Less Ads, More Data, More Tools Register for FREE

Pin to quick picksG3 Exploration Regulatory News (G3E)

  • This share is currently suspended. It was suspended at a price of 27.40
  • There is currently no data for G3E

Operations Update

16 Jan 2012 07:00

RNS Number : 5760V
Green Dragon Gas Ltd
16 January 2012
 



16 January 2012

 

GREEN DRAGON GAS LTD

("Green Dragon" or "the Company")

 

Total Wells Drilled up 131%, Gas Production up 126%

and Enhanced Gas Sales Capacity

 

 

Green Dragon Gas, one of the largest independent companies involved in the production of CBM gas and the distribution and sale of wholesale gas in China, is pleased to announce further substantial progress towards monetisation of its significant gas assets in China.

 

Drilling / Operations:

 

During 2011, Green Dragon drilled an additional 67 wells (29 in 2010), an increase of 131% year on year.

 

The acceleration in the number of wells drilled is a reflection of the Company's shift in focus from exploration wells to the roll out of production wells across the Shizhuang South (GSS) Block. The increase in the rate of wells drilled is also in line with Green Dragon's discretionary capex spend of US$250m aimed at significantly increasing gas production.

 

Of the additional wells drilled, 53 were vertical wells and 14 were LifaBriC wells. The greater number of vertical wells drilled was as a result of rig availability and the Company's focus during the fourth quarter on building a bank of vertical wells ahead of the arrival of additional rigs contracted from Greka Drilling Limited (AIM: GDL) able to drill the lateral sections of the LiFaBriC wells.

 

Whilst the focus was at the GSS production block, the Company continued to drill in the five exploration blocks in 2011, with five wells drilled at Guizhou (GGZ), four wells drilled at Qinyuan (GQY), two wells drilled at both Fencheng (GFC) and Panxie East (GPX) and one well at Shizhuang North (GSN). This exploration drilling exceeded the requirements under the Production Sharing Contracts (PSCs).

 

Upstream: Production

 

Fourth quarter production was 407.49MMcf (11,543,652 cubic metres) an increase of 126% year on year. As at 31 December 2011, the annualised exit rate of production increased again to 1.68Bcf (47,489,420 cubic metres). The increase in production is in line with the drilling of additional production wells.

 

Midstream Infrastructure and Downstream Gas Sales:

 

The Company's downstream business has entered into an agreement for the supply of compressed natural gas (CNG) to a CNG gas refilling station capable of delivering 1,059 Mcf per day (30,000 cubic metres) for use by a fleet vehicle transportation business located in Wen Xian, Henan, China. Conversion of an existing diesel filling station is underway and the conversion of 150 trucks from diesel to CNG will commence shortly.

 

The growth of the Company's CNG vehicle refilling station network is in line with its strategy to distribute gas produced by its upstream CBM operations directly to end users, thereby gaining a significant uplift in pricing value.

 

In Midstream, the Company also continued to connect the spur pipeline linking the Huabei gas gathering station to the main West East trunk pipeline, which will enable gas sales to PetroChina Huabei to commence as planned in the second quarter of 2012.

 

Randeep Grewal, CEO and Founder of Green Dragon, commented:

 

"Green Dragon has continued to make solid progress across all business lines from the production of gas through to both CNG sales direct to the end user and via pipeline into the main national network. As a result, we remain on target to meet the aggressive growth targets put in place by the Company.

 

The market has long appreciated the environmental benefits and the cost savings of CNG versus diesel. One of the barriers to the rapid CNG conversion of City-to-City fleet transport hubs has been the lack of a stable supply of gas which we are well-positioned to provide and at prices that are increasingly being supported by favourable Government policy measures. The value to the overall business will become increasingly apparent as momentum continues to build from the additional production wells in a proven resource area with a proven commercial drilling fleet contracted from Greka Drilling Limited."

 

For further information on the Company and its activities, please refer to the website at www.greendragongas.comor contact:

 

Stephen Hill

Green Dragon Gas

 

+852 3710 0168

Dr Azhic Basirov / David Jones

Smith &Williamson - Nomad & Broker

 

+44 20 7131 4000

Paul Connolly / John Dwyer / Steve Baldwin

Macquarie Capital (Europe) - Broker

 

+44 20 3037 2000

James Henderson / Phillip Dennis

Pelham Bell Pottinger - Investor Relations

 

+44 20 7861 3800

Robyn Joseph

Kreab Gavin Anderson - Public Relations

 

+852 3753 6020

 

Note

Mcf means thousands of cubic feet; MMcf means millions of cubic feet; Bcf means billions of cubic feet.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZMGMMNFDGZZM
Date   Source Headline
31st Dec 201512:00 pmRNSChange of Adviser
18th Nov 20157:00 amRNSCorporate presentation
17th Aug 20157:00 amRNSInterim results
23rd Jul 20152:23 pmRNSResult of AGM
23rd Jul 20157:00 amRNSOperations Update
30th Apr 20152:13 pmRNSAnnual Report and Notice of AGM
21st Apr 20157:00 amRNSAnnual Results for the Year Ended 31 December 2014
20th Apr 20157:00 amRNSNotice of Results
25th Mar 20157:00 amRNS1st LiFaBriC well over 1Bcf cumulative production
24th Feb 20157:00 amRNSAudited Reserves Update
10th Feb 20154:35 pmRNSPrice Monitoring Extension
26th Jan 20157:00 amRNSOperations Update
7th Jan 20157:00 amRNSDrilling Order
18th Dec 20147:00 amRNSExercise of Warrants for a consideration of $43m
8th Dec 20147:00 amRNSBond Listing on the Nordic ABM
4th Dec 20147:00 amRNSBond Redemption
13th Nov 20147:00 amRNSCorporate Bond Issuance
4th Nov 20147:04 amRNSSigning of Offtake Agreement
27th Oct 20147:00 amRNSFirst Day of Dealings on the Main Market
22nd Oct 20147:00 amRNSChange of Adviser
21st Oct 20142:57 pmRNSPublication of Prospectus and Reserves Update
26th Sep 201410:16 amRNSMove to Main Market
16th Sep 20147:00 amRNSChange of Adviser
15th Sep 20147:00 amRNSHalf Yearly Report
29th Aug 201410:00 amRNSConocoPhillips Settlement
11th Aug 20147:30 amRNSPetroChina Cooperation Agreement
16th Jul 201411:53 amRNSResult of AGM
14th Jul 20146:00 pmRNSTransaction in Shares
11th Jul 20147:00 amRNSTransaction in Shares
25th Jun 201411:00 amRNSAnnual Report and Notice of Annual General Meeting
9th Jun 20147:00 amRNSFinal Results
5th Jun 20147:00 amRNSConvertible Bond
3rd Jun 201411:29 amRNSNotice of Results
3rd Jun 20147:00 amRNSIssue of Equity
12th May 20147:00 amRNSReserves Update
22nd Apr 20147:01 amRNSManagement Road Show
2nd Apr 20147:00 amRNSCNOOC and CUCBM Agreement
21st Jan 20147:00 amRNSOperations Update
16th Jan 20147:50 amRNSGas processing and Electricity Costs
15th Jan 20147:00 amRNSDrilling Order
16th Dec 20137:00 amRNSConvertible Bond
12th Dec 20137:00 amRNSMOU with PetroChina
2nd Dec 20137:00 amRNSArbitral Award Appeal
29th Oct 20139:46 amRNSHeads of Agreement with CNOOC
28th Oct 20137:00 amRNSReserves Update
21st Oct 20137:00 amRNSOperations Update
8th Oct 20139:15 amRNSSignificant Drilling Development
23rd Sep 20137:00 amRNSHalf Yearly Report
16th Sep 20137:00 amRNSSch 1 - Greka Engineering & Technology Ltd
16th Sep 20137:00 amRNSDemerger Dividend

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.