Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.15
Bid: 1.10
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.10 (9.091%)
Open: 1.15
High: 1.15
Low: 1.15
Prev. Close: 1.15
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Star Zinc Initial Drilling Update

13 Feb 2018 09:45

RNS Number : 7274E
Galileo Resources PLC
13 February 2018
 

 

 

For immediate release

 

13 February 2018

Galileo Resources Plc

("Galileo" or "the Company")

Star Zinc Initial Drilling Update

 

Galileo is pleased to provide the following initial drilling update on the Star Zinc project ("Star Zinc") in Zambia. Galileo has a 51% interest in Star Zinc (with a right to increase this to an 85% interest). This update covers the first 750 metres (m) of a proposed estimated 1500m drilling campaign at Star Zinc.

Summary

 

· More than 750 m diamond core drilling (19 holes) completed to date on Star Zinc to depths of up to 70m

· Thirteen holes (vertical and inclined) intersected high-grade zinc (Zn) mineralization (willemite-hematite-calcite) over a strike length, to date, of approximately 100m

 

· Based on preliminary hand-held XRF spectrometry, the high-grade Zn intersections range from average a 15% Zn to 28% Zn over 7m to 15 m down hole.

 

· XRF point analyses obtained of up to 52% Zn

 

· Low to medium-grade Zn mineralised intervals also intersected

· The ore body remains open and several other peripheral and outlying geophysical and geochemical anomalies remain untested

· The area presently being drilled lies approximately at the centre of a newly delineated 4.4kilometre (km) long geochemical anomaly: +100ppm Zn (based on hand held XRF apectrometer assays).

· Next exploration phase is to continue drilling, embark on modelling of the data, in order to delineate the high grade mineralisation and metallurgical testing

 

a  average of regular spaced point readings (3 times) over the mineralised intersection . Whole length core samples are being submitted for independent and complete assay and will be announced in due course

 

Colin Bird, Chief Executive Officer, said: "This drilling programme has to date produced encouragingly high grade zinc intersections, that is leading us to revise our understanding of the geology of the deposit from that historically described by Charter Consolidated and others. We will continue drilling and embark on data modelling, in order to create a signature for and delineate the distribution of the various grades of mineralisation.

The historic model of mineralisaion of Star Zinc,based entirely on vertically drilled holes, suggested the mineralisation forms two irregular tabular lenses dipping shallowly both east and west of the Pit. Although the geological and structural controls on mineralisation are still to be fully understood, the latest drill data suggest the highest grade and thickest mineralizations are associated with a series of E-W faults (possible feeders.)"

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

Technical Sign-Off

Andrew Sarosi, Director of Galileo, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

 

You can also follow Galileo on Twitter: @GalileoResource

For further information, please contact:

Galileo Resources PLC

Colin Bird, Chairman

Andrew Sarosi, Executive Director

Tel +44 (0) 20 7581 4477 

 

Tel +44 (0) 1752 221937

 

 

Beaumont Cornish Limited - Nomad 

Roland Cornish/James Biddle

Tel +44 (0) 20 7628 3396

 

 

Beaufort Securities Limited - Broker

Jon Bellis/Elliot Hance

Tel +44 (0) 20 7382 8416

 

The Star Zinc Project

The Company recently acquired a 51% interest (right to potential 85% interest) in the Star Zinc project, a historical, high-grade zinc open pit mine operated intermittently in the 1950s to 1990s. The Zn mineral is predominantly willemite (zinc silicate) hosted in mainly limestone and dolostone (dolomitic rock). The Star Zinc project has a 4-year exploration licence commencing 14 August 2014. The Project is in the process of applying for a renewal of the licence for a further 4-year period.

An Independently verified non-JORC compliant hard rock resource has been estimated at 275,166 tonnes @ 20.2% Zn with a cut-off grade of 14% Zn ("pragmatic case") based on historical approximately 59 diamond drill holes for total 2,578m. At cut off grade of 12% Zn non-JORC resource tonnage increases (18%) to 325,941 tonnes @19.1% Zn (11% increase in Zn metal).

In addition, karstic fill deposits and red soil are locally heavily mineralised with detrital willemite and supergene zinc minerals, which may provide further potential increase to the known resource.

Mineralisation is interpreted to form two shallowly dipping lenses east and west of the open pit, mineralisation of which is around 40m deep, based on the independent model used for the resource calculation.

A number of sub vertical structures recognised in pit outcrop suggests possibility of both vertical and horizontal control of Zn mineralisation.

The Willemite at Star Zinc, fluoresces a bright green in short wave UV light, a mineral characteristic that may find an application in optical sorting. Willemite also, is denser (3.9 g/cm3) than the dolomitic (2.9 g/cm3) host rock, a feature that may find an application in heavy medium separation process, with the potential for reducing the acid consuming dolomite in the ore.

Preliminary metallurgical testwork indicates that the ore is amenable to acid leaching with more than 90% of the zinc leached into solution.

The Company has committed to undertake an 18-month work programme ("Programme") at a cost of US$250,000 using reasonable endeavours to complete a preliminary economic assessment of Star Zinc ("PEA"), following which further new shares in Enviro Zambia, the owner of the Project will be issued to Galileo to increase its aggregate equity interest in therein to 85%; accordingly it expects the Programme to meet this obligation.

Glossary

Detrital loose fragments or grains that have been worn away from rock

Calcite mineral of calcium carbonate

Dolomite mineral composed of calcium magnesium carbonate

Dolomitic pertaining to dolomite  

Floats pieces of rock that have been removed and transported from their original outcrop

Hematite a reddish-black mineral consisting of ferric oxide. It is an important ore of iron.

Karstic pertaining to landscape underlain by limestone (calcium carbonate), which has been eroded by dissolution, producing ridges, fissures and so on

 

Leaching chemical process of solubilising metals in rock into solution

ppm parts per million

XRF Spectrometer analytical instrument for determining chemical composition using x-ray fluorescence

 

Supergene  pertaining to processes or enrichment that occurs relatively near surface 

Willemite zinc silicate ore mineral

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLTJMLTMBJBMTP
Date   Source Headline
20th Jul 20227:00 amRNSPreliminary Drill Results at Shinganda Project
30th May 20227:00 amRNSExploration Update at Shinganda Project
17th May 20227:00 amRNSUpdate on progress at the Luansobe Copper Project
26th Apr 20227:30 amRNSExploration Start-up Over Lithium & Gold Projects
30th Mar 20229:30 amRNSGlenover Assets Sale Update
7th Mar 20227:00 amRNSOption Agreement over Lithium & Gold Projects
22nd Feb 20227:00 amRNSSecond Payment for Interest in Luansobe Project
11th Feb 20229:06 amRNSSecond Price Monitoring Extn
11th Feb 20229:00 amRNSPrice Monitoring Extension
11th Feb 20227:00 amRNSGlenover Assets Sale and Star Zinc Update
13th Jan 202211:15 amRNSData Compilation on the Luansobe Copper Project
4th Jan 20227:00 amRNSTotal Voting Rights
31st Dec 20217:52 amRNSInterim Results
30th Dec 202111:06 amRNSSecond Price Monitoring Extn
30th Dec 202111:00 amRNSPrice Monitoring Extension
30th Dec 20217:00 amRNSJV over Luansobe Copper Project, Zambia
23rd Dec 202112:50 pmRNSIssue of Equity and Total Voting Rights
9th Dec 20217:00 amRNSGlenover Assets Sale and Option to sell shares
7th Dec 20217:00 amRNSOption and JV over Shinganda Copper-Gold Project
30th Nov 20217:00 amRNSIssue of Equity & TVR
8th Nov 202111:05 amRNSSecond Price Monitoring Extn
8th Nov 202111:00 amRNSPrice Monitoring Extension
8th Nov 20217:00 amRNSDrilling update - Kalahari copper belt
26th Oct 20212:41 pmRNSResult of AGM
22nd Oct 20217:00 amRNSExercise of Warrants
4th Oct 20216:06 pmRNSExercise of Warrants
30th Sep 20217:45 amRNSFinal Results
16th Sep 20219:06 amRNSSecond Price Monitoring Extn
16th Sep 20219:00 amRNSPrice Monitoring Extension
16th Sep 20217:00 amRNSUpdate on sale of Kalahari Copper Belt Licences
3rd Sep 20218:29 amRNSTotal Voting Rights
1st Sep 20219:50 amRNSUpdate on sale of Kalahari Copper Belt Licences
18th Aug 20211:23 pmRNSExercise of Warrants and Total Voting Rights
2nd Aug 20217:00 amRNSUpdate on Sale of Kalahari Licences to Sandfire
30th Jun 20215:20 pmRNSTotal Voting Rights
15th Jun 20219:48 amRNSHolding(s) in Company
15th Jun 20217:00 amRNSHolding(s) in Company
1st Jun 20217:00 amRNSPlacing and TVR
13th May 20211:03 pmRNSExercise of Warrants, Total Voting Rights
11th May 202111:00 amRNSPrice Monitoring Extension
5th May 20212:33 pmRNSUpdate on Kalahari Copper Belt Project
30th Apr 20214:39 pmRNSTotal Voting Rights
13th Apr 20215:14 pmRNSExercise of Warrants
11th Mar 20213:45 pmRNSExercise of Warrants
11th Mar 20219:53 amRNSHolding(s) in Company
4th Mar 20219:05 amRNSSecond Price Monitoring Extn
4th Mar 20219:00 amRNSPrice Monitoring Extension
4th Mar 20217:30 amRNSSale of Star Zinc project & Strategy Update
25th Feb 20211:19 pmRNSExercise of Warrants
11th Feb 20212:10 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.