The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHerencia Resources Regulatory News (HER)

  • There is currently no data for HER

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract Awarded for Picachos Drill Program

20 Oct 2014 07:00

RNS Number : 6674U
Herencia Resources PLC
20 October 2014
 



Herencia Resources plc

("Herencia" or "the Company")

Contract Awarded for Picachos Drill Program

Highlights

ü Drilling contractor appointed for the Picachos Project

ü Contract to include both reverse circulation drilling and diamond drilling

ü Up to 4,500m to be drilled

ü Targeting maiden Mineral Resource Estimate in 1Q2015

ü Keeps the Company on track for production in 2015

Herencia Resources plc (AIM:HER), the Chile-focussed mineral exploration and development Company, is pleased to announce that it has completed the tender process for the upcoming drill program at its Picachos Copper Project ("Picachos" or the "Project"), located in northern Chile.

Seven companies submitted bids for the reverse circulation (RC) and diamond drill (DD) work program and AC Perforaciones was chosen to execute the work. AC Perforaciones is a local drilling company founded in 2006 and experienced in both diamond and reverse circulation drilling. Their major clients include Barrick, CAP, SQM, Teck Resources and Freeport.

Drilling is expected to begin in the first week of November with the duration of the campaign estimated at approximately one month. The objective is to complete approximately 3,500 to 4,500m of drilling comprising 2,000 to 3,000m of RC drilling and 1,000 to 1,500m of diamond drilling. It is anticipated that the program will comprise 30 to 40 holes with depths ranging between 80m and 200m. As previously advised, the program will target the high-grade 40m Shaft area and the recently identified northern extensions of the Flor del Bosque/40m Shaft mineralisation.

The aim of the drill program is to determine a JORC mineral resource estimate which will underpin a mining feasibility study. The study is expected to be finalised in the second quarter 2015, and will focus on the open pit potential of the area and target mine development and copper production in the second half of 2015.

The Company has also engaged Geodatos to undertake a geophysical survey program involving Resistivity and Induced Polarization (IP) methods to assist in the determination of depth and lateral extensions to the high-grade copper mineralisation at Picachos. This work has already commenced and is expected to be completed this month with the result available shortly after.

Managing Director Graeme Sloan commented on the upcoming drill program:

 

"It is exciting to be kicking off our second drill program at Picachos, together with the geophysical work, just weeks after a successful capital raising.

Once this work is completed we will be in a position to collate all the assay and geological data to construct a geological model and look to produce a mineral resource estimate for the Picachos Project. This will then be used as the basis of the Mine Feasibility Study, looking to optimise and schedule open pit mine production from Picachos.

Management are very focussed on maintaining the momentum as we seek to bring Picachos into production in the second half of 2015, aided by the location and availability of local ore processing options negating the time and cost burdens of building our own processing plant."

About the Picachos Project

The Picachos Project is located approximately 50km south east of the coastal city of La Serena, 8km west of both the existing Andacollo copper-gold project operated by Teck Resources and the mining town of Andacollo (population approximately 10,000 people), and approximately 10km south of the privately owned Tambillos copper mine. The Project is very well positioned for infrastructure with existing high voltage power located approximately 3km east of the Project area and serviced by two all-weather access roads.

Small scale mining is currently being undertaken by private miners via small open pit and underground mining operations. Ore is being trucked to a Chilean government owned processing plant (ENAMI plant) for processing. This mining will continue up until such time as the Option to fully acquire Picachos is exercised (at Herencia's discretion) and is seen by the Company as an excellent mechanism to achieve geological and grade data across many zones of mineralisation.

A review of available data and Herencia's own geological programs has confirmed multiple zones of mineralisation with a combined strike length of over 8km contained within the Project area. In some areas the close relationship of these zones coupled with multiple occurrences of out-cropping wide zones of mineralisation, highlights the excellent potential for large scale open pit mining to take place at Picachos. Historic mining has focused mainly around the high grade structures, however in some areas the mantos have been mined up to 50m wide. Mineralisation generally commences from one to five metres below the surface and appears open at depth.

About Herencia

Herencia Resources plc, is an AIM quoted exploration and development company operating in Chile. In addition to the Picachos Copper Project, the Company has a Joint Venture with OZ Minerals at the Guamanga Project where drilling is scheduled to commence this quarter and it has completed a Feasibility Study in relation to its 70% owned Paguanta Project, a high grade silver-zinc-lead project located in northern Chile. The Company's corporate office is located in Perth and the main technical and management office is located in Santiago, Chile where it has been operating for over eight years.

For further information, please contact:

Graeme Sloan, Herencia Resources plc +61 8 9481 4204

Katy Mitchell, WH Ireland Limited +44 161 832 2174

References in this announcement to exploration results and potential have been approved for release by Mr Graeme Sloan (BAppSc Mining Engineering WASM) and Mr Antonio Valverde (Bsc Geology Universidad Complutense de Madrid), who have more than 20 years relevant experience in the field of activity concerned. Mr Sloan is a Member of the Australasian Institute of Mining and Metallurgy. Mr Sloan and Mr Valverde have consented to the inclusion of the material in the form and context in which it appears.

Further background details on the Company can be found at www.herenciaresources.com

**ENDS** 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUBAVRSNARAAA
Date   Source Headline
23rd Aug 20118:02 amRNSHigh Grade Drill Assay Rslts Continue at Patricia
4th Aug 201111:15 amRNSMore high grade results at Paguanta
20th Jul 20119:19 amRNSDrilling to recommence at Paguanta
8th Jul 20112:18 pmRNSProject Update
4th Jul 20118:07 amRNSUpdate on Project Activity
24th Jun 20117:50 amRNSIssue of Equity
15th Jun 201111:00 amRNSMore Copper and Silver at Doris
14th Jun 20117:00 amRNSProject Update
9th Jun 20113:17 pmRNSResult of AGM
31st May 201111:00 amRNSNew Copper-Gold Project Agreement Signed
27th May 20114:53 pmRNSHolding(s) in Company - Replacement
27th May 20112:45 pmRNSHolding(s) in Company
27th May 20117:00 amRNSProject Update
18th May 20119:55 amRNSProject Update
9th May 201110:53 amRNSProject Update
19th Apr 201110:58 amRNSFinal Results
18th Apr 201110:46 amRNSProject Update
11th Mar 20117:00 amRNSDrilling Commences at Paguanta
28th Feb 20111:34 pmRNSDrilling Update
3rd Feb 20114:12 pmRNSNew Copper-Gold Project Opportunity
31st Jan 201112:18 pmRNSTotal Voting Rights
18th Jan 201112:23 pmRNSDirector/PDMR Shareholding
12th Jan 201112:48 pmRNSDirector/PDMR Shareholding
31st Dec 20107:56 amRNSTotal Voting Rights
23rd Dec 201010:48 amRNSPaguanta Project Update
22nd Dec 20103:31 pmRNSIssue of Equity
1st Dec 20108:31 amRNSIssue of Equity
25th Nov 20108:52 amRNSProject Update - Doris Geophysical Survey
22nd Nov 201011:07 amRNSProject Update
19th Nov 20103:41 pmRNSHolding(s) in Company
16th Nov 20108:03 amRNSHolding(s) in Company
10th Nov 20102:20 pmRNSPaguanta Project Update
29th Oct 20103:33 pmRNSTotal Voting Rights
27th Oct 20102:08 pmRNSMore High Grade Copper and Silver Assays at Doris
12th Oct 201012:33 pmRNSIssue of Options
8th Oct 201011:45 amRNSHolding(s) in Company
7th Oct 20109:38 amRNSMining Inventory Upgraded for Paguanta Project
4th Oct 20109:22 amRNSHolding(s) in Company
1st Oct 20109:42 amRNSDirectors Dealings/Issue of Equity
22nd Sep 201011:51 amRNSHolding(s) in Company
22nd Sep 201010:18 amRNSDirectorate Change
17th Sep 20108:03 amRNS2010 Mineral Resource Update for Paguanta Project
10th Sep 20109:07 amRNSHigh Copper and Silver Grades Confirmed at 'Doris'
9th Sep 20103:56 pmRNSHalf Yearly Report
12th Aug 20109:10 amRNSHigh Grade Surface Copper and Silver at Paguanta
2nd Aug 20108:30 amRNSFinal Results from Drilling Program at Paguanta
23rd Jun 20103:37 pmRNSResult of AGM
23rd Jun 20107:41 amRNSContinued High Grade Intercepts
18th Jun 201010:42 amRNSDMS test work to commence on Paguanta Ore
25th May 20107:48 amRNSFurther extension to Cathedral vein at Paguanta

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.