Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGeorgina Energy Regulatory News (GEX)

Share Price Information for Georgina Energy (GEX)

Share Price is delayed by 15 minutes
Get Live Data
6.50    0.30 (4.84%)
Bid:
6.40
Ask:
6.60
Spread: 0.20 (3.125%)
Market Cap: £13.50m
GEX Live PriceLast checked at - London Stock Exchange

Intraday Georgina Energy Share Chart

CONTRACT SIGNED FOR HUSSAR WELL RE-ENTRY

19 Aug 2024 07:55

RNS Number : 8989A
Mining, Minerals & Metals PLC
19 August 2024
 

 

19 August 2024

 

 

Mining, Minerals & Metals plc (to be re-named Georgina Energy Plc)

 

("Georgina" "Georgina Energy" or the "Company")

 

CONTRACT SIGNED FOR HUSSAR WELL RE-ENTRY

 

Mining Minerals & Metals plc (to be re-named Georgina Energy Plc) GEX.L is pleased to announce the following Well Re-development Program.

 

The Company has engaged Aztech Well Construction to project manage the well re-entry at Hussar EP513 in the Officer Basin. Aztech is highly experienced at providing well project management and engineering solutions with over 14 years of experience managing drilling operations in onshore Australia having drilled over 40 wells in the Perth Basin between 2011 and 2023.

 

Re-entry Hussar EP513 Officer Basin Western Australia

 

· Westmarket Oil & Gas Pty Ltd, Georgina Energy's wholly owned operating subsidiary is anticipating the well re- entry program commencing in December 2024, subject the granting of a Drilling Permit from DEMIRS.

· The company plans to extend the original well drilled in 1982 to 2040m TD to 3400m to penetrate the subsalt Townsend Formation, the subsalt target reservoir which has been independently assessed to host large volumes of Helium, Hydrogen and gaseous hydrocarbon prospective recoverable resources.

· Previous exploration wells drilled in the 1980's in the Officer Basin targeted oil and did not penetrate the now targeted subsalt Townsend Formation; the basal sandstone of the Officer Basin which is the lateral equivalent to the Helium, Hydrogen and gaseous hydrocarbon bearing Heavitree Formation in the Amadeus Basin; both basins being sub-basins of the Neoproterozoic Centralian Superbasin.

· The Company is currently completing the required process for engineering design, HSE and environmental approvals as well as meeting its obligations under the Native Title Land Access agreement.

· The re-grading of the immediately adjacent airstrip along with site preparations is proceeding as planned.

· The Company and its consultants have also determined that the Hussar 1 wellhead top plate has an inspection valve fitted which will be inspected by Aztech for any possible pressure buildup prior to re-entry.

· Aztech's Senior Well Engineer, Connie Callison, has been assigned to work with the Company's technical team. She has extensive and comprehensive specialist experience in well intervention, drilling and completions, having previously worked for Chevron in both Australia and the USA.

· Georgina Energy has clearly stated its aspirations to become a global partner in the Helium and Hydrogen market and this program forms a critical part of its well re-development program.

 

 

Anthony Hamilton, Chief Executive Officer of Georgina Energy, commented:

"Georgina Energy has spent the past five years investing over GBP6.5million, with GBP2.5million contributed by the Directors, to develop its strategy of well re-development in Australia. This program aims to achieve positive outcomes in the exploration for natural gas, hydrogen and helium. The execution of the Hussar contract marks the first step in proving this concept."

 

 

END

 

Enquiries

 

Georgina Energy

Tony Hamilton

via georginaenergy@apcoworldwide.com

Mark Wallace

 

 

Tavira Financial Ltd - Financial Adviser and Joint Broker

Jonathan Evans

+44 (0)20 3833 3719

Oliver Stansfield

 

Oak Securities - Joint Broker

Jerry Keen

 +44 (0)203 973 3678

Henry Clarke

Dillon Anadkat

 

Financial PR via georginaenergy@apcoworldwide.com

Violet Wilson

+44 (0)203 757 4980

Letaba Rimell

 

 

Notes to Editors

 

Georgina Energy aims to become a leading player in the global energy market and is focused on establishing itself among the top producers of Helium and Hydrogen worldwide. With a strategic approach and leveraging the experienced management team's expertise, Georgina Energy aims to capitalize on opportunities in these critical energy sectors.

 

The projects benefit from established infrastructure and a reliable supply chain, offering significant resource potential through low-risk, cost-effective drilling projects.

 

Georgina Energy has two principal onshore interests held through its wholly owned Australian subsidiary, Westmarket Oil & Gas. The first, the Hussar Prospect is located in the Officer Basin in Western Australia and Westmarket O&G holds a 100% working interest in the exploration permit. Georgina also has a right to earn an initial 75% interest (with the potential to extend to 90%) in a second prospect, EPA155 Mt Winter Prospect, is located in the Amadeus Basin in the Northern Territory, subject to the granting of the permit application.

 

In line with market demand trends, Georgina Energy is well-positioned to capitalize on the growing gap between supply and demand for Helium and Hydrogen with the independently verified prospective recoverable resource potential of the Hussar and Mt Winter projects.

 

For more information visit https://www.georginaenergy.com

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
CNTPLMFTMTIBMMI
Date   Source Headline
4th Jun 202610:28 amRNSRepayment of Debt
2nd Jun 20267:00 amRNSIssue of Equity
1st Jun 202610:49 amRNSCompletion of £1 Million Fundraise
29th May 20269:03 amRNSAudited Final Results for Year Ended 31 Jan 2026
27th May 20264:42 pmRNSExercise of Warrants
26th May 20267:00 amRNSHussar EP513 Pre-Drill Works
22nd May 20268:16 amRNSIssue of Equity
20th May 20267:00 amRNSHussar EP513 Drill Contract Executed
6th May 202610:27 amRNSTermination of share purchase agreement
1st May 20267:04 amRNSCompletion of £1 Million Fundraise
28th Apr 202611:17 amRNSIssue of Equity
20th Apr 202611:59 amRNSResults of General Meeting
16th Apr 20269:48 amRNSHussar EP513 Drill Contract
27th Mar 20267:10 amRNSNet Asset Value(s)
25th Mar 20265:07 pmRNSPosting of Circular and Notice of AGM
13th Mar 20267:10 amRNSNet Asset Value(s)
12th Mar 20267:00 amRNSHussar EP513 Drill Contract Update
10th Mar 20267:10 amRNSNet Asset Value(s)
4th Mar 20267:00 amRNSHussar EP513 Drill Preparations Update
24th Feb 20267:00 amRNSMt Winter EPA 155 ALRA RECEIVED
17th Feb 20267:00 amRNSHussar EP513 Site Inspection
13th Feb 20267:30 amRNS-RBroker Research Initiation
5th Feb 20267:00 amRNSHussar EP513 Drill Operations Site Inspection
30th Jan 202611:16 amRNSDebt Drawdown of £500,000
29th Jan 20261:17 pmRNSHolding(s) in Company
26th Jan 20267:00 amRNSHussar EP513 Drilling/Funding
19th Dec 20257:00 amRNSOFFTAKE MOU EXTENSION EXECUTED
19th Dec 20257:00 amRNSOFFTAKE MOU EXTENSION EXECUTED
9th Dec 20257:00 amRNSOperational Update
20th Nov 20257:16 amRNSExpression of Interest to Fund Hussar EP513
14th Nov 20257:00 amRNSReplacement: Placing and Debt Facility
11th Nov 202510:00 amRNSACQUISITION OF ADDITIONAL RE-ENTRY TARGETS
4th Nov 20259:23 amRNSPlacing and Debt Facility
31st Oct 20257:47 amRNSHussar EP513 Drilling Approval
30th Oct 202511:20 amRNSHussar EP513 Drilling Approval Obtained
27th Oct 20257:33 amRNSInterim Results
22nd Oct 202510:52 amRNSHussar EP513 Environmental Plan APPROVAL
28th Aug 202510:53 amRNS£1m Fundraise to Advance Hussar & Mt Winter
28th Aug 20257:44 amRNSOFF-TAKE MOU EXECUTED AND PERMIT UPDATE
26th Aug 20257:01 amRNSOFFTAKE PROPOSAL & Helium-3 POTENTIAL
19th Aug 20257:00 amRNSMt Winter EPA 155 Update
18th Aug 20257:00 amRNSHussar EP513 Drilling Approval Update
6th Aug 20251:07 pmRNSResult of AGM
14th Jul 20257:00 amRNSHussar EP513 WELL MANAGEMENT PLAN APPROVAL
10th Jul 20257:00 amRNSRevised Resource Upgrade of 37.8% EPA155 Mt Winter
8th Jul 20257:00 amRNSMt Winter EPA 155 Update
7th Jul 20258:30 amRNSNotice of Annual General Meeting
7th Jul 20257:00 amRNSHussar EP513 Update
4th Jul 20254:00 pmRNSRestoration of Trading
30th Jun 20257:00 amRNS2025 Audited Final Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.