focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.075
Bid: 1.05
Ask: 1.10
Change: -0.025 (-2.27%)
Spread: 0.05 (4.762%)
Open: 1.10
High: 1.10
Low: 1.075
Prev. Close: 1.10
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Second Payment for Interest in Luansobe Project

22 Feb 2022 07:00

RNS Number : 3499C
Galileo Resources PLC
22 February 2022
 

For immediate release

 

22 February 2022

Galileo Resources Plc

("Galileo" or "the Company")

 

Update and Completion of Second Payment for 75% Interest in

Luansobe Copper Project, Zambia

 

Galileo Resources plc ("Galileo "or the "Company") is pleased to report on progress in modelling of historic drill data at Luansobe and the completion of the second payment to the vendors to secure an initial 75% interest in the Luansobe Copper Project, Zambia (the "Project") comprising Small Scale Exploration Licence No. 28340-HQ-SEL (the "Licence").

 

 

Highlights

 

· Considerable progress has been made by consultants Addison Mining Services in compilation of drill data for 154 holes (drilled 1921 to 2007) and initial modelling of the deposit

· Two concurrent development options are being considered;

o The potential for a small open pit mine of circa 3-5 million tonnes to exploit the up-dip portion of the copper deposit in the northwest of the licence area

o The prospect for a larger mine to develop the resources down-dip and along strike to the southeast where drill data is more sparse

· It is planned to commence preparation for shallow mining in the northwest before year end while undertaking a drilling campaign to confirm historic drill results and to further define a potentially larger resource towards the southeast

· The Company is making arrangements for the coming week to view drill core believed to be held at the nearby Mopani copper mine to further increase confidence in the historic drill reports

· The second payment in cash and shares has been made under the terms of the JV Agreement with the Luansobe Vendor to secure an initial 75% interest in the Project

 

 

Colin Bird Chairman & CEO said: "We are pleased with the outcome of the interrogation of historic drill data which indicates good potential for a small open pit in the range of 3-5 million tonnes of copper ore based on current economics. If the modelling continues to be satisfactory, we will prepare for commencement of a small open pit mining operation using third party contractors. We are particularly encouraged by the larger potential - we are planning for further drilling in the southeast of the property to test previous suggestions of larger tonnages and grades in excess of 1.5% Cu."

 

 

Joint Venture Summary and Update

As previously announced on 30 December 2021 the Company entered into a Joint Venture Agreement (the "JV Agreement") with Statunga Investments Limited (the "Vendor") covering the Luansobe Copper Project, Zambia comprising a Small Scale Exploration Licence.

 

The JV Agreement provides the Company the right to earn an initial 75% interest in a special purpose joint venture company (the "JV Company") by making an initial payment of US$200,000 and a second payment of US$200,000 in the initial period from the date of the JV Agreement by 20 February 2022 (the "Initial JV Period") and issuing 5,000,000 Galileo shares to the Vendor. The second payment has been completed and the shares will now be issued at a price of 1.125pence per share. The Company will now be issued 75% of the shares in a to be established Zambian joint venture company (the "JV Company") to own the Licence (subject to Ministerial Consent) and the Vendor will be issued 25% of the shares in the JV Company.

 

Application to trading on AIM: Application will be made to the London Stock Exchange for a total of 5,000,000 new Galileo Shares to be admitted to trading on AIM which rank pari passu to the existing ordinary shares in the Company. It is expected that Admission will become effective and that dealings in the new Galileo Shares will commence at 8.00 a.m. on 28 February 2022.

 

On Admission, the abovementioned figure of 1,096,946,844 Ordinary Shares (the "Enlarged Share Capital") may be used by shareholders in the Company as the denominator for the calculations by which they will determine if they are required to notify their interest in, or a change to their interest in, Galileo under the Financial Conduct Authority's Disclosure Guidance and Transparency Rules.

 

 

Project Background

The Luansobe area is situated some 15km to the northwest of Mufulira Mine in the Zambian Copperbelt which produced well over 9Mt of copper metal during its operation. It forms part of the northwestern limb of the northwest - southeast trending Mufulira syncline and is essentially a strike continuation of Mufulira, with copper mineralisation hosted in the same stratigraphic horizons. At the Luansobe prospect mineralisation occurs over two contiguous zones, dipping at 20-30 degrees to the northeast, over a strike length of about 3km and to a vertical depth of at least 1,250m.

 

The top 30m from surface is reported to be leached, with oxide mineralisation occurring below this depth to about 70m below surface. Beyond this depth, copper generally occurs as sulphides. The deposit is reported to be open and relatively untested at depth. About 30% of the total contained copper occurs in acid soluble form (as copper oxide) - this is expected to be higher in the shallower parts of the deposit.

 

 

Technical Sign-Off

Technical information in this announcement has been reviewed by Edward (Ed) Slowey, BSc, PGeo, Technical Director of Galileo. Mr Slowey is a geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved this announcement.

 

You can also follow Galileo on Twitter: @GalileoResource

 

For further information, please contact: Galileo Resources PLC

 

Colin Bird, Chairman

Tel +44 (0) 20 7581 4477

Beaumont Cornish Limited - Nomad

Roland Cornish/James Biddle

Tel +44 (0) 20 7628 3396

Novum Securities Limited - Joint Broker

Colin Rowbury /Jon Belliss

+44 (0) 20 7399 9400

Shard Capital Partners LLP - Joint Broker

Damon Heath

Tel +44 (0) 20 7186 9952

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFFLLLLLLXBBF
Date   Source Headline
8th Aug 20171:00 pmRNSConcordia Project Update
7th Aug 20179:08 amRNSHolding(s) in Company
6th Jul 20178:54 amRNSGlenover Project Update
26th Jun 20174:17 pmRNSConcordia Project Update
12th Jun 20172:12 pmRNSGlenover Phosphate - Pilot Plant Study Proposal
15th May 201710:54 amRNSConcordia Copper Project Update
12th May 20173:17 pmRNSUpdate regarding Orogen Gold JV on Silverton
24th Mar 20175:54 pmRNSUpdate regarding Orogen Gold JV on Silverton
1st Mar 201711:07 amRNSGeneral Update
15th Feb 20177:00 amRNSConcordia Copper Project - Drilling Commencement
9th Feb 201710:30 amRNSHolding(s) in Company
27th Jan 20175:07 pmRNSIssuance of Share Options
17th Jan 20179:39 amRNSConcordia Copper Project Update
9th Jan 20177:00 amRNSSilverton Project Update
20th Dec 20162:43 pmRNSHalf-year Report
19th Dec 20163:08 pmRNSChange of Registered Office
15th Dec 201611:07 amRNSConcordia Copper Project - Exploration Update
30th Nov 20169:04 amRNSConcordia Copper Project - update
1st Nov 20167:00 amRNSConcordia Copper Project Update
25th Oct 20167:00 amRNSNevada Projects Update
29th Sep 201612:29 pmRNSResult of AGM
7th Sep 20161:55 pmRNSFinal Results and Notice of AGM
7th Sep 20167:00 amRNSConcordia Project Update
31st Aug 20161:25 pmRNSSale of Gabbs Gold-Copper Property for US$2.5 m
30th Aug 201612:14 pmRNSLapsing of Agreement to sell interest in JV
30th Aug 20167:00 amRNSSale of Gabbs Gold-Copper Property for US$ 2 mill
22nd Aug 201612:40 pmRNSStudy increases Concordia potential size
27th Jun 20167:00 amRNSGalileo executes Silverton Farm-Out Agreement
15th Jun 20169:05 amRNSUpdate on Concordia Copper Project
10th May 201611:24 amRNSConcordia Project Update
4th May 201612:14 pmRNSTotal Voting Rights
27th Apr 20167:00 amRNSConcordia Copper Mineralisation
21st Apr 20162:00 pmRNSNevada Gold-Silver Deal Signed
21st Apr 20162:00 pmRNSSilverton Project Farm-Out
13th Apr 20169:43 amRNSConcordia Project initial independent modelling
5th Apr 20162:16 pmRNSIssue of Equity
4th Apr 201611:48 amRNSTotal Voting Rights
29th Mar 20161:41 pmRNSConcordia Project initial independent modelling
1st Mar 20162:56 pmRNSIssue of Equity, Directors' Dealings and TVR
26th Feb 20163:51 pmRNSExtension of Agreement to sell interest in JV
14th Jan 20169:06 amRNSConclusion of Concordia JV Agreement
4th Jan 20169:34 amRNSTotal Voting Rights
17th Dec 201512:01 pmRNSIssue of Equity
15th Dec 201512:50 pmRNSHalf Yearly Report
1st Dec 20154:39 pmRNSHolding(s) in Company
17th Nov 20157:00 amRNSCopper Project - Earn-in Option Signed
9th Nov 20151:26 pmRNSHolding(s) in Company
19th Oct 20157:00 amRNSCompany Update
30th Sep 201512:34 pmRNSResult of AGM
7th Sep 20155:14 pmRNSAudited Results and Notice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.