The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Jolly Ranch Update

26 Jan 2010 07:00

RNS Number : 0981G
Nighthawk Energy plc
26 January 2010
 



NIGHTHAWK ENERGY PLC

("Nighthawk" or "the Company")

JOLLY RANCH UPDATE

Nighthawk Energy plc, the US focused hydrocarbon development and production company (Tickers: AIM: HAWK and OTCQX: NHEGY), is pleased to announce an update in respect of the winter drilling programme on the Jolly Ranch project.

The Jolly Ranch project, covering approximately 370,000 gross acres, comprises three areas, Jolly Ranch, Middle Mist and Mustang Creek, situated in Lincoln, Elbert and Washington Counties, Colorado. Nighthawk holds a 50% interest in the project and Running Foxes Petroleum Inc., the operator, holds the remaining percentage interest.

In July 2009, Schlumberger Data & Consulting Services completed an independent evaluation of the hydrocarbons in place at Jolly Ranch and concluded: 

The P50, or most likely, oil in place over the 246,000 project acres evaluated, using probabilistic methods, was 1.462 billion barrels gross
There is reasonable certainty of reservoir and source rock continuity at least in the detailed model area that includes the Craig and Jolly Ranch fields

Five new vertical wells and one horizontal section, drilled using an existing vertical well, have been drilled on the Jolly Ranch project during the winter drilling campaign. This brings the total number of deep wells drilled on the Jolly Ranch project to 15, two of which will be utilised as water disposal wells. In aggregate, the 15 wells encountered in excess of 150 oil bearing horizons in conventional and non-conventional zones.

The results from the recent drilling programme have demonstrated source rock and reservoir continuity of the Atoka and Cherokee shales. In addition, the estimated oil in place figures per well confirm or exceed those indicated within the independent report, thus reinforcing confidence in the financial viability of the Jolly Ranch asset.

The project has now advanced to a stage where completion techniques, refined over the past twelve months will now be applied to all the drilled wells.  This will promote optimum production from this new oil play in the carbonaceous shales of the Atoka and Cherokee formations of the Denver Basin, the main focus of the project

The current status of the wells drilled during the winter programme is:

Craig 4-33

The Craig 4-33 well has been cased as a producer and completed in the Lower Atoka formation between 6,839 and 6,977 feet and tested at an average rate of 130 bopd over a sustained two week period. The well will now be placed on full production.

The Cherokee formation, which also encountered significant oil during drilling, will be completed at a later date to enable co-mingling of production.

Craig 10-28

The Craig 10-28 well has been cased as a producer and is currently undergoing completion in the Lower Atoka formation between 6,885 and 7,132 feet and will be placed on production in early February 2010.

The Cherokee formation, which also encountered significant oil during drilling, will be completed at a later date to enable co-mingling of production.

Craig 12-28

The Craig 12-28 well has been cased as a producer and is currently undergoing completion in the Cherokee and Lower Atoka formations between 6,540 and 7,014 feet and will be placed on production in early February 2010. Oil production will be directed into a centralised tank battery for ease of shipment of sales, together with output from the Craig 10-28.

Larger volume centralised tank batteries are being deployed on the Jolly Ranch project in parallel with the expected increase in full-scale production as development continues.

Craig 12-33

The Craig 12-33 well has been cased as a producer, is currently undergoing completion in the Lower Atoka and Cherokee formations, between 6,543 to 7,077 feet, and will be placed on production during February 2010

Craig 15-32H

The Craig 15-32H, a 2,006ft horizontal section, was drilled off the existing Craig 15-32 vertical well. Three of the four zones were sand fracced with oil coming back during completion operations.

The well requires some mechanical remediation following these exercises which will be undertaken subsequent to the production focused completion exercises in the Cherokee and Atoka zones on the vertical wells.

Craig 6-4 SWD

The Craig 6-4 SWD was permitted and drilled as a salt water disposal well to reduce the operating costs of production and development. During drilling excellent hydrocarbon formations were encountered within the Cherokee and Atoka shales between 6,489 and 7,079 feet. Subsequently a twin production well has been permitted to be drilled at a later date.

Optimum completion methods for the wells have been refined over the last 12 months. It is intended to apply these techniques, where applicable, to the wells drilled prior to the winter campaign. Nighthawk intends to publish a full project status report during February 2010encompassing an update on all wells, production profiles and a review of the ongoing 3D seismic programmes.

David Bramhill, Managing Director of Nighthawk, commented: "We continue to be encouraged by the appraisal drilling results. Strong progress has been made and our understanding of the project has evolved. We anticipate regular news flow in respect of the project over the coming months."

Tim Heeley B.Eng (Hons) a member of the Society of Petroleum Engineers, Fellow of the Geological Society of London and a Chartered Energy Engineer, who is Commercial Director of Nighthawk and has over 13 years of experience in the hydrocarbons industry, has approved the technical information contained in this announcement.

Enquiries:

Nighthawk Energy plc

David Bramhill, Managing Director

Tim Heeley, Commercial Director

01271 882160

07956 525433

020 7887 1453

Westhouse Securities Limited

Tim Feather

Matthew Johnson

020 7601 6100

tim.feather@westhousesecurities.com

matthew.johnson@westhousesecurities.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3395

nick@bishopsgatecommunications.com

Financial Dynamics 

Ben Brewerton

Ed Westropp

020 7831 3113

ben.brewerton@fd.com

edward.westropp@fd.com 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGUBWGUPUGMA
Date   Source Headline
20th Jan 20164:35 pmRNSPrice Monitoring Extension
20th Jan 20167:00 amRNSUpdate on Water Flood Project
19th Jan 20164:41 pmRNSSecond Price Monitoring Extn
19th Jan 20164:35 pmRNSPrice Monitoring Extension
18th Jan 20164:40 pmRNSSecond Price Monitoring Extn
18th Jan 20164:35 pmRNSPrice Monitoring Extension
15th Jan 20164:42 pmRNSDirector's Dealings
12th Jan 20164:35 pmRNSPrice Monitoring Extension
11th Jan 20167:00 amRNSBank Negotiation and 2016 Plans
8th Jan 20164:35 pmRNSPrice Monitoring Extension
4th Jan 20167:00 amRNSBank Negotiation
23rd Dec 20157:00 amRNSBank Negotiation
10th Dec 20157:00 amRNSBank Covenant Compliance and Production Update
26th Nov 20157:00 amRNSOperational Update
13th Nov 20157:00 amRNSOperational Update
5th Nov 20152:54 pmRNSShareholder Communication & Accounting Framework
4th Nov 20157:24 amRNSBorrowing Base Redetermination and Hedging Update
29th Oct 20157:00 amRNSDrilling Program and Production Update
23rd Oct 20157:00 amRNSOperational Update
20th Oct 20157:00 amRNSOrganisational Changes and Directorate Change
14th Oct 20154:35 pmRNSPrice Monitoring Extension
30th Sep 20157:00 amRNSInterim Results
18th Aug 20157:00 amRNSCompletion of Financing
17th Aug 20157:00 amRNSCompany Update and Company
31st Jul 20154:40 pmRNSSecond Price Monitoring Extn
31st Jul 20154:35 pmRNSPrice Monitoring Extension
31st Jul 20153:49 pmRNSDrilling Program Financing
29th Jul 20157:01 amRNSOperations and Production Update
30th Jun 20155:15 pmRNSExtension of Share Options
25th Jun 201511:08 amRNSResult of AGM
25th Jun 20157:00 amRNSCorporate Presentation & Operations Update
16th Jun 20154:35 pmRNSPrice Monitoring Extension
4th Jun 20155:12 pmRNSIssue of Equity and Total Voting Rights
2nd Jun 20157:00 amRNSFinal Results for the year ended 31 December 2014
20th May 20154:35 pmRNSPrice Monitoring Extension
1st May 20157:00 amRNSOperations Update
14th Apr 20151:43 pmRNSHolding(s) in Company
18th Feb 20157:00 amRNS2015 Plans and Operational Update
30th Jan 20157:00 amRNSJoint Development Agreements
19th Jan 20154:35 pmRNSPrice Monitoring Extension
14th Jan 20157:00 amRNSIssue of Equity and Total Voting Rights
12th Dec 20143:36 pmRNSIssue of Equity
9th Dec 20147:00 amRNSIssue of Equity
8th Dec 20147:00 amRNSOperational Strategy and Company Presentation
4th Dec 20147:00 amRNSCommodity Hedging Update
28th Nov 20147:00 amRNSIssue of Equity and Total Voting Rights
20th Nov 20147:00 amRNSProduction and Drilling Update
11th Nov 20142:58 pmRNSIssue of Equity and Total Voting Rights
24th Oct 20147:00 amRNSProduction and Drilling Update
20th Oct 201412:16 pmRNSResult of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.