.0

205.0

8.0

0.9

240.0

244.0

4.0

1.5

254.0

267.0

13.0

1.2

Preliminary spectral analysis assays.- Drill hole inclination from surface: 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, 3 metre or 2.1 g*m minimum ore interval.

 

The Blagodatnoye property was acquired in a public auction in H1 2010 and is located 30 km to the southwest of the Belaya Gora Project and has a reported prognostic resource estimate of 161,000 oz of gold. Following the Company's initial 2010 exploration programme which confirmed previous sampling results the 2011 programme now underway includes 10,000 metres of core drilling to delineate the extent and continuity of gold mineralisation. To date more than 3,000 metres of drilling and 1,000 metres of trenching have been completed.

 

At Belaya Gora Flanks (BGF), using preliminary spectral analysis, assay results from initial trenching and core drilling samples from two prospects have yielded significant intersects of gold mineralisation corroborating the resource potential of the Belaya Gora Flanks license:

 

  

Belaya Gora Flanks - Drilling & Trenching Highlights 2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

21863

115.4

19.9

28.9

9.0

6.29

21744

172.0

50.0

53.8

3.8

1.00

21862

175.3

108.6

116.0

7.4

1.01

21742

100.0

6.0

11.0

5.0

1.86

22262

112.5

8.0

12.3

4.3

1.84

Trench Id

Trench Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

2261

72.0

40.0

41.0

1.0

8.60

2261

58.3

72.0

13.7

2.92

2181

165

79.0

143.3

64.3

1.87

2101

138

36.3

37.5

1.2

1.59

2101

59.0

62.0

3.0

1.35

2101

86.0

94.0

8.0

1.12

1861

165

5.0

9.5

4.5

1.39

1741

465

72.0

81.0

9.0

0.88

1741

231.3

236.8

5.5

0.81

Preliminary spectral assays. - Drill hole inclination from surface: 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, 3 metre or 2.1 g*m minimum ore interval.

 

The 33 km² BGF license encapsulates the Belaya Gora deposit and is viewed to have excellent near-mine exploration potential to increase the open-pit resource base for the Belaya Gora Project. The BGF licence area was partially explored in the past and historical data notes a reported prognostic resource estimate of 200,000 oz of gold. The area hosts several known prospects with linear zones of vein-type and stockwork gold mineralisation with reported grades ranging between 1 g/t and 3 g/t and noted highlights up to 20 g/t.

 

The 2011 exploration programme now underway includes trenching and a 5,000 metre core drilling programme for verifying and expanding the known mineralised prospects as well as testing of unexplored areas.

 

Highland Gold is committed to maintaining its policy of successfully advancing quality exploration projects to reserve status and continues with its exploration efforts at both the Blagodatnoye and Belaya Gora Flanks properties, each being integral projects for the Company's strategy of organic growth in the region. A total of US$5.5 million of the Company's US$30 million planned 2011 exploration budget is earmarked for these two projects.

 

Mr. Werner Klemens, Head of Exploration at Highland Gold has reviewed and verified the information contained in this release with respect to drilling and resource / reserves matters. Mr. Klemens holds a Ph.D. in Geology from the University of Toronto. He has 13 years experience in mineral exploration and is a fellow of the Geological Association of Canada. A rigorous quality assurance programme complying with international standards is in effect at all exploration projects and includes duplicate sampling, insertion of standards and check assaying at external laboratories.

For further information please contact:

Highland Gold

Dmitry Yakushkin, Head of Communications + 7 495 424 95 21

Duncan Baxter, Chairman + 44 (0) 1534 814 202

Matrix

Robin Henshall, Partner +44 (0) 20 3206 7172

(Nominated Adviser and Broker)

Nick Stone +44 (0) 20 3206 7343

Fin Public Relations

Alex Glover + 44 (0) 20 7608 2280

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFFLFLFQFLBBK
Date   Source Headline
14th Feb 20117:00 amRNSSignificant shareholding
11th Feb 20114:45 pmRNSBlocklisting 6 monthly return
26th Jan 20117:00 amRNSTrading Statement
21st Dec 20107:00 amRNSDrilling Report
9th Nov 20107:00 amRNSProject Start Up
4th Oct 20107:00 amRNSHolding(s) in Company
1st Oct 20107:00 amRNSChange of Adviser
17th Sep 20104:35 pmRNSPrice Monitoring Extension
17th Sep 20107:00 amRNSDirectorate Change
13th Aug 201012:27 pmRNSBlocklisting Interim Review
12th Aug 20107:00 amRNSTrading Statement August 2010
2nd Aug 20107:00 amRNSKyrgyzstan Exploration Activities
19th Jul 20107:00 amRNSAcquisition of Exploration and Production Rights
6th Jul 20107:00 amRNSJoint Broker Appointment
22nd Jun 20107:00 amRNSSale of shares
18th Jun 20107:00 amRNSAGM Statement
30th Apr 20107:00 amRNSAnnual Results 2009
3rd Mar 20107:00 amRNSNovo Update March 2010
2nd Mar 201011:03 amRNSChange of Advisor
22nd Feb 201012:00 pmRNSNew Acquisition
3rd Feb 201012:19 pmRNSBlocklisting Interim Review
3rd Feb 20107:00 amRNSTrading Statement
10th Dec 20097:00 amRNSDirectorate Change
9th Nov 200910:37 amRNSCorrection to earlier announcement
3rd Nov 20097:00 amRNSSignificant Results
1st Oct 200910:42 amRNSCommissioning of Novoshirokinskoye Mine
22nd Sep 20097:00 amRNSInterim Results September, 2009
1st Sep 20097:00 amRNSDirectorate Change
10th Aug 20093:51 pmRNSBlocklisting Interim Review
6th Aug 20097:00 amRNSTrading Statement
28th Jul 20094:40 pmRNSSecond Price Monitoring Extn
28th Jul 20094:35 pmRNSPrice Monitoring Extension
10th Jul 20094:40 pmRNSSecond Price Monitoring Extn
10th Jul 20094:35 pmRNSPrice Monitoring Extension
18th Jun 200912:12 pmRNSAGM Statement
6th May 20094:40 pmRNSSecond Price Monitoring Extn
6th May 20094:35 pmRNSPrice Monitoring Extension
30th Apr 20094:40 pmRNSSecond Price Monitoring Extn
30th Apr 20094:35 pmRNSPrice Monitoring Extension
30th Apr 20097:00 amRNSAnnual Financial Report
29th Apr 20097:00 amRNSDisposal
29th Apr 20097:00 amRNSAcquisition of Mayskoye deposit
31st Mar 20099:55 amRNSNew Appointments
5th Feb 20097:00 amRNSTrading Update February, 2009
3rd Feb 20093:41 pmRNSBlocklisting Interim Review
26th Jan 20094:40 pmRNSSecond Price Monitoring Extn
26th Jan 20094:35 pmRNSPrice Monitoring Extension
14th Jan 20094:40 pmRNSSecond Price Monitoring Extn
14th Jan 20094:35 pmRNSPrice Monitoring Extension
13th Jan 20093:00 pmRNSSignificant Shareholding January, 2009

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.